PRFS201907818
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
07/15/2019
|
|
:
Fire Suppression System
:
Move 2 existing pendent sprinkler heads.
|
PRBD201907270
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
07/15/2019
|
|
:
Building
:
Interior tenant buildout, 1 new office to be created, New finishes
|
PREL201906644
|
Electrical
|
Other
|
Finaled
|
06/20/2019
|
|
:
Electrical
:
Office Remodel
FVB Energy
|
PRFS201906607
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
01/31/2022
|
|
:
Fire Suppression System
:
Move existing pendent heads as needed for new wall loctions.
FVB Energy
|
PRPL201803811
|
Plumbing
|
Repair/Replace
|
Closed
|
04/27/2018
|
|
:
Plumbing
:
Master plumber will do installation of a water filtration unit. Health Counseling Services
|
PREL201803520
|
Electrical
|
Repair/Replace
|
Finaled
|
04/24/2018
|
|
:
Electrical
:
Wiring for 3 single pole dimmer switches
|
PRMH201802950
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
04/09/2018
|
|
:
Mechanical
:
Relocate existing diffusers. Four.
|
PRFS201802700
|
Fire Suppression System
|
Other
|
Finaled
|
04/04/2018
|
|
:
Fire Suppression System
:
Add 2 semi-recessed pendant sprinkler heads and relcoate 4 existing heads.
|
PREL201802287
|
Electrical
|
Alteration/Remodel
|
Finaled
|
03/21/2018
|
|
:
Electrical
:
PO35421 Relocate 12 fixtures, furnish and install 2 exit/emergency signs/lights, 4 switches, 15 receptacles, 7 phone/data openings, wire insty hot water heater, disconnect wiring for construction.
|
PRPL201802155
|
Plumbing
|
Alteration/Remodel
|
Finaled
|
03/19/2018
|
|
:
Plumbing
:
Roughin and install (1) break room sink, (1) point of use electric water heater, water line to coffee maker. No gas work.
|
PRBD201802048
|
Building
|
Alteration/Remodel
|
Finaled
|
04/02/2018
|
|
:
Building
:
Tenant improvement.
|
PRDE201712070
|
Demolition
|
Alteration/Remodel
|
Finaled
|
12/20/2017
|
|
:
Demolition
:
Interior demo only (non-structured) existing tenant space.
|
PREL201712053
|
Electrical
|
Alteration/Remodel
|
Finaled
|
12/21/2017
|
|
:
Electrical
:
PO 35289 Furnish and install 12 receptacle and 15 phone/data openings. Disconnect wiring for construction.
|
PREL201711726
|
Electrical
|
Repair/Replace
|
Finaled
|
12/11/2017
|
|
:
Electrical
:
Electrical demo for wall removal. Ste 215.
|
PRPL201711415
|
Plumbing
|
Repair/Replace
|
Finaled
|
11/29/2017
|
|
:
Plumbing
:
Breakroom sink & dishwasher in existing location.-No plans.
|
PRBD201711239
|
Building
|
Alteration/Remodel
|
Finaled
|
12/11/2017
|
|
:
Building
:
Remodel
|
PREL201710935
|
Electrical
|
Alteration/Remodel
|
Finaled
|
11/13/2017
|
|
:
Electrical
:
Electrical for tenant improvement.
|
PRBD201710513
|
Building
|
Alteration/Remodel
|
Finaled
|
12/05/2017
|
|
:
Building
:
Tenant Improvements
|
PRPL201707950
|
Plumbing
|
Repair/Replace
|
Finaled
|
08/28/2017
|
|
:
Plumbing
:
New breakroom sink on existing location.
|
PRMH201707836
|
Mechanical/HVAC
|
Alteration/Remodel
|
Finaled
|
08/24/2017
|
|
:
Mechanical
:
Add (2) exhaust registers in new restrooms. Connect to existing duct system.
|
PRPL201707401
|
Plumbing
|
Repair/Replace
|
Finaled
|
08/14/2017
|
|
:
Plumbing
:
New breakroom sink on existing location
|
PRFS201706653
|
Fire Suppression System
|
Other
|
Finaled
|
07/26/2017
|
|
:
Fire Suppression System
:
Add 6 pendent heads and move 4 existing pendent heads.
|
PREL201706608
|
Electrical
|
Repair/Replace
|
Finaled
|
07/26/2017
|
|
:
Electrical
:
Replace lights with LED lighting compliance to follow. Waiting on approved fixtures.
|
PRBD201706452
|
Building
|
Alteration/Remodel
|
Finaled
|
07/24/2017
|
|
:
Building
:
Remodel to remove one office and install new sink in existing breakroom. ( Spec Suite)
|
PRPL201706323
|
Plumbing
|
Alteration/Remodel
|
Finaled
|
07/24/2017
|
|
:
Plumbing
:
Add a 1/2 bath to suite.
|
PREL201706303
|
Electrical
|
Alteration/Remodel
|
Finaled
|
07/18/2017
|
|
:
Electrical
:
Tenant build-out, relocate existing lighting, general receptacles and furniture connectors. Reliable Drug, suite 115.
|
PRBD201706129
|
Building
|
Alteration/Remodel
|
Finaled
|
07/26/2017
|
|
:
Building
:
Tenant improvements for Reliable Drug, suite 115. 1452 sq ft.
|