PRST201702744
Structural
Finaled
;
GWR MINNESOTA PROPERTY OWNER LLC
New
Not Required
Not Required
Structural steel on interior of building, framing of interior spaces on level 0, 1, 2, exterior wall. Great Wolf Resort.
04/19/2017
04/21/2017
07/21/2018
01/22/2018

Locations

Permits

Permit Number: PRST201702744

Building
Finaled
04/21/2017
07/21/2018

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Framing Inspection Partial Pass 5/24/2017 (8:00 - 10:00) 5/24/2017 05/24/2017
Corrections:


Miscellaneous/Other
Comment Only
05/24/2017
Meeting with general contractor and drywall/framer about inspections and what we expect to see in moving forward with work. Firestops to be addressed per trades with systems per the type of piping being used or open holes in which they will have. Viewed framing of wall and roof system at the bumpout, ok to proceed though permit has not yet been released for that scope of work.

Framing Inspection Partial Pass 6/12/2017 (8:00 - 10:00) 6/12/2017 06/12/2017
Corrections:


Miscellaneous/Other
Comment Only
06/12/2017
60 min grade "D" paper, lath, weeps, and fastening approved.

Framing Inspection Partial Pass 6/13/2017 (8:00 - 10:00) 6/13/2017 06/13/2017
Corrections:


Miscellaneous/Other
Comment Only
06/13/2017
Remaining section of wall for stucco approved.

Framing Inspection Partial Pass 6/20/2017 (10:00 - 12:00) 6/20/2017 06/20/2017
Corrections:


Miscellaneous/Other
Comment Only
06/20/2017
Framing in level "P" . Add framing to openings through walls where span s over 24". Cleat over notched studs at piping. Reinspection needed.

Framing Inspection Partial Pass 6/22/2017 (10:00 - 12:00) 6/22/2017 06/22/2017
Corrections:


All corrections have been made.
Comment Only
06/22/2017
All corrections have been made in lower level. Ok to start covering. Ok to top out at connector area on 1st floor. Rated walls in lower level to be inspected for the first layer.

Framing Inspection Partial Pass 6/28/2017 (8:00 - 10:00) 6/28/2017 06/28/2017
Corrections:


Miscellaneous/Other
Comment Only
06/28/2017
LL 2 hr. Wall 1st layer of gypsum approved.

Framing Inspection Partial Pass 7/14/2017 (8:00 - 10:00) 7/14/2017 07/14/2017
Corrections:


Miscellaneous/Other
Comment Only
07/14/2017
Basement needs to be fire stopped at penetrations through the rated wall & Build rated soffit around pipe at rated wall that is restrictive of completion of wall rating. 2nd floor rated walls between units to be firestopped at penetrations. Buck horn, grab n go, kids store.. ok to patch and cover walls. Stair 5 footing and dowels approved for concrete.

Framing Inspection Partial Pass 7/27/2017 (10:00 - 12:00) 7/27/2017 07/27/2017
Corrections:


Miscellaneous/Other
Comment Only
07/27/2017
Candy store, Magi Quest north wall, approved to cover walls. Buckets seating area, approved to cover walls.

Framing Inspection Partial Pass 8/7/2017 (2:30 - 3:30) 8/7/2017 08/07/2017
Corrections:


Miscellaneous/Other
Comment Only
08/07/2017
Viewed section of corridor at basement egress to stair 5. Fire caulking and finish of wallboard needed. Room 259 shaft wall approved to close up wall with picture do firecaulking sent to inspector.

Framing Inspection Partial Pass 8/11/2017 (12:30 - 2:30) 8/11/2017 08/11/2017
Corrections:


Miscellaneous/Other
Comment Only
08/11/2017
2nd floor stair at corridor walls and into the first part of stairway does not have a rating of 2 hours. To be looked into by city and contractor. Duct riser patching on 2nd floor approved to cover remaining of 2 hour sealing. Shaft wall framing by the stair approved, needs fire caulking at piping.

Framing Inspection Partial Pass 8/17/2017 (12:30 - 2:30) 8/17/2017 08/17/2017
Corrections:


Miscellaneous/Other
Comment Only
08/17/2017
Ceiling in "Buckets" approved to cover pending sprinkler inspection, no covering soffit at coil door till determined if heads are needed. Duncan and Ben/Jerrys walls walls and soffit approved to cover pending sprinkler inspection. RFI-91R3 wall approved to cover.

Framing Inspection Partial Pass 8/15/2017 08/18/2017
Corrections:


Miscellaneous/Other
Comment Only
08/18/2017
Sprinkler inspection approved, firestops completed and hole on floor patched in. Areas noted on inspection done on 8/17/17 are approved to be covered.

Framing Inspection Partial Pass 8/25/2017 (12:30 - 2:30) 8/25/2017 08/25/2017
Corrections:


Miscellaneous/Other
Comment Only
08/25/2017
Walls and ceilings in " Loose Moose" pending sprinkler inspection, ok to cover. MQ1 ceiling approved to cover pending sprinkler inspection. Facet wall at water park ok to cover.

Framing Inspection Passed w/ Conditions 9/8/2017 (12:30 - 2:30) 9/8/2017 09/08/2017
Above ceiling - Second floor tree house area, and south concession rooms, including walls and penetration check . Call for continued inspections as required.
Corrections:


Miscellaneous/Other
Comment Only
09/08/2017
Above ceiling - 2nd floor tree house and south concessions rooms, walls, and penetration check.

Framing Inspection Partial Pass 8/15/2017 (12:30 - 2:30) 09/11/2017
Corrections:


Miscellaneous/Other
Comment Only
08/15/2017
Wall in " Buckets" approved to close up pending picture of fire caulking at electrical through floor.2nd floor rope staging and bathrooms, rooms 225,259,261,263 ... approved to cover. Recheck areas that fire caulking was needed and framing was not approved.

Framing Inspection Partial Pass 9/14/2017 (12:30 - 2:30) 9/14/2017 09/14/2017
Corrections:


Miscellaneous/Other
Comment Only
09/14/2017
Stair 5 lath . Ropes platform soffit. Approved.

Framing Inspection Partial Pass 9/22/2017 (10:00 - 12:00) 9/22/2017 09/22/2017
Corrections:


Miscellaneous/Other
Comment Only
09/22/2017
Arcade ceiling framing approved to cover pending electrical and sprinkler inspections.

Framing Inspection Partial Pass 10/04/2017
Corrections:


Miscellaneous/Other
Comment Only
10/04/2017
Framing of walls at Paddle Bay Outfitter location approved.

Framing Inspection Partial Pass 10/18/2017 (12:30 - 2:30) 10/18/2017 10/18/2017
Corrections:


Miscellaneous/Other
Comment Only
10/18/2017
Above ceiling. Lower is all approved for padding out ceilings. 1st floor : Area”C” excluding Scoopes, above ceiling approved. 2nd floor above ceiling completed in areas that are being padded out, including bowling alley. Approved to pad out all areas listed.

Framing Inspection Passed 10/23/2017 (10:00 - 12:00) 10/23/2017 10/23/2017
Corrections:


Miscellaneous/Other
Comment Only
10/23/2017
Above ceiling in Scoops and Paddle Bay Outfitters approved to cover. Note: This is the of the framing and above ceiling inspections associated with this permit. The locker room inspections will follow the permit issued for the locker rooms.

Building Final Inspection Partial Pass 11/30/2017 (10:00 - 12:00) 11/30/2017 11/30/2017
Corrections:


Miscellaneous/Other
Outstanding
11/30/2017
Loose Moose: relocation 2nd exit sign to coincide with the exit door. Remove exit sign that leads to no where at outer wall of Hungry as a Wolf. Electrical finals needed with the 3rd part inspections. Fire to follow up with the shutters. Laundry iron-er to be 3rd part inspected. EH. To follow up with corrections and issues . Occupancy for opening is granted pending the follow up inspections for all above items by Dec. 15th of 2017 as per contractors timeline.

Building Final Inspection Passed 1/22/2018 01/22/2018
Corrections:


Outstanding
01/22/2018
This permit was finaled at the same time as the other permits for this project. all structural was completed