PRDR202502023
|
Driveway
|
Other
|
Finaled
|
02/28/2025
|
|
:
Driveway
:
Bring exiting driveway on the north side of 8200 Grand Ave South back to grade. There is currently a 22 inch swail that was cut in years ago to create a low loading dock.
|
|
PRFS202002736
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
03/23/2020
|
|
:
Fire Suppression System
:
Add 2 new sprinklers under the 2 Overhead doors.
raise 1 branch line into the bar joists
|
|
PREL201909312
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
08/16/2019
|
|
:
Electrical
:
Install lights, dryer rec and power.
|
|
PRFS201909265
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Closed
|
08/19/2019
|
|
:
Fire Suppression System
:
Remodel. Adding 12 heads.
|
|
PRMH201908379
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
07/25/2019
|
|
:
Mechanical
:
Demo duct and move diffuser - 4 in total.
|
|
PREL201907964
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
07/17/2019
|
|
:
Electrical
:
Wire 3 new offices. Add new receptacles, lights in offices and warehouse.
|
|
PRPL201907369
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
07/08/2019
|
|
:
Plumbing
:
Installing 2 laundry sinks
|
|
PRBD201905469
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
06/27/2019
|
|
:
Building
:
1) Demo interior walls and remove false ceiling
2) Cut two openings into the south side wall for two 12 wide x 10 ft high garage doors. Install I-beams as per engineering drawing.
|
|
PRPK201903699
|
Parking Lot
|
Alteration/Repair/Replace
|
Finaled
|
09/23/2019
|
|
:
Parking Lot
:
Remove 5 parking spots that abut the south side of the building. Add 6 parking spots by extending the 2nd/3rd row parking on the south side to the curb on the west.
|
|
PREL201903629
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
04/22/2019
|
|
:
Electrical
:
Add receptacles and lights in storage/warehouse area.
|
|
PREL201903213
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/11/2019
|
|
:
Electrical
:
Radon: 5HP South Motor: Install 10-3 mc AP (200ft) between main panel and j box ( underneath unit at penetration), install 3-20amp fuses in main panel (FRN time delay cartridge fuses), transition to 3/4" metallic liquidtite (between j box and non fused disconnect), set 30amp 300v rated non fused disconnect (on equipment), wire motor, and set 120v near disconnect.
Radon: 3HP North Motor: Install 12-3 mc AP (60ft) between main panel and j box ( underneath unit at penetration), install 3-15amp fuses in main panel (FRN time delay cartridge fuses), transition to 3/4" metallic liquidtite (between j box and non fused disconnect), set 30amp 300v rated non fused disconnect (on equipment), wire motor, and set 120v near disconnect.
|
|
PRBD201902595
|
Building
|
Alteration/Repair/Replace
|
Closed
|
04/03/2019
|
|
:
Building
:
Sheet rock interior suite to create warehouse space for storage for existing tenant.
|
|
PRWE201813344
|
Well
|
Other
|
Finaled
|
10/24/2018
|
|
:
Well
:
Temporary well sealing
|