PRPLPL201700190
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Final Inspection | Pending | |||
Corrections:
Miscellaneous/Other
Outstanding
05/24/2017
Escalator drain increased to 3"
Elevator overflow pan still needs to be increased to 3". Have inspection done before firecaulking.
|
||||
Plumbing Final Inspection | Failed | 5/24/2017 (8:00 - 10:00) | 5/24/2017 | 05/24/2017 |
Corrections:
Miscellaneous/Other
Carried Forward
05/24/2017
Escalator drain increased to 3"
Elevator overflow pan still needs to be increased to 3". Have inspection done before firecaulking.
|