PRWE201800530
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Well Inspection | Not Inspected | 1/16/2018 | 1/19/2018 (AM) | 01/16/2018 |
per CV via Braun, MW-2 location needs to be moved. too many utilites. Working with Bryan Gruidl in Engineering. dheile 01/29/2018 12:37 PM MW-2 installed on 1/25/2018 - not inspected. Not notified of new installation date. |