PRPL202300787
|
Plumbing
|
Other
|
Finaled
|
01/26/2023
|
|
:
Plumbing
:
RPZ rebuild using Zurn rebuild kit.(boiler)
|
PRPL202215303
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
12/15/2022
|
|
:
Plumbing
:
Demo Existing Floor Sink and Plumbing Piping. Add (1) floor drain and (1) Coffee maker line.
|
PREHP202215011
|
Environmental Health Plan
|
Alteration/Repair/Replace
|
Finaled
|
12/09/2022
|
|
:
Environmental Health Plan
:
Remodel of existing customer pantry/vending area.
|
PRFS202214417
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
11/17/2022
|
|
:
Fire Suppression System
:
The Hilton Garden on American Blvd is remodeling their shop area. Because of this, two sprinkler heads will no longer be up to code, and we are replacing them.
|
PREL202213960
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
11/08/2022
|
|
:
Electrical
:
Small interior remodel
|
PRPK202212342
|
Parking Lot
|
Other
|
Finaled
|
10/19/2022
|
|
:
Parking Lot
:
Sealcoat and re-stripe done Summer 2022.
Building Inspectors to verify ADA striping during inspections.
|
PRBD202212232
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
12/09/2022
|
|
:
Building
:
Interior remodel of hotel entryway / snack area.
|
PRROWU202203409
|
ROW Underground
|
N/A
|
Warranty
|
07/18/2023
|
|
:
Right-of-Way
:
Overpull approx. 347' of fiber in existing conduit from existing handhole and directional bore approx. 21' to existing handhole. Directional bore will be at min. depth of 36" Work will take place in City ROW.
|
PRFS202116341
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
12/15/2021
|
|
:
Fire Suppression System
:
Replace corroded sprinkler heads in pool area.
|
PRROWU202005492
|
ROW Underground
|
N/A
|
Finaled
|
07/02/2020
|
|
:
Right-of-Way
:
MCI Access Transmission Services Corp D/B/A/ Verizon Access Transmission is proposing to place a 2" fiber conduit within City ROW. Boring will be used to directional drill and place conduit. Four (4) new handholes will be constructed, entering an existing handhole in addition to fiber placement. The proposed conduit placement will be located on Bloomington Avenue S to American Boulevard E, proceeding on American Boulevard E to Portland Avenue S. under a sidewalk. Please see attached plans and TCP. The contractor to complete work will be MP NEXLEVEL, LLC.
|
PREL201904020
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/30/2019
|
|
:
Electrical
:
disconnected power to existing chiller
relocate feed and disconnect to new 400a 3ph 480v chiller
swap 2 pump motors and install control wiring for chiller
|
PRMH201902716
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
03/29/2019
|
|
:
Mechanical
:
Remove/replace air cooled chiller on roof.
Hilton Garden Inn
|