|
PREL202603116
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/30/2026
|
|
:
Electrical
:
RELOCATION OF ONE POWER PEDESTAL FOR RECONSTRUCTION OF DUGOUT - GENE KELLY PARK (BASEBALL FIELDS)
|
|
PRTC202505457
|
Tent/Canopy
|
Other
|
Finaled
|
05/28/2025
|
|
:
Tent/Canopy
:
Large tents at our soccer tournament mainly used for shelter/shade for attendees of the soccer tournament. We will have a number of tables and chairs set up underneath the tents.
|
|
PRPK202503404
|
Parking Lot
|
Other
|
Expired
|
08/04/2025
|
|
:
Parking Lot
:
Mill & overlay of Kelly Fields parking lots. Work will include upgrading pedestrian ramps to ADA compliance and spot curb & gutter repair. Will also include permanent pavement markings.
|
|
PRTC202405165
|
Tent/Canopy
|
Other
|
Finaled
|
05/10/2024
|
|
:
Tent/Canopy
:
Large tents for shelter for soccer tournament. These tents will mainly be used for
shelter/shade for attendees of our soccer tournament. We will have a number of tables and chairs set up
underneath these.
|
|
PRROWU202400453
|
ROW Underground
|
N/A
|
Permit(s) Issued
|
01/18/2024
|
|
:
Right-of-Way
:
1 new OLT cabinet and 1 new HandHole will be placed in the ROW of the city. This project also includes the path to provide power to the OLT. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. The OLT cabinet will be placed along E 104TH ST. The project associated with this permit is BLOOMINGTON - OLT 3 CABNET LOCATION
|
|
PRTC202303949
|
Tent/Canopy
|
Other
|
Finaled
|
05/26/2023
|
|
:
Tent/Canopy
:
Large tents for shelter for soccer tournament. These tents will mainly be used for shelter/shade for attendees of our soccer tournament. We will have a number of tables and chairs set up underneath these.
|
|
PRTC202203892
|
Tent/Canopy
|
Other
|
Expired
|
05/26/2022
|
|
:
Tent/Canopy
:
Large tents for shelter at our soccer tournament. These tents will mainly be used as shelter/shade for attendees of our soccer tournament. We will have a number of tables and chairs setup underneath these.
|
|
PRBD202104565
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
04/30/2021
|
|
:
Building
:
Replacing 9 windows, existing openings, with same size commercial grade windows. Replacing 4 exterior doors, existing openings, with same size commercial grade steel exterior doors.
|
|
PRPL202000271
|
Plumbing
|
Other
|
Expired
|
01/13/2020
|
|
:
Plumbing
:
New rainwater piping as noted on plans to accommodate re-roofing project.
|
|
PRCRF201915234
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
01/07/2020
|
|
:
Roofing
:
Commercial reroofing project in accordance with architectural plans and specifications. Per City of Bloomington advertisement for bids for Robinson Building Roof Replacement original bid due 10-30-19
|
|
PRPL201907660
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
07/10/2019
|
|
:
Plumbing
:
decommission an RPZ valve as follows:
Febco 825YRP, 2", serial #AD3458.
Located in outside pump box.
For the Irrigation System-Facilities.
Replaced with a new RPZ valve as follows:
Febco 825YRP, 2", serial #J043626.
same location. irrigation system
Test Report will be emailed to Julie in Utilities.
|
|
PRPL201906062
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
06/14/2019
|
|
:
Plumbing
:
Reconfigure exiting bathroom into ADA compliance. 1 Toilet, 1 LAV, 1 Floor Drain.
|
|
PREL201905714
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/03/2019
|
|
:
Electrical
:
Robinson Building Remodel - Misc. Electrical, add Outlets and Switches for new walls, separate lighting, furnace and air condition included.
|
|
PRBD201904721
|
Building
|
Alteration/Repair/Replace
|
Expired
|
06/18/2019
|
|
:
Building
:
Demo, sheetrock, doors, glass, polished concrete, ceramic, ceilings, paint, concrete, retaining wall, landscaping and rolling gate.
|
|
PRMH201904361
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
05/07/2019
|
|
:
Mechanical
:
Installation of (1) furnace and (1) ac, and assoc. ductwork, relocate (1) unit heater.
Electrical permit required.
|
|
PRTC201904052
|
Tent/Canopy
|
Other
|
Finaled
|
05/01/2019
|
|
:
Tent/Canopy
:
Bloomington United Mega Cup
|
|
PRTC201804062
|
Tent/Canopy
|
Other
|
Finaled
|
05/07/2018
|
|
:
Tent/Canopy
:
Bloomington United Mega Cup
|
|
PRTC201707111
|
Tent/Canopy
|
Other
|
Finaled
|
08/04/2017
|
|
:
Tent/Canopy
:
Midwest Shrine Association-Oasis Barbecue. 1 tent 60' x 100' in Hockey Rink.
|
|
PRTC201703590
|
Tent/Canopy
|
Other
|
Closed
|
05/26/2017
|
|
:
Tent/Canopy
:
Bloomington Youth Soccer club- Bloomington Mega Cup
1 tent 20 X 20 and 1 canopy 20 X 60.
|