PRPL202503740
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Rough-in Inspection | Partial Pass | 4/15/2025 (2:30 - 3:30) | 4/15/2025 (PM) | 04/15/2025 |
Corrections:
Miscellaneous/Other
Comment Only
04/15/2025
Inspection is needed on shower pan.
|
||||
Plumbing Final Inspection | Passed | 4/17/2025 (8:00 - 10:00) | 4/17/2025 (AM) | 04/17/2025 |
Plumbing Rough-in Inspection | Passed | 4/24/2025 (12:30 - 2:30) | 4/24/2025 (PM) | 04/24/2025 |
Corrections:
Miscellaneous/Other
Comment Only
04/24/2025
Shower pan test was previously viewed by inspector when also viewing the firestop at floor. Water proffing liquid applied product was used to cover the firestop of the removed shower piping where washer now sits, and the same product was used for the new shower base... approved
|