PRPL202406718
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Final Inspection | Pending | |||
Plumbing Rough-in Inspection | Pending | |||
Plumbing Rough-in Inspection | Partial Pass | 8/1/2024 (12:30 - 2:30) | 8/1/2024 (PM) | 08/05/2024 |
Inspection | ||||
Corrections:
Miscellaneous/Other
Comment Only
08/01/2024
Partial underground piping in parking ramp With 5 pound air test looks good.
|
||||
Plumbing Rough-in Inspection | Not Ready | 8/7/2024 (12:30 - 2:30) | 8/7/2024 (PM) | 08/06/2024 |
Plumbing Rough-in Inspection | Partial Pass | 8/6/2024 (12:30 - 2:30) | 08/07/2024 | |
Corrections:
Miscellaneous/Other
Comment Only
08/07/2024
Underground looks good with 5 pound air test on another section.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/8/2024 (12:30 - 2:30) | 8/8/2024 (PM) | 08/08/2024 |
Corrections:
Miscellaneous/Other
Comment Only
08/08/2024
Four inch elevator pit drain to tank looks good. Five pound test on drain checks out OK.
|
||||
Plumbing Rough-in Inspection | Not Ready | 8/9/2024 (12:30 - 2:30) | 8/9/2024 (PM) | 08/09/2024 |
CANCELLED | ||||
Plumbing Rough-in Inspection | Partial Pass | 8/12/2024 (2:30 - 3:30) | 8/12/2024 (PM) | 08/12/2024 |
Corrections:
Miscellaneous/Other
Comment Only
08/12/2024
Visual of 6 inch sanitary underground looks good. Need to see air test on it yet.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/13/2024 (2:30 - 3:30) | 8/13/2024 (PM) | 08/13/2024 |
Corrections:
Miscellaneous/Other
Comment Only
08/13/2024
Visual of 6" sanitary from Flam. Tank to main branch looks good with 5 pound air test.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/14/2024 (12:30 - 2:30) | 8/14/2024 (PM) | 08/14/2024 |
Corrections:
Miscellaneous/Other
Comment Only
08/14/2024
Air test good from Tank to Frist core Drill wall.
plumber said there will be air on the hole run at the end
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/15/2024 (12:30 - 2:30) | 8/15/2024 (PM) | 08/15/2024 |
Corrections:
Miscellaneous/Other
Comment Only
08/15/2024
Flammable waste tank checks out OK. Main run for flammable waste underground looks good with test. Contractor will be doing the rest of the branches for next inspection.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/16/2024 (12:30 - 2:30) | 8/16/2024 (PM) | 08/16/2024 |
Plumbing Rough-in Inspection | Partial Pass | 8/19/2024 (12:30 - 2:30) | 8/19/2024 (PM) | 08/19/2024 |
underground inspection | ||||
Corrections:
Miscellaneous/Other
Comment Only
08/19/2024
Underground inspections complete.
|