PREL202215654
|
Electrical
|
Other
|
Finaled
|
12/28/2022
|
|
:
Electrical
:
Remodel
|
PREL202200173
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/10/2022
|
|
:
Electrical
:
Remodel of tenant reception Area & Conference Room
|
PRBD202116308
|
Building
|
Alteration/Repair/Replace
|
Expired
|
01/13/2022
|
|
:
Building
:
Tenant Improvement
|
PRFS202003903
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
05/18/2020
|
|
:
Fire Suppression System
:
Relocate or add sprinklers as needed for tenant remodel off existing system. Any added heads to match existing. No change in density.
|
PRPL202003651
|
Plumbing
|
Alteration/Repair/Replace
|
Expired
|
04/21/2020
|
|
:
Plumbing
:
Rough in and install 1 Sink, 1 dishwasher, 1 6 gallon water heater and 1 stand pipe.
Harmon
|
PREL202003638
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
05/19/2020
|
|
:
Electrical
:
PO 36597 FURNISH & INSTALL 275 FIXTURES, 19 EXIT/EMERGENCY SIGNS/LIGHTS, 64 OCCUPANCY SENSORS, 4 SWITCHES, 170 RECEPTACLES, 9 TV OPENINGS, 64 PHONE/DATA OPENINGS, 62' WIREMOLD, WIRE 1 DISHWASHER, 1 FURNITURE BASE FEED, 2 FLUSH FLOOR FURNITURE BASE FEEDS, 1 ELECTRIC WATER HEATER, POWER 5 CARD READERS, DISCONNECT WIRING FOR CONSTRUCTION.
|
PRROWU202003537
|
ROW Underground
|
N/A
|
Finaled
|
07/14/2020
|
|
:
Right-of-Way
:
Four 4'x4' bore pits and a 185' bore needed to place a new 2" pipe from a new transformer box to our existing telecommunications cabinets at Know Ave S and W 81st Street.
This works is needed due to Xcel relocating their transformer box.
|
PRBD202001397
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
03/03/2020
|
|
:
Building
:
Tenant improvement of an existing suite at Southpoint office center
|
PRDE201914304
|
Demolition
|
Alteration/Repair/Replace
|
Finaled
|
11/25/2019
|
|
:
Demolition
:
Demo for an office remodel.
|
PREL201814946
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/06/2018
|
|
:
Electrical
:
Electrical demo for tenant remodel, install 36 new light fixtures, 2 new receptacles (duplex).
|
PRBD201814154
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
12/06/2018
|
|
:
Building
:
Tenant Interior Remodel
|
PRDE201813799
|
Demolition
|
Alteration/Remodel
|
Finaled
|
11/02/2018
|
|
:
Demolition
:
Interior commercial demo
|
PRBD201801022
|
Building
|
Alteration/Remodel
|
Finaled
|
02/05/2018
|
|
:
Building
:
Tenant remodel to prepare for leasing.
|
PRBD201705829
|
Building
|
Alteration/Remodel
|
Finaled
|
07/07/2017
|
|
:
Building
:
Replacement sliding door leafs. Cushman, suite 1500.
|
PRBD201705510
|
Building
|
Alteration/Remodel
|
Finaled
|
07/10/2017
|
|
:
Building
:
Tenant improvement for UBB, suite 1500.
|
PRBD201703530
|
Building
|
Alteration/Remodel
|
Finaled
|
06/07/2017
|
|
:
Building
:
Tenant improvement for suite 825 - office approximately 2069 sq ft.
|
PRPL201701636
|
Plumbing
|
Repair/Replace
|
Finaled
|
03/28/2017
|
|
:
Plumbing
:
Install plumbing for a breakroom sink
|
PRFS201701545
|
Fire Suppression System
|
Repair/Replace
|
Finaled
|
03/27/2017
|
|
:
Fire Suppression System
:
Move 4 existing heads.
|
PRMH201701487
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
03/17/2017
|
|
:
Mechanical
:
Relocate 2 existing diffusers for new office layout. Reconnect existing vav to high pressure duct. Cap and remove 1 diffuser.
|
PREL201701332
|
Electrical
|
Alteration/Remodel
|
Finaled
|
03/14/2017
|
|
:
Electrical
:
Disconnect wiring for construction. Relocate 11 fixtures, furnish and install 7 switches, 12 receptacles, 4 phone/data openings, recircuit and relamp lights as required. Misc. wiring as needed.
|
PREL201700803
|
Electrical
|
Repair/Replace
|
Finaled
|
02/23/2017
|
|
:
Electrical
:
P.O. 34827, Furnish and install 3 fixtures, 2 recessed cans, 1 switch, 8 receptacles, 2 TV openings, 5 phone/data openings, disconnect wiring for construction. Relocated 1 exit/emergency sign/light. other miscellaneous wiring as needed.
|
PRBD201700581
|
Building
|
Alteration/Remodel
|
Finaled
|
03/17/2017
|
|
:
Building
:
Tenant Improvement, Office.
|
PRMH201700399
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
02/09/2017
|
|
:
Mechanical
:
Relocate 2 diffusers in Conference Room for new ceiling light lay out.
|