PRUT202305114
|
Utility
|
Alteration/Repair/Replace
|
Finaled
|
05/22/2023
|
|
:
Utility
:
first 20' out of building to be dug up regrade to remove belly and replaced with new PVC.
|
PRROWU202211834
|
ROW Underground
|
N/A
|
Finaled
|
11/04/2022
|
|
:
Right-of-Way
:
Construction of fiber via pull in existing duct
|
PREL202013162
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/28/2020
|
|
:
Electrical
:
SIGN LIGHTING FOR "MY CREDIT UNION"
|
PRPS202011138
|
Sign, Permanent
|
Replacement Sign
|
Finaled
|
10/28/2020
|
|
:
Sign
:
install state wall sign and directional signs
|
PREL201915111
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/27/2019
|
|
:
Electrical
:
JOB 134915 DISCONNECT / RECONNECT MESSAGE BOARDS ON SIGNS
|
PRPS201913369
|
Sign, Permanent
|
Replacement Sign
|
Finaled
|
12/19/2019
|
|
:
Sign
:
REMOVE EXISTING CABINET BRING BACK TO SHOP REWORK CABINET ADD (1) NEW 3'11"X
7'3" SQUARE TUBE CABINET WITH A 3'8"X 6'9" D/F 16MM COLOR WATCHFIRE DISPLAY,
FILLER PANEL ON BOTTOM, REPAINT CABINET AND POLE COVER. CUT BOTTOM CABINET DOWN
TO THREE NON LIT TENANT SLOTS.
|
PRMH201913248
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Mechanical
:
Gas Piping to RTU
|
PREL201911042
|
Electrical
|
Other
|
Finaled
|
09/20/2019
|
|
:
Electrical
:
TEMPERATURE CONTROL
|
PREL201909965
|
Electrical
|
Other
|
Finaled
|
09/24/2019
|
|
:
Electrical
:
Installation of a surge protector.
|
PRMH201909635
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
09/03/2019
|
|
:
Mechanical
:
1 RTU, VAV Boxes, Ductwork, 3 PRV's, 2 Ductless AC's
|
PRAL201908467
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
08/07/2019
|
|
:
Fire Alarm
:
Adding to existing Fire Alarm system
|
PRFS201907849
|
Fire Suppression System
|
Other
|
Finaled
|
07/24/2019
|
|
:
Fire Suppression System
:
Sprinkle new addition off of existing wet system
|
PREL201906807
|
Electrical
|
Other
|
Finaled
|
07/26/2019
|
|
:
Electrical
:
2-Story Addition at RBCU Bank
|
PRUT201905023
|
Utility
|
Alteration/Repair/Replace
|
Finaled
|
05/21/2019
|
|
:
Utility
:
Storm sewer changes
|
PRPL201904455
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
06/13/2019
|
|
:
Plumbing
:
Adding (2) new bathrooms in existing building per plan. Adding (2) new bathrooms in new addition.
|
PRFD201815193
|
Foundation
|
Other
|
Expired
|
01/18/2019
|
|
:
Foundation
:
Footing and foundation work for an addition onto the existing Richfield Bloomington Credit Union on Lyndale Avenue.
|
PRBD201815079
|
Building
|
Addition
|
Finaled
|
05/16/2019
|
|
:
Building
:
Two story building addition onto the Richfield Bloomington Credit Union (RBCU) and remodel of existing space.
|
PREL201802427
|
Electrical
|
Repair/Replace
|
Finaled
|
03/27/2018
|
|
:
Electrical
:
Disconnect (5) thermostats; set up (3) contactors (24 VAC coil); and install pipe & wires from breaker to contactor then back to the heater circuit.
|