Summary

PRPL202414202
Plumbing
Permit(s) Issued
;
POLAR SEMICONDUCTOR INC
Alteration/Repair/Replace
Remodel of 3 existing buildings. Updated to Add the following: See attached addendums
10/25/2024
11/25/2024
05/05/2026

Locations

Permits

Permit Number: PRPL202414202

Plumbing
Issued
11/25/2024
05/05/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Final Inspection Pending
Underground Plumbing Inspection Pending
Progress Inspection Pending
Plumbing Rough-in Inspection Pending
Plumbing Rough-in Inspection Partial Pass 12/16/2024 (12:30 - 2:30) 12/16/2024 (PM) 12/16/2024
Corrections:


Miscellaneous/Other
Comment Only
12/16/2024
East side P1 LL zone 1 Air test on underground holds and piping meets code. Okay to cover.

Plumbing Rough-in Inspection Partial Pass 1/2/2025 (8:00 - 10:00) 1/2/2025 (AM) 01/02/2025
underground
Corrections:


Miscellaneous/Other
Comment Only
01/02/2025
Piping for acid waste,trench drains on underground in P1 lower level looks good with 5 pound air test.

Plumbing Rough-in Inspection Partial Pass 1/28/2025 (10:00 - 12:00) 1/28/2025 (AM) 01/28/2025
Corrections:


Miscellaneous/Other
Comment Only
01/28/2025
Visual inspection and air tests for floor drain piping and bathroom group okay.

Plumbing Rough-in Inspection Partial Pass 2/20/2025 (8:00 - 10:00) 2/20/2025 (AM) 02/20/2025
Corrections:


Miscellaneous/Other
Comment Only
02/20/2025
Venting for acid waste in P1 with 5 pound air test looks good.

Plumbing Rough-in Inspection Partial Pass 2/25/2025 (10:00 - 12:00) 2/25/2025 (AM) 02/25/2025
Corrections:


Miscellaneous/Other
Comment Only
02/25/2025
Piping underground for storm on east side with 5 pound air test looks good to cover.

Plumbing Rough-in Inspection Partial Pass 5/13/2025 (12:30 - 2:30) 5/13/2025 (PM) 05/13/2025
Plumbing Final Inspection Partial Pass 5/13/2025 (12:30 - 2:30) 5/13/2025 (PM) 05/13/2025
Underground Plumbing Inspection Partial Pass 5/20/2025 (8:00 - 10:00) 5/20/2025 (AM) 05/20/2025
Corrections:


Miscellaneous/Other
Comment Only
05/20/2025
Underground on P2 loading dock with sump basin. Air test is good.

Plumbing Rough-in Inspection Partial Pass 6/25/2025 (10:00 - 12:00) 6/25/2025 (AM) 06/25/2025
Corrections:


Miscellaneous/Other
Comment Only
06/25/2025
P – one first floor bathroom remodel looks good.

Plumbing Rough-in Inspection Partial Pass 7/17/2025 (12:30 - 2:30) 7/17/2025 (PM) 07/17/2025
Corrections:


Miscellaneous/Other
Comment Only
07/17/2025
Inspection of roof drains and piping on East side of new building okay.

Plumbing Rough-in Inspection Partial Pass 8/4/2025 (12:30 - 2:30) 8/4/2025 (PM) 08/04/2025
Corrections:


Miscellaneous/Other
Comment Only
08/04/2025
Air test on roof drains in P1 loading dock is good.

Progress Inspection Partial Pass 9/2/2025 (10:00 - 12:00) 9/2/2025 (AM) 09/02/2025
Corrections:


Miscellaneous/Other
Comment Only
09/02/2025
Bathroom fixtures look good.

Plumbing Rough-in Inspection Partial Pass 11/6/2025 (8:00 - 10:00) 11/6/2025 (AM) 11/06/2025
Corrections:


Miscellaneous/Other
Comment Only
11/06/2025
Air test on roof drains near elevator approved in area one. Progress inspection also is good.