PREL202511046
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
09/16/2025
|
|
:
Electrical
:
CHURCH PARKING LOT LIGHTING
|
|
PRDR202508392
|
Driveway
|
New Driveway
|
Finaled
|
07/22/2025
|
|
:
Driveway
:
McNamara Contracting, Inc. is removing and replacing the north driveway apron and adjacent sidewalk of St. Stephen's Lutheran Church.
|
|
PREL202503731
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/14/2025
|
|
:
Electrical
:
Disconnect/reconnect of new AC unit. Like for like swap.
|
|
PRMH202503680
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
04/21/2025
|
|
:
Mechanical
:
Direct replacement of two furnace/condenser systems. Electrical permit required.
One system is high-efficient 96%, 100mbH, single stage condensing furnace w/ ECM motor and matching 13.4SEER2 rated condenser
Second system is high-efficient 96%, 40mbH, 2-stage condensing furnace w/ECM motor and matching 13.4SEER2 condenser.
Includes new evaporator coils with TXVs
|
|
PRPK202501586
|
Parking Lot
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
06/13/2025
|
|
:
Parking Lot
:
Full resurfacing of main and north parking lots. Including remove and replacement of parking lot lighting. Voluntary installation of vegation parking lot islands with rainwater management features.
|
|
PREL202416062
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
12/11/2024
|
|
:
Electrical
:
wire new entry lighting
|
|
PRBD202411812
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
10/07/2024
|
|
:
Building
:
We will be building a canopy entrance system for St. Stephen Lutheran Church. New concrete, remove and reinstall handrail system, glulam columns with standing seem roofing.
|
|
PRCRF202404889
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Expired
|
04/23/2024
|
|
:
Roofing
:
Removal of old EPDM 60mil roof membrane and installation of new 60mil EPDM membrane.
|
|
PREL202403448
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/09/2024
|
|
:
Electrical
:
flat roof ballast solar install on the building.
|
|
PRBD202403445
|
Building
|
Other
|
Expired
|
04/09/2024
|
|
:
Building
:
Flat roof ballast solar install on the building.
|
|
PRROWU202314857
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along W 84th St, Nine Mile Creek PWKY, Nine Mile Creek CIR. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried R
|
|
PRROWU202314855
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along Poplar Bridge Curve, Poplar Bridge Rd, W 86th St, and W 84th St. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried Q
|
|
PRROWU202314854
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along poplar Bridge Rd, W 88th St, and Poplar Bridge Curve. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried P
|
|
PRROWU202314852
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along Poplar Bridge Curve, Morris Rd, and W 89th St. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried O
|
|
PRROWU202314851
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along Morris Ave, Morris Cir, Kell Ave S, and Poplar Bridge Curve. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried N
|
|
PRROWU202314849
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along Morris Ave, Little Rd, Poplar Bridge Rd, and W 85th St. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried M
|
|
PRROWU202314848
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along Harrison Rd, Harris CIR, and Morris Ave. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried L
|
|
PRROWU202314846
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along Poplar Bridge Rd and Harrison Rd. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried K
|
|
PRROWU202314843
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along Irwin Rd, Kell Ave S, and Poplar Bridge Rd. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried J
|
|
PRROWU202314841
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along W 84th St, Irwin Rd, and Kell Ave S. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried I
|
|
PRROWU202314837
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along W 82nd St. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried H
|
|
PRROWU202314836
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along W 82nd St and W 84th St. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried G
|
|
PRROWU202314835
|
ROW Underground
|
N/A
|
Warranty
|
01/02/2024
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along W 84th St, Johnson Ave S, W 82nd St, and Johnson Cir. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried F
|
|
PRROWU202314834
|
ROW Underground
|
N/A
|
Warranty
|
12/14/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along W 84th St and Johnson Ave S. The project associated with this permit is North-OLT001 DA109 - REVISED City Buried E
|
|
PRROWU202312481
|
ROW Underground
|
N/A
|
Warranty
|
02/27/2024
|
|
:
Right-of-Way
:
Underground installation of fiber optic cable in duct by directional bore & pulling of fiber optic cable in existing duct
|
|
PRROWA202309667
|
ROW Aerials
|
N/A
|
Warranty
|
08/28/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed along existing utility poles. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. The project associated with this permit is North: DA 2 - City Aerial D
|
|
PRROWA202309666
|
ROW Aerials
|
N/A
|
Warranty
|
08/28/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed along existing utility poles. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. The project associated with this permit is North: DA 2 - City Aerial C
|
|
PRROWA202309664
|
ROW Aerials
|
N/A
|
Warranty
|
08/28/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed along existing utility poles. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. The project associated with this permit is North: DA 2 - City Aerial B
|
|
PRROWA202309663
|
ROW Aerials
|
N/A
|
Warranty
|
08/28/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed along existing utility poles. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. The project associated with this permit is North: DA 2 - City Aerial A
|
|
PRROWU202309662
|
ROW Underground
|
N/A
|
Warranty
|
08/28/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. The project associated with this permit is NORTH: DA 2 - City Buried
|
|
PRCRF202202374
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Expired
|
04/14/2022
|
|
:
Roofing
:
Remove and replace ballast rock and EPDM membrane. Leave existing insulation and add 1" ISO board.
|
|
PRCRF202104039
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Expired
|
04/26/2021
|
|
:
Roofing
:
Remove and replace of ballast roof rock and membrane. Leave existing insulation and add a layer of 1" ISO board
|
|
PRROWU202007758
|
ROW Underground
|
N/A
|
Finaled
|
08/20/2020
|
|
:
Right-of-Way
:
FROM MH 102 BORE AND PLACE 1.25"ID AND 24 FIBER WEST 345' TO CUSTOMERS NORTH PROPERTY LINE.PROPOSED ROUTE 43' FROM CL
|
|
PRCRF201813496
|
Roof, Commercial
|
Repair/Replace
|
Expired
|
10/30/2018
|
|
:
Roofing
:
Remove the existing ballasted EPDM Roof system. Add (1) layer of polyisocyanurate to the existing - Install new EPDM and ballast - 20 year Firestone Red Shield Warranty.
|
|
PRCRF201710504
|
Roof, Commercial
|
Repair/Replace
|
Permit(s) Issued
|
11/02/2017
|
|
:
Roofing
:
Remove the existing ballasted EPDM Roof system. Add (1) layer of polyisocyanurate to the existing - Install new EPDM and ballast - 20 year Firestone Red Shield Warranty.
|