PRFS202500127
|
Fire Suppression System
|
Other
|
Permit(s) Issued
|
01/23/2025
|
|
:
Fire Suppression System
:
INSTALLATION OF TWO NEW ANSUL PIRANHA FIRE SUPPRESSION SYSTEMS INTO NEW KITCHEN HOODS.
|
PRROWO202413684
|
ROW Obstruction
|
N/A
|
Permit(s) Issued
|
10/22/2024
|
|
:
Right-of-Way
:
Extraction of temporary earth retention piles on the SE corner of the SICK Campus Phase II project - 2601 American Boulevard E.
|
PRROWU202404688
|
ROW Underground
|
N/A
|
Warranty
|
04/19/2024
|
|
:
Right-of-Way
:
Bore under road, set devices in easement
|
PRROWU202402870
|
ROW Underground
|
N/A
|
Warranty
|
03/21/2024
|
|
:
Right-of-Way
:
Bore primary cable. 850'
|
PRAL202401422
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
05/10/2024
|
|
:
Fire Alarm
:
Existing Honeywell fire alarm system to remain.
New Notification devices to be installed throughout building.
New NAC Power supplies to be added.
|
PREL202400365
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
01/10/2024
|
|
:
Electrical
:
RENOVATE EXISTING STORAGE ROOM INTO NEW CONFERENCE ROOM.
|
PRFS202400056
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
01/22/2024
|
|
:
Fire Suppression System
:
Add/relocate 10 heads on existing fire protection system for interior remodel.
|
PRMH202315394
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
12/20/2023
|
|
:
Mechanical
:
Installing a VAV box with a hot water coil.
|
PRBD202315138
|
Building
|
Alteration/Repair/Replace
|
Expired
|
12/27/2023
|
|
:
Building
:
SICK N110 Storage and N110B Meeting Room Project
Taking an existing storage room and turning it into two separate rooms - one storage and one meeting room. Includes drywall work, new door, frame, hardware, ceiling alterations, and paint.
|
PREL202307946
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
07/18/2023
|
|
:
Electrical
:
POWER TO STORAGE UNIT
|
PRBD202306864
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
07/25/2023
|
|
:
Building
:
Installing high density racking.
Sprinkler permit is being separately pulled, but plans will be supplied here for reference.
|
PRFS202306394
|
Fire Suppression System
|
Other
|
Finaled
|
07/03/2023
|
|
:
Fire Suppression System
:
Install new in rack fire sprinkler system and hose valve per FM 2017
|
PREL202213814
|
Electrical
|
Other
|
Finaled
|
11/03/2022
|
|
:
Electrical
:
Temporary generator for event.
|
PREL202212849
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
10/11/2022
|
|
:
Electrical
:
8 CIRCUITS ADDED FOR NEW SYSTEMS at 2601 American Blvd E
|
PRTC202212733
|
Tent/Canopy
|
Other
|
Expired
|
10/11/2022
|
|
:
Tent/Canopy
:
Setting up a 66'x149' tent for SICK, Inc.
|
PRFD202211878
|
Foundation
|
Other
|
Expired
|
10/06/2022
|
|
:
Foundation
:
Installing 5 freestanding signs.
|
PRROWU202211851
|
ROW Underground
|
N/A
|
Warranty
|
07/19/2023
|
|
:
Right-of-Way
:
Bore 225 feet of 6pr 22 gauge copper cable from ped to splice pit
|
PRTC202211824
|
Tent/Canopy
|
Other
|
Finaled
|
09/19/2022
|
|
:
Tent/Canopy
:
Lunch event for employees. Tent has been reserved in case of rain.
|
PRPS202210966
|
Sign, Permanent
|
New Sign
|
Finaled
|
10/06/2022
|
|
:
Sign
:
Install (5) directional monument signs.
B1: 7' x 4'
B2: 6' x 3'
B3: 6' x 3'
B4: 5' x 2'
B5: 5' x 2'
Foundation Permit PRFD202211878
|
PREL202210492
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
08/18/2022
|
|
:
Electrical
:
THIS IS A SUPPLEMENT TO PERMIT #PREL2021-07558 AS REQUESTED BY INSPECTOR ERIC HANSON
|
PREL202209985
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/10/2022
|
|
:
Electrical
:
Conveyor relocation for client.
|
PREL202207730
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/30/2022
|
|
:
Electrical
:
THIS IS A SUPPLEMENT TO PERMIT #PREL2021-07558 AS REQUESTED BY INSPECTOR ERIC HANSON
|
PRBD202205970
|
Building
|
Other
|
Expired
|
06/30/2022
|
|
:
Building
:
We are installing Pallet Racking and Shelving
|
PRROWU202205725
|
ROW Underground
|
N/A
|
Finaled
|
06/27/2022
|
|
:
Right-of-Way
:
Directional boring 2 conduits 200' along American Blvd to serve they newly constructed Sick Building
|
PRPS202202599
|
Sign, Permanent
|
New Sign
|
Finaled
|
03/28/2022
|
|
:
Sign
:
2 sets of face lit channel letters being installed. 72" and 53"
|
PRROWU202202019
|
ROW Underground
|
N/A
|
Finaled
|
05/23/2022
|
|
:
Right-of-Way
:
Start in MH-108 bore north 21', turn east and bore 260' along American Ave, turn south and bore 125' across American Ave onto customer property.
|
PREL202116604
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/22/2021
|
|
:
Electrical
:
Installation of control wiring
|
PRROWO202115708
|
ROW Obstruction
|
N/A
|
Warranty
|
12/06/2021
|
|
:
Right-of-Way
:
Crane set up in road to set windows.
|
PRTP202115213
|
Tank/Pipe Install/Removal
|
Other
|
Expired
|
11/16/2021
|
|
:
Tank
:
temp tanks (2/500gallon tanks set for construction heat
|
PRFS202114984
|
Fire Suppression System
|
Other
|
Finaled
|
12/13/2021
|
|
:
Fire Suppression System
:
furnish and install complete fire protection system intended to protect entire structure; 1,456 heads
|
PRDR202114554
|
Driveway
|
New Driveway
|
Finaled
|
11/02/2021
|
|
:
Driveway
:
Installing 3 new commercial aprons
|
PRWE202114391
|
Well
|
Alteration/Repair/Replace
|
Finaled
|
10/28/2021
|
|
:
Well
:
Removing the temporary dewatering wells for Frattalone along American Boulevard
|
PRMH202113803
|
Mechanical/HVAC
|
Other
|
Finaled
|
11/03/2021
|
|
:
Mechanical
:
New warehouse and production facility. All new equipment (rooftop units with VAV distribution system, exhaust fans, boilers, pumps, finned tube radiation).
|
PRROWU202113496
|
ROW Underground
|
N/A
|
Finaled
|
12/06/2021
|
|
:
Right-of-Way
:
INSTALL A NEW GAS SERVICE MGC# 21-5074 WO# 100117038
|
PRWE202113256
|
Well
|
Alteration/Repair/Replace
|
Finaled
|
10/07/2021
|
|
:
Well
:
Installing six (6) temporary dewatering wells to aid in the installation of storm sewer structures for the Sick Technologies Campus project.
|
PREL202112021
|
Electrical
|
Other
|
Expired
|
09/10/2021
|
|
:
Electrical
:
Install New Fire Alarm System.
|
PRAL202112016
|
Fire Alarm
|
Other
|
Finaled
|
12/17/2021
|
|
:
Fire Alarm
:
Install New Fire Alarm System
|
PRPL202110111
|
Plumbing
|
Other
|
Finaled
|
08/19/2021
|
|
:
Plumbing
:
SICK Technologies New Facility
|
PRUT202108333
|
Utility
|
New
|
Finaled
|
07/08/2021
|
|
:
Utility
:
Water, sanitary and storm sewer for new building site construction
|
PREL202107558
|
Electrical
|
Other
|
Finaled
|
07/26/2021
|
|
:
Electrical
:
TENANT FINISH COMPLETE ELECTRICAL WIRING.
|
PRROWU202107331
|
ROW Underground
|
N/A
|
Finaled
|
|
|
:
Right-of-Way
:
Xcel is trenching in 300' of cable for temporary service to SICK site
|
PRROWU202107262
|
ROW Underground
|
N/A
|
Finaled
|
06/18/2021
|
|
:
Right-of-Way
:
INSTALL 1440' OF 3PHASE 1/0AL UNDERGROUND CABLE. THIS IS A REROUTE OF THE EXISTING CABLE RUNNING THROUGH THE COMBINED EXISTING PROPERTIES TO MAKE ROOM FOR THE NEW REDEVELOPMENT OF THE PROPERTY
|
PREL202107052
|
Electrical
|
Other
|
Finaled
|
06/11/2021
|
|
:
Electrical
:
TEMPORARY ELECTRIC SERVICE INSTALLATION
|
PRGR202106799
|
Grading
|
Alteration/Repair/Replace
|
Expired
|
06/14/2021
|
|
:
Grading
:
Grading for 9 acre site and 138,000 SF future building footprint.
|
PRBD202104058
|
Building
|
New
|
Finaled
|
07/07/2021
|
|
:
Building
:
Ground-up construction of a 140,000 SF office, warehouse, and distribution center for SICK, Inc.
|
PRPL202004022
|
Plumbing
|
Alteration/Repair/Replace
|
Expired
|
05/05/2020
|
|
:
Plumbing
:
Decommission RPZ Febco 825Y, s/n 02331, 1.1/2".
Installed new RPZ Wilkins 975, s/n 4800138, 1.1/2".
Report has been emailed to Julie S., Utility Dept.
|
PRWE201901699
|
Well
|
Other
|
Finaled
|
02/28/2019
|
|
:
Well
:
10 temporary environmental soil borings for proposed development.
|
PRWE201901698
|
Well
|
Other
|
Finaled
|
02/28/2019
|
|
:
Well
:
4 temporary environmental soil borings for proposed development.
|
PRWE201901697
|
Well
|
Other
|
Finaled
|
02/28/2019
|
|
:
Well
:
4 temporary environmental soil borings for proposed development.
|
PRWE201901696
|
Well
|
Other
|
Finaled
|
02/28/2019
|
|
:
Well
:
7 temporary environmental soil borings for proposed development.
|
PRWE201809282
|
Well
|
Other
|
Finaled
|
08/16/2018
|
|
:
Well
:
Environmental well sealings
|
PRWE201809262
|
Well
|
Other
|
Finaled
|
08/16/2018
|
|
:
Well
:
Environmental well sealing.
|
PRDE201800719
|
Demolition
|
Other
|
Finaled
|
06/27/2018
|
|
:
Demolition
:
Complete demolition of building per City Plans
|
PRDE201711029
|
Demolition
|
Other
|
Finaled
|
01/24/2018
|
|
:
Demolition
:
Complete demolition of one-story building. One of three demo permits for Interstate Diesel. One more building will demolition in the Spring, 2018.
|
PRDE201711028
|
Demolition
|
Other
|
Finaled
|
01/24/2018
|
|
:
Demolition
:
Complete demolition of one-story building. One of three demo permits for Interstate Diesel. One more building will demolition in the Spring, 2018.
|
PRDE201711027
|
Demolition
|
Alteration/Repair/Replace
|
Finaled
|
01/24/2018
|
|
:
Demolition
:
Complete demolition of one-story building. One of three demo permits for Interstate Diesel. One more building will demolition in the Spring, 2018.
|