PRPK202514413
|
Parking Lot
|
Other
|
Finaled
|
11/13/2025
|
|
:
Parking Lot
:
Parking lot restriping of 2 areas.
|
|
PRBD202514388
|
Building
|
Other
|
Permit(s) Issued
|
11/24/2025
|
|
:
Building
:
Building permit for occupancy due to change of use.
|
|
PREL202415985
|
Electrical
|
Other
|
Expired
|
12/12/2024
|
|
:
Electrical
:
installing new sprinkler monitoring system
|
|
PRAL202415984
|
Fire Alarm
|
Other
|
Finaled
|
12/12/2024
|
|
:
Fire Alarm
:
Scope of Work:
Provide one 120V supply side surge protector for the customer's electrician to install
Design/Submittals - Fire Alarm Permit
Submit Electrical Permit - Bloomington
Install New DMP Fire Panel Next to New Riser
Install LTE Cellular to Fire Panel
Install Back Up Batteries
Install Conduit from Fire Panel up wall for Smoke Detector Wiring
Pull Wire from Panel to Smoke Detector Location
Install Smoke Detector on Wall above Fire Panel-Fire Code
Install Pull Station next to Fire Panel-Fire Code
Install Metal Document Box next to Fire Panel-Fire Code
Install (2) Flex Conduit from Fire Panel to Sprinkle System Gate Values
Install Flex Conduit from Fire Panel to Flow Switch
Program Devices to New Panel
Perform Test & Verify All Zones
Verify Communication with Central Monitoring Station
Import Fire Panel Zones at Central Monitoring Station
Train Key Personal on New Fire Panel
|
|
PREL202415284
|
Electrical
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Electrical
:
install electrical for new fire sprinkler system
|
|
PRUT202413035
|
Utility
|
Alteration/Repair/Replace
|
Finaled
|
10/03/2024
|
|
:
Utility
:
1” Meter/Radio $634
|
|
PRFS202413002
|
Fire Suppression System
|
Other
|
Expired
|
10/15/2024
|
|
:
Fire Suppression System
:
Install wet automatic fire sprinkler system
|
|
PRPL202412974
|
Plumbing
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Plumbing
:
Installing new meter from new 8 inch water main and run 40 feet of 1 inch waterline to existing mech room.
|
|
PRUT202412830
|
Utility
|
Alteration/Repair/Replace
|
Finaled
|
10/02/2024
|
|
:
Utility
:
• 5/8X3/4 Fire Meter w/radio read (#44217908) $361
• 8X8 Tee (Other Charges) $940
|
|
PREL202412085
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/16/2024
|
|
:
Electrical
:
remove and replace warehouse lighting
|
|
PRUT202411957
|
Utility
|
Alteration/Repair/Replace
|
Finaled
|
09/16/2024
|
|
:
Utility
:
Excavate and install (1) 8" waterline from stub in the grass to a point "just" inside the building. Existing domestic will be capped in the green area. City will cutoff at main in future.
|
|
PREL202008794
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/11/2020
|
|
:
Electrical
:
Wire rooftop ac
|
|
PRMH202008753
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
08/28/2020
|
|
:
Mechanical
:
Replacing existing RTU with new Lennox RTU of same size and efficiency.
|
|
PRMH201906619
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
06/21/2019
|
|
:
Mechanical
:
Replace existing a/c condenser, coil and lineset..(Paper app)
|
|
PREL201814614
|
Electrical
|
Repair/Replace
|
Finaled
|
11/30/2018
|
|
:
Electrical
:
Office Remodel and warehouse lighting.
|
|
PRMH201813072
|
Mechanical/HVAC
|
Alteration/Remodel
|
Finaled
|
11/26/2018
|
|
:
Mechanical
:
Moving heat runs and returns in warehouse and office. Adding a PRV with dampers as part of a CO and NO2 monitoring system.
|
|
PRPL201813071
|
Plumbing
|
Alteration/Remodel
|
Finaled
|
11/26/2018
|
|
:
Plumbing
:
Demo of two bathrooms to update to ADA compliance. Install new shower stall in break room area.
|
|
PRBD201812454
|
Building
|
Alteration/Remodel
|
Finaled
|
11/26/2018
|
|
:
Building
:
Interior remodeling of office and warehouse space
|
|
PRBD201812448
|
Building
|
Alteration/Remodel
|
Finaled
|
10/23/2018
|
|
:
Building
:
Replacing garage doors (bigger doors) and adding a ramp for trucks.
|