PRROWU202511107
|
ROW Underground
|
N/A
|
Ready for Issuance
|
|
|
:
Right-of-Way
:
Directionally drill for 30' from existing vault to Pole #1. Install (2) 2" conduit. Delash/Relash 4,498' of fiber from Pole #1 to pole #25. Pull 1,051' of fiber through existing conduit. Delash/Relash 7,222' of fiber from Pole #26 to Pole #68.
|
|
PRCRF202508782
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
07/31/2025
|
|
:
Roofing
:
WORK TO BE PERFORMED: Reroof section G with 60-mil ballasted EPDM.
Contractor will supply labor and material to re-roof section G (divided up into 4 smaller sections for your reference) as shown on the attached aerial, approximately 1,200 square feet of roof surface.
|
|
PRMH202500974
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
01/31/2025
|
|
:
Mechanical
:
FURNISH AND INSTALL (1) CONDENSING UNIT AND (1) EVAPORATOR FOR WALK IN FREEZER.
|
|
PREL202416694
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
01/02/2025
|
|
:
Electrical
:
Egan Job 437778 - Demo old MC controllers - install new controllers
|
|
PREL202416693
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
01/02/2025
|
|
:
Electrical
:
Egan Job 437777 - Demo old MC controllers & install new controllers
|
|
PREL202403904
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
04/03/2024
|
|
:
Electrical
:
Egan Job 437053 - GX Upgrade - Engineering Office
|
|
PREL202403903
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
04/03/2024
|
|
:
Electrical
:
Egan Job 437051 - Upgrade Boiler Room Controller
|
|
PREL202403902
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
04/03/2024
|
|
:
Electrical
:
Egan Job 437049 - Penthouse conversion MC1 controller
|
|
PRCRF202402658
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
03/07/2024
|
|
:
Roofing
:
Sections: A flat re-roof 60mil EPDM membrane change-out re-use ballast.
|
|
PRROWU202401108
|
ROW Underground
|
N/A
|
Warranty
|
02/12/2024
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along Poplar Bridge Rd. The project associated with this permit is BACKBONE OLT-6 to OLT-1 Permit E
|
|
PRROWU202401107
|
ROW Underground
|
N/A
|
Warranty
|
02/12/2024
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along Poplar Bridge Rd. The project associated with this permit is BACKBONE OLT-6 to OLT-1 Permit D
|
|
PRROWU202401106
|
ROW Underground
|
N/A
|
Warranty
|
02/08/2024
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along W 90th ST. The project associated with this permit is BACKBONE OLT-6 to OLT-1 Permit C
|
|
PRROWU202401103
|
ROW Underground
|
N/A
|
Warranty
|
02/07/2024
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along W 84th ST. The project associated with this permit is BACKBONE OLT-6 to OLT-1 Permit B
|
|
PRROWU202401102
|
ROW Underground
|
N/A
|
Warranty
|
03/11/2024
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along W 84th ST. The project associated with this permit is BACKBONE OLT-6 to OLT-1 Permit A
|
|
PRROWU202314214
|
ROW Underground
|
N/A
|
Warranty
|
01/02/2024
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. The project associated with this permit is North OLT001 DA103 - REVISED City Buried D
|
|
PRROWU202313763
|
ROW Underground
|
N/A
|
Warranty
|
11/16/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. The project associated with this permit is North OLT001 DA104 - REVISED City Buried D
|
|
PRROWU202313760
|
ROW Underground
|
N/A
|
Warranty
|
11/16/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. The project associated with this permit is North OLT001 DA104 - REVISED City Buried C
|
|
PRROWA202313323
|
ROW Aerials
|
N/A
|
Closed
|
|
|
:
Right-of-Way
:
Connecting service on pole
|
|
PRROWU202312828
|
ROW Underground
|
N/A
|
Warranty
|
11/03/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along Penn Ave S, Russell Ave S, Sheridan Ave S, and and Xerxes Ave S. The project associated with this permit is North-OLT001 DA103 - City Buried B Revision
|
|
PRROWU202312826
|
ROW Underground
|
N/A
|
Warranty
|
11/03/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is DirectLine Communications. Revised to add buried sections along Penn Ave S, Russell Ave S, Sheridan Ave S, and and Xerxes Ave S. The project associated with this permit is North-OLT001 DA103 - City Buried A Revision
|
|
PREL202311975
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/06/2023
|
|
:
Electrical
:
JRC-0025--Northwestern College-1316
Install new 200-amp 1 ph commercial service, meter, disconnect and equipment cabinet.
|
|
PRROWU202306422
|
ROW Underground
|
N/A
|
Warranty
|
08/28/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the ROW of the city along W 84th St. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is slated to be DirectLine Communications. The project associted with this permit is Pilot: Sector 1 - City Buried
|
|
PRROWU202306421
|
ROW Underground
|
N/A
|
Warranty
|
10/30/2023
|
|
:
Right-of-Way
:
Placing a new fiber network on existing utility poles. This proposal is being sent in on behalf of Intrepid Fiber by Troyer Group. The construction contractor slated to build the project is DirectLine Communications. The project associated with this application is Pilot: Sector 1 - Aerial application.
|
|
PREL202215197
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
12/12/2022
|
|
:
Electrical
:
Egan Job 435483 - Lab controls room 102
|
|
PRFS202214820
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
01/03/2023
|
|
:
Fire Suppression System
:
Adjust sprinkler layout in rooms 102 & 102A for new wall and ceiling layout
|
|
PRPL202213646
|
Plumbing
|
Alteration/Repair/Replace
|
Expired
|
10/31/2022
|
|
:
Plumbing
:
PLUMBING FOR MICROBIOLOGY LAB
|
|
PRMH202213341
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
11/08/2022
|
|
:
Mechanical
:
INSTALL NEW MECHANICAL EQUIPMENT AND DUCT PER MHAC DESIGN.
|
|
PREL202212590
|
Electrical
|
Other
|
Finaled
|
10/06/2022
|
|
:
Electrical
:
Remodel
|
|
PRBD202210283
|
Building
|
Other
|
Finaled
|
10/12/2022
|
|
:
Building
:
Tenant Improvement - Renovation
|
|
PRCRF202207586
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
07/01/2022
|
|
:
Roofing
:
Contractor will supply labor and material to re-roof section C approximately 10,900 square feet of roof surface as follows:
Install Amalgamated polystyrene insulation to effect drainage. Install Carlisle, Johns Manville, or GenFlex 60-mil EPDM synthetic rubber roof membrane system. This roof will be installed in accordance with the manufacturer’s specifications.
|
|
PRTS202204974
|
Sign, Temporary
|
Other
|
Finaled
|
05/11/2022
|
|
:
Sign
:
Display of 10' x 3' fabric sign facing W. 84th St. in front of Northwestern Health Sciences University.
|
|
PREL202112655
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
09/28/2021
|
|
:
Electrical
:
Egan Job 434177 - Replace controls on Chiller and RTU.
|
|
PRFS202109426
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
08/11/2021
|
|
:
Fire Suppression System
:
Add, adjust, and remove sprinkler heads, as needed, where new walls create gaps in existing sprinkler coverage to maintain complete sprinkler coverage per NFPA 13, 2016.
|
|
PREL202108250
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/30/2021
|
|
:
Electrical
:
CLASSROOM REMODEL FOR NORTHWESTERN HEALTH SCIENCES UNIVERSITY
|
|
PRMH202108036
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
06/28/2021
|
|
:
Mechanical
:
Provide and install (1) 30-ton 100% outside air unit and (1) 4-ton RTU ducting and diffusers
|
|
PREL202107776
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/22/2021
|
|
:
Electrical
:
Egan Job 433862 - Integrate New Lab RTU and Heat Exchanger into existing BAS
|
|
PRPL202107541
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
06/24/2021
|
|
:
Plumbing
:
Remodel an anatomy lab
|
|
PRBD202106535
|
Building
|
Alteration/Repair/Replace
|
Expired
|
07/01/2021
|
|
:
Building
:
Updating/remodeling an existing classroom.
|
|
PREL202105220
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
05/07/2021
|
|
:
Electrical
:
Egan Jo b 433486 - Upgrades to controller
|
|
PRCRF202102640
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
04/01/2021
|
|
:
Roofing
:
Commercial flat re-roof remove and re-use ballast. ROOF SECTION "O"
Tear off to insulation inspect / replace if needed. Install 60MIL EPDM. Keep insulation R-Value as cant edge cannot accommodate R-30 per commercial code exception C402.2.1.2.
NOTE: There is another commercial roofing permit for this address on a separate section. Please do not duplicate as the sections of building are different.
|
|
PRCRF202102069
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
03/15/2021
|
|
:
Roofing
:
Commercial flat re-roof tear off to deck, install polystyrene insulation R-23 (perimeter cant edge cannot accommodate R-30 as per commercial code exception C402.2.1.2) install 60mil EPDM, install new perimeter fascia metal.
|
|
PRTC202010461
|
Tent/Canopy
|
Other
|
Finaled
|
09/16/2020
|
|
:
Tent/Canopy
:
We are requesting a permit for a 30' x 20' structure membrane tent being placed at Northwestern Health Science in parking lot. There will be one section facing the grassy area enclosed with sidewall. Placed 30 yards away from the building. The proposed use of the tent is for a outdoor seating commencement ceremony.
Ultimate Events to install tent only. No cooking or smoking in or near the tent.
Install Friday, September 18th and tear down Monday, September 21st. Event use Saturday, September 19th.
|
|
PRTC202008365
|
Tent/Canopy
|
Other
|
Finaled
|
08/07/2020
|
|
:
Tent/Canopy
:
Ultimate Events is requesting a permit for 1 - 30x50 canopy (1 side enclosed). There will be a 10x20 canopy on site as well. The proposed use is for Northwestern Health Science commencement and welcome tents. Install 8/14 and tear down 8/15 after use. No cooking or smoking, nor will there be any heat or propane use.
|
|
PRFS202004607
|
Fire Suppression System
|
Other
|
Finaled
|
05/15/2020
|
|
:
Fire Suppression System
:
Plug off one head, relocate 8 existing heads and add 3 new
|
|
PRPL202002009
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
03/12/2020
|
|
:
Plumbing
:
install new hand sink
Northwestern Health Sciences
|
|
PREL202000923
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/31/2020
|
|
:
Electrical
:
Office remodel - offices 101-113
Demo walls & power new lights
|
|
PRPL202000713
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
01/29/2020
|
|
:
Plumbing
:
RPZ rebuild
Northwest Health Sciences
|
|
PRBD202000380
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
02/11/2020
|
|
:
Building
:
Interior Remodel
|
|
PREL201911165
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
09/25/2019
|
|
:
Electrical
:
SIGNS - NORTHWESTERN HEALTH SCIENCES UNIVERSITY
|
|
PRFD201910641
|
Foundation
|
Other
|
Expired
|
09/25/2019
|
|
:
Foundation
:
Footing details for new signage at NORTHWESTERN HEALTH SCIENCES UNIVERSITY
|
|
PREL201909159
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
08/09/2019
|
|
:
Electrical
:
UPGRADING LED
|
|
PRPS201908808
|
Sign, Permanent
|
New Sign
|
Finaled
|
09/23/2019
|
|
:
Sign
:
E01 - Channel Letters Face/Halo Lit 3'-10 7/8" X 21'-4 7/16"
83.5 sqft
E02 - Channel Letters Face/Halo Lit 5'-5 1/2" X 21'-4 7/16"
116.6 sqft
E03 - FCOs (non lit) 5'-9 13/16" X 5'-7 7/8"
32 sqft
E04 - Face Replacement (non lit) 6'-3" X 6'-3"
39.1 sqft
E05 - Monumnet A LED illuminated 5'-2" X 5'-6"
28.4 sqft
E06 - Monumnet B LED illuminated 7'-0" X 8'-3"
57.8 sqft
E07 - Primary Directional (non lit) 6'-9" X 2'-9"
19.6 sqft
E08 - QTY 4 Secondary Directional (non lit)
#1 - 3'-2" X 2'-6" = 7.9 sqft
#2 - 2'-5" X 2'-6" = 6 sqft
#3 - 1'-11 1/2" X 2'-6" = 4.9 sqft
#4 - 1'-11 1/2" X 2'-6" = 4.9 sqft
E09 - QTY 2 - LOT ID 2'-6" X 1'-0"
2.5 sqft
E10 - QTY 10 (not sure if permit is required for these)
1'-6" X 1'-6"
2.25 sqft
|
|
PRPL201902476
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
03/21/2019
|
|
:
Plumbing
:
Rebuild RPZ Z2993 - Northwestern Health Sciences - Pump Room - Heating return makeup water
|
|
PREL201900886
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/28/2019
|
|
:
Electrical
:
Egan Job 431096 - Replace MX's with SBC controllers. Northwestern Health Scienc
|
|
PREL201802699
|
Electrical
|
Repair/Replace
|
Finaled
|
04/03/2018
|
|
:
Electrical
:
Replace (17) controllers. Egan job 430008.
|
|
PRPL201801480
|
Plumbing
|
Repair/Replace
|
Finaled
|
02/21/2018
|
|
:
Plumbing
:
Rebuild 2 RPZ units. Serial #Z2993 located VHS Clinic Mechanical Room. Serial #00721C located in boiler room behind stairs.
|
|
PRMH201800478
|
Mechanical/HVAC
|
Alteration/Remodel
|
Finaled
|
01/19/2018
|
|
:
Mechanical
:
Install new baseboard radiation in two rooms. Northwestern Health Sciences University.
|
|
PRAL201711871
|
Fire Alarm
|
Other
|
Finaled
|
12/15/2017
|
|
:
Fire Alarm
:
Egan Job 429278 - Add one horn strobe and replace/relocate one horn strobe.
|
|
PREL201711870
|
Electrical
|
Alteration/Remodel
|
Permit(s) Issued
|
12/20/2017
|
|
:
Electrical
:
Egan Job 429278 - Fire alarm, one new strobe, one relocate strobe.
|
|
PREL201711561
|
Electrical
|
Repair/Replace
|
Finaled
|
12/05/2017
|
|
:
Electrical
:
(Egan job 429184) interface (2) new FCU's into the BAS system.
|
|
PRFS201711320
|
Fire Suppression System
|
Other
|
Finaled
|
11/29/2017
|
|
:
Fire Suppression System
:
Raise existing pipe as high as possible in (2) classrooms. Install pendent heads at new act ceiling.
|
|
PRMH201711066
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
11/17/2017
|
|
:
Mechanical
:
Install a new (4) ton fan coil and condensing unit with associated ductwork for (2) classrooms.
(1) set of equipment in each room
|
|
PRBD201710866
|
Building
|
Alteration/Remodel
|
Finaled
|
11/13/2017
|
|
:
Building
:
Drywall, paint, and drop ceiling
|
|
PREL201710762
|
Electrical
|
Alteration/Remodel
|
Finaled
|
11/09/2017
|
|
:
Electrical
:
Power and lighting for classroom remodel.
|
|
PREL201700587
|
Electrical
|
Repair/Replace
|
Closed
|
02/15/2017
|
|
:
Electrical
:
Building automation modification: Conversion to Aspect.
|