Permit Application Status

PRPL202414202


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRPL202414202
Plumbing
Permit(s) Issued
POLAR SEMICONDUCTOR INC
Alteration/Repair/Replace
Remodel of 3 existing buildings. Updated to Add the following: See attached addendums
10/25/2024
11/25/2024
01/13/2026

Locations

Permits

Permit Number: PRPL202414202

Plumbing
Issued
11/25/2024
01/13/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Final Inspection Pending
Underground Plumbing Inspection Pending
Plumbing Rough-in Inspection Pending 8/4/2025 (12:30 - 2:30) 8/4/2025 (PM)
Plumbing Rough-in Inspection Partial Pass 12/16/2024 (12:30 - 2:30) 12/16/2024 (PM) 12/16/2024
Corrections:


Miscellaneous/Other
Comment Only
12/16/2024
East side P1 LL zone 1 Air test on underground holds and piping meets code. Okay to cover.

Plumbing Rough-in Inspection Partial Pass 1/2/2025 (8:00 - 10:00) 1/2/2025 (AM) 01/02/2025
underground
Corrections:


Miscellaneous/Other
Comment Only
01/02/2025
Piping for acid waste,trench drains on underground in P1 lower level looks good with 5 pound air test.

Plumbing Rough-in Inspection Partial Pass 1/28/2025 (10:00 - 12:00) 1/28/2025 (AM) 01/28/2025
Corrections:


Miscellaneous/Other
Comment Only
01/28/2025
Visual inspection and air tests for floor drain piping and bathroom group okay.

Plumbing Rough-in Inspection Partial Pass 2/20/2025 (8:00 - 10:00) 2/20/2025 (AM) 02/20/2025
Corrections:


Miscellaneous/Other
Comment Only
02/20/2025
Venting for acid waste in P1 with 5 pound air test looks good.

Plumbing Rough-in Inspection Partial Pass 2/25/2025 (10:00 - 12:00) 2/25/2025 (AM) 02/25/2025
Corrections:


Miscellaneous/Other
Comment Only
02/25/2025
Piping underground for storm on east side with 5 pound air test looks good to cover.

Plumbing Rough-in Inspection Partial Pass 5/13/2025 (12:30 - 2:30) 5/13/2025 (PM) 05/13/2025
Plumbing Final Inspection Partial Pass 5/13/2025 (12:30 - 2:30) 5/13/2025 (PM) 05/13/2025
Underground Plumbing Inspection Partial Pass 5/20/2025 (8:00 - 10:00) 5/20/2025 (AM) 05/20/2025
Corrections:


Miscellaneous/Other
Comment Only
05/20/2025
Underground on P2 loading dock with sump basin. Air test is good.

Plumbing Rough-in Inspection Partial Pass 6/25/2025 (10:00 - 12:00) 6/25/2025 (AM) 06/25/2025
Corrections:


Miscellaneous/Other
Comment Only
06/25/2025
P – one first floor bathroom remodel looks good.

Plumbing Rough-in Inspection Partial Pass 7/17/2025 (12:30 - 2:30) 7/17/2025 (PM) 07/17/2025
Corrections:


Miscellaneous/Other
Comment Only
07/17/2025
Inspection of roof drains and piping on East side of new building okay.