Summary

PRPL202406718
Plumbing
Expired
PORT AUTHORITY OF THE CITY OF BLOOMINGTON
Other
Plumbing for a new parking ramp
05/23/2024
06/03/2024
02/15/2025

Locations

Permits

Permit Number: PRPL202406718

Plumbing
Expired
06/03/2024
02/15/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Final Inspection Pending
Plumbing Rough-in Inspection Pending
Plumbing Rough-in Inspection Partial Pass 8/1/2024 (12:30 - 2:30) 8/1/2024 (PM) 08/05/2024
Inspection
Corrections:


Miscellaneous/Other
Comment Only
08/01/2024
Partial underground piping in parking ramp With 5 pound air test looks good.

Plumbing Rough-in Inspection Not Ready 8/7/2024 (12:30 - 2:30) 8/7/2024 (PM) 08/06/2024
Plumbing Rough-in Inspection Partial Pass 8/6/2024 (12:30 - 2:30) 08/07/2024
Corrections:


Miscellaneous/Other
Comment Only
08/07/2024
Underground looks good with 5 pound air test on another section.

Plumbing Rough-in Inspection Partial Pass 8/8/2024 (12:30 - 2:30) 8/8/2024 (PM) 08/08/2024
Corrections:


Miscellaneous/Other
Comment Only
08/08/2024
Four inch elevator pit drain to tank looks good. Five pound test on drain checks out OK.

Plumbing Rough-in Inspection Not Ready 8/9/2024 (12:30 - 2:30) 8/9/2024 (PM) 08/09/2024
CANCELLED
Plumbing Rough-in Inspection Partial Pass 8/12/2024 (2:30 - 3:30) 8/12/2024 (PM) 08/12/2024
Corrections:


Miscellaneous/Other
Comment Only
08/12/2024
Visual of 6 inch sanitary underground looks good. Need to see air test on it yet.

Plumbing Rough-in Inspection Partial Pass 8/13/2024 (2:30 - 3:30) 8/13/2024 (PM) 08/13/2024
Corrections:


Miscellaneous/Other
Comment Only
08/13/2024
Visual of 6" sanitary from Flam. Tank to main branch looks good with 5 pound air test.

Plumbing Rough-in Inspection Partial Pass 8/14/2024 (12:30 - 2:30) 8/14/2024 (PM) 08/14/2024
Corrections:


Miscellaneous/Other
Comment Only
08/14/2024
Air test good from Tank to Frist core Drill wall. plumber said there will be air on the hole run at the end

Plumbing Rough-in Inspection Partial Pass 8/15/2024 (12:30 - 2:30) 8/15/2024 (PM) 08/15/2024
Corrections:


Miscellaneous/Other
Comment Only
08/15/2024
Flammable waste tank checks out OK. Main run for flammable waste underground looks good with test. Contractor will be doing the rest of the branches for next inspection.

Plumbing Rough-in Inspection Partial Pass 8/16/2024 (12:30 - 2:30) 8/16/2024 (PM) 08/16/2024
Plumbing Rough-in Inspection Partial Pass 8/19/2024 (12:30 - 2:30) 8/19/2024 (PM) 08/19/2024
underground inspection
Corrections:


Miscellaneous/Other
Comment Only
08/19/2024
Underground inspections complete.