PRST201711433
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Footing Inspection | Partial Pass | 1/9/2018 (10:00 - 12:00) | 1/9/2018 | 01/09/2018 |
Corrections:
Strip footings and pad footings per approved drawings on clay soil-OK
Resolved
01/09/2018
Strip footings and pad footings per approved drawings on clay soil-OK
|
||||
Strip footings and pad footings per approved drawings on sandy soil-OK
Outstanding
01/09/2018
Strip footings and pad footings per approved drawings on sandy soil-OK
|
||||
Progress Inspection | Not Ready | 1/10/2018 (10:00 - 12:00) | 1/10/2018 | 01/10/2018 |
Corrections:
Miscellaneous/Other
Comment Only
01/10/2018
Footings at next section are still being formed and rebar is yet to be installed.
|
||||
Footing Inspection | Passed w/ Conditions | 1/11/2018 (10:00 - 12:00) | 1/11/2018 | 01/11/2018 |
Cover concrete complete with blankets to keep warm. | ||||
Corrections:
Miscellaneous/Other
Comment Only
01/11/2018
Footing and pier reinforcement - per plan, signatures 1-11-18 marked on city set. A. Special inspection on site - Terracon. B. Temperature = 11 degrees F. TIME 1:45 PM. GROUND HEATER with hose reels, on site with blankets.
|
||||
Progress Inspection | Not Ready | 1/12/2018 (10:00 - 12:00) | 01/12/2018 | |
Contractor, Larry, called to cancel today's inspection due to cold. jsmidt 01/12/2018 9:04 AM | ||||
Corrections:
Miscellaneous/Other
Comment Only
01/12/2018
Canceled due to weather
|
||||
Footing Inspection | Partial Pass | 1/19/2018 (10:00 - 12:00) | 1/19/2018 | 01/19/2018 |
Corrections:
Miscellaneous/Other
Comment Only
01/19/2018
Perimeter footings and pads at line C/B grid 12-18. Footingsand pads on grid 18. Footings on line KB , grid 13.5-18. Approved for concrete placement.
|
||||
Footing Inspection | Partial Pass | 1/26/2018 (10:00 - 12:00) | 1/26/2018 | 01/26/2018 |
Corrections:
Miscellaneous/Other
Comment Only
01/26/2018
Poured walls on line 7, grid U, line 1, grid C, grid A to line 8. All marked on plans in orange.
Approved for concrete.
|
||||
Footing Inspection | Partial Pass | 2/7/2018 (10:00 - 12:00) | 2/7/2018 | 02/07/2018 |
Corrections:
Miscellaneous/Other
Comment Only
02/07/2018
Footings at line 6.7 to line 13 at grids KB to N. Approved for concrete placement. 2 footing pads on lines 13 &14 grid C . Approved.
|
||||
Footing Inspection | Partial Pass | 2/8/2018 (10:00 - 12:00) | 2/8/2018 | 02/08/2018 |
Corrections:
Miscellaneous/Other
Comment Only
02/08/2018
Foundation walls around perimeter from line 5-18, line 18, and line KB. Foundation around pool also.
|
||||
Footing Inspection | Not Ready | 2/9/2018 (10:00 - 12:00) | 2/9/2018 | 02/09/2018 |
Corrections:
Miscellaneous/Other
Comment Only
02/09/2018
Last section of poured walls is not ready for inspection.
|
||||
Footing Inspection | Partial Pass | 5/2/2018 (10:00 - 12:00) | 02/12/2018 | |
Corrections:
Miscellaneous/Other
Comment Only
02/12/2018
Remaining foundation walls at building perimeter, lines 6.7-13 grid lines KB-N. Approved for concrete placement.
|
||||
Footing Inspection | Partial Pass | 2/14/2018 (10:00 - 12:00) | 2/14/2018 | 02/14/2018 |
Corrections:
Miscellaneous/Other
Comment Only
02/14/2018
Stoop footings approved for concrete.
|
||||
Progress Inspection | Partial Pass | 1/2/2018 (10:00 - 12:00) | 02/14/2018 | |
Canceled by contractor.NelsonThorpe Sarah 01/02/2018 8:13 AM | ||||
Corrections:
Miscellaneous/Other
Comment Only
02/14/2018
Water proofing at all of foundation approved, and foundation insulation on the west section of foundation approved , and ok to backfill. Remaining foundation insulation to be inspected.
|
||||
Progress Inspection | Partial Pass | 2/16/2018 (10:00 - 12:00) | 2/16/2018 | 02/16/2018 |
Corrections:
Miscellaneous/Other
Comment Only
02/16/2018
Foam insulation installed around all perimeter...approved for backfill.
|
||||
Footing Inspection | Partial Pass | 3/30/2018 (10:00 - 12:00) | 3/30/2018 | 03/30/2018 |
Corrections:
Miscellaneous/Other
Comment Only
03/30/2018
Interior spread footings from grid “U” to “M” .... rebar, hook bars and tie downs for shear walls all according to plans. F5 footing pad at grid “Ka”-2 and grid “D.5-3a . Approve for concrete placement.
|
||||
Progress Inspection | Partial Pass | 3/27/2018 (2:30 - 3:30) | 03/30/2018 | |
Larry canceled 3/27/18 inspection. Will re-schedule later. ajacobson 03/26/2018 1:12 PM | ||||
Corrections:
Miscellaneous/Other
Comment Only
03/30/2018
Waterproofing at elevator pit ... approved
|
||||
Footing Inspection | Partial Pass | 4/2/2018 (8:00 - 3:30) | 4/2/2018 | 04/02/2018 |
Corrections:
Miscellaneous/Other
Comment Only
04/02/2018
Piers at the 2 footing pads on grids, 3a-D/5, and Kc-2... approved. Elevator pad rebar mats and uprights at grids 6-H... approved.
|
||||
Progress Inspection | Partial Pass | 04/05/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
04/05/2018
Poured walls at elevator, rebar and clearances approved for concrete placement.
|
||||
Progress Inspection | Passed | 4/10/2018 (2:30 - 3:30) | 4/10/2018 | 04/10/2018 |
Corrections:
Miscellaneous/Other
Resolved
04/10/2018
Foundation; 1- frost footing pad, @ line14 at E line, with 30 x 36 pier reinforcement steel.
Slab on grade - Poly vapor barrier inspection for under interior concrete slab @ line U to M from line 1 to 7.
|
||||
Footing Inspection | Partial Pass | 4/20/2018 (12:30 - 2:30) | 4/20/2018 | 04/20/2018 |
Corrections:
Miscellaneous/Other
Comment Only
04/20/2018
Interior footings and pads at grid lines M toA from 1 to 9. Pads on 10, 11, 12.
First layer of gypsum on 1stair wall of south stair. Ok
|
||||
Miscellaneous/Other
Outstanding
04/20/2018
Tiedowns to be addressed with the engineer, they fall in between walls and cannot be connected . 2 tiedowns fall in tud pack of bearing, hey need to be addressed by the engineer and to come up with an alternate fix.
|
||||
Progress Inspection | Partial Pass | 4/24/2018 (2:30 - 3:30) | 4/24/2018 | 04/24/2018 |
Corrections:
Miscellaneous/Other
Comment Only
04/24/2018
Underslab poly at grids “M” to “A”, and “1” to “9”. Approved for concrete placement.
|
||||
Progress Inspection | Not Ready | 4/5/2018 (2:30 - 3:30) | 4/5/2018 | 04/24/2018 |
Rescheduled from 4/6 to 4/5. Moe Amanda 04/04/2018 2:38 PM | ||||
Footing Inspection | Partial Pass | 5/2/2018 (10:00 - 12:00) | 5/2/2018 | 05/02/2018 |
Corrections:
Miscellaneous/Other
Comment Only
05/02/2018
Interior footings from grids 13-18, and B-KB. Rebar in place ant tie downs ar in at the perimeter wall. Remaining tiedowns are onsite and being laid out for placement.
|
||||
Progress Inspection | Partial Pass | 5/8/2018 | 05/03/2018 | |
Viewed gypsum layering around elevator . Approved at 1st floor. | ||||
Corrections:
Miscellaneous/Other
Comment Only
05/03/2018
Viewed the gypsum layering (2 layers of outside covering at elevator shaft of 1st floor...Approved.
|
||||
Progress Inspection | Partial Pass | 5/8/2018 | 05/08/2018 | |
Corrections:
Miscellaneous/Other
Comment Only
05/08/2018
Last section of underslab poly... all that remains is a couple strips of poly to lay down at the edges and install of bulkhead a column bolts. What is in place is approved with contractor to complet remaining before concrete placement.
|
||||
Progress Inspection | Partial Pass | 05/17/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
05/17/2018
See “ image” & “ image 0 through image 4” for updated addendum to the foundation plan with the foundation anchoring rods that extend from in footing to roof. Plans addendum to be submitted to City of Bloomington Inspection Plan Review.
|
||||
Progress Inspection | Partial Pass | 05/17/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
05/17/2018
Elevator gypsum layers at outer shaft framing approved.
|
||||
Progress Inspection | Partial Pass | 06/07/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
06/07/2018
Exterior 1st layer of gypsum at elevator shafts on floors 2 & 3 approved with correction on 3rd level.
|
||||
Progress Inspection | Partial Pass | 06/08/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
06/08/2018
Front wall at elevator on 3rd floor, gypsum approved for 1st layer.
|
||||
Progress Inspection | Partial Pass | 06/14/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
06/14/2018
Progress of framing viewed, fire protection of steel in exterior walls and going through plans to familiarize For inspections.
|
||||
Progress Inspection | Partial Pass | 06/22/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
06/22/2018
First layer of gypsum at the outside of stairwell wall of 3rd floor east stair. Approved to install 2nd layer.
|
||||
Progress Inspection | Failed | 07/05/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
07/05/2018
4th floor west stair tower wall, 1st layer of gypsum is nailed to deep. Re-nail sheets and call for reinspection.
|
||||
Progress Inspection | Partial Pass | 07/06/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
07/06/2018
4th floor gypsum at stair wall and at elevator... 1st layer approved.
|
||||
Progress Inspection | Partial Pass | 07/12/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
07/12/2018
East 4th floor stair wall, 1st layer of gypsum approved at the inner building wall.
|
||||
Progress Inspection | Partial Pass | 07/23/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
07/23/2018
1st layer gypsum at elevator and both stair wall of 5th floor... approved. Ok to install second layer.
|
||||
Progress Inspection | Partial Pass | 07/26/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
07/26/2018
Meeting with contractor and the involved trades about the exterior weather barrier requirements for this building. The outcome is they will not use any spray applied weather barrier , but will use the 2 layers of Grade “D” paper as required per stucco code requirements. The window openings will be wrapped and terminate onto sheathing with Tyvek and pan flashed per code requirements, and the grade “D” paper will overlap the tyvek at the window openings and terminate to the window. This method is compliant to code. Foam product of R10 equivalency will be installed over the Grade”D” paper and the preparation for the stucco onto that. Contractor will integrate the drip flashing where needed at top of all windows and the sleeved openings.
A mock-up display will be made up and viewed by all involved for consistency, and to make sure all is correct before the actual work is done to the building.
|
||||
Progress Inspection | Partial Pass | 08/02/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
08/02/2018
Viewed and discussed window installation with the installation of stone veneer and stucco cladding. Flashing is an issue that needs to be addressed wher stone is installed at window area. Contractor will make sure that whatever method they decide to do is approved by mfg. and architect.
|
||||
Progress Inspection | Partial Pass | 08/13/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
08/13/2018
Progressive job, ongoing. Reviewing locations of building hold downs and completion of these installations. Some hold downs remain to be fully installed, will inspect all hold downs when fully completed.
|
||||
Progress Inspection | Partial Pass | 09/04/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
09/04/2018
Parapet framing at roof installed and fasten as per design. Approved.
|
||||
Progress Inspection | Partial Pass | 09/11/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
09/11/2018
Met with job superintendent to go over required inspections and progress of next phase of interior work.
Viewed rebar for the pool , it is installed as per plan detail.
Electrical has approved the pool for the electrical scope including grounding, approved to place shotcrete when scheduled.
|
||||
Footing Inspection | Partial Pass | 09/12/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
09/12/2018
4 pad footings on the south side of building for the front overhang. Footing rebar as per plan details. Approved to pour concrete.
|
||||
Progress Inspection | Partial Pass | 09/19/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
09/19/2018
Questions with required inspections and progress of exterior cladding being installed ont building. Progress of 2layers grade “D” 60 minute paper against partial north and partial west side of building, with 1 1/2” foam and latch detail per stucco code requirements.
|
||||
Building Final Inspection | Passed | 11/20/2018 | ||
Corrections:
Miscellaneous/Other
Comment Only
11/20/2018
structural work and footings completed for the building, see permit PRBD201706480 for all other building inspections.
|