PREL202500311
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/13/2025
|
|
:
Electrical
:
Fire Alarm wiring for Activision at West Bloomington Technology Park III 13240
|
|
PRAL202500309
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
01/22/2025
|
|
:
Fire Alarm
:
Adding strobes to remodel area at West Bloomington Technology Park III 13240
|
|
PRFS202416204
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
12/19/2024
|
|
:
Fire Suppression System
:
ADD/RELOCATE CONCEALED PENDENT SPRINKLERS AS NEEDED FOR NEW RESTROOMS.
|
|
PREL202415912
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/10/2024
|
|
:
Electrical
:
Tenant Improvements to Activision
|
|
PRPL202415699
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
12/03/2024
|
|
:
Plumbing
:
Plumbing for remodel of restrooms
|
|
PRROWU202415006
|
ROW Underground
|
N/A
|
Warranty
|
12/10/2024
|
|
:
Right-of-Way
:
Tie into existing HH. Directional bore (2) 1.25" conduits with (1) 72CT fiber optic cable at 36" depth. Install new HH. Overpull 72CT fiber in existing 4" conduit to building. Restore work area to original condition. Please see prints for further details.
|
|
PRBD202414065
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
11/27/2024
|
|
:
Building
:
Tenant remodel of existing office building. Total building is 49,714 sf, project area includes remodeling approx. 576 sf at restrooms to add unisex restrooms and wellness rooms.
Existing building, including business occupancy use, all egress paths, and exists are not a part of this project.
|
|
PREL202413940
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/23/2024
|
|
:
Electrical
:
Phase 1-disconnect and reconnect cubicles, (2) dedicated circuits for vending machines, (10) 20amp circuits for furniture,(8) 30amp circuits for MDF, (8) 30amp circuits for IDF, (1) wiring of 50amp move in cooling unit
|
|
PREL202012570
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/16/2020
|
|
:
Electrical
:
Roof top unit 11 changeout
|
|
PRMH202012130
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Mechanical
:
Changing out a 25 Ton RTU. Electrical permit required.
|
|
PRMH201914712
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
12/10/2019
|
|
:
Mechanical
:
Add one exhaust register to existing system.
|
|
PRPL201914046
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
11/19/2019
|
|
:
Plumbing
:
ROUGH IN AND INSTALL 1-TOILET AND 1-LAV
|
|
PRBD201913638
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
11/20/2019
|
|
:
Building
:
Add ADA/unisex restroom in existing tenant space
|
|
PRFS201913587
|
Fire Suppression System
|
Other
|
Finaled
|
|
|
:
Fire Suppression System
:
Remove (1) existing sheet metal heat collector in the Pearson electrical room per Fire Marshall directive.
|
|
PRPL201901679
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
02/28/2019
|
|
:
Plumbing
:
RPZ Rebuild
|
|
PREHP201704052
|
Environmental Health Plan
|
New
|
Finaled
|
04/29/2019
|
|
:
Environmental Health Plan
:
Micro Market in breakroom.
(Did not convert to micro market in 2017. Was a vending machine area and had vending licenses. Breakroom area has now been converted to micro market.) kolson 06/14/2018 3:03 PM
|
|
PRAL201703851
|
Fire Alarm
|
Other
|
Finaled
|
05/22/2017
|
|
:
Fire Alarm
:
Remodel fire alarm system
|
|
PREL201703850
|
Electrical
|
Repair/Replace
|
Permit(s) Issued
|
05/22/2017
|
|
:
Electrical
:
Remodel fire alarm system
|
|
PRBD201701919
|
Building
|
Alteration/Remodel
|
Finaled
|
03/31/2017
|
|
:
Building
:
Interior remodel to include locker rooms, restrooms, breakroom, excercise room and office space expansion.
|