PREL202504329
|
Electrical
|
Other
|
Permit(s) Issued
|
04/25/2025
|
|
:
Electrical
:
INSTALLATION OF 100AMP SERVICE 120/240V W/ 4 CKTS FOR MN DOT TRAFFIC MANAGEMENT SYSTEM - MN DOT PROVIDED ADDRESS OF 1149 HWY I-494 - SEE PRINT - DAN BACHLER IS FIELD CONTACT 612-298-9747
|
PREL202409556
|
Electrical
|
Other
|
Expired
|
07/24/2024
|
|
:
Electrical
:
INSTALLATION OF 100AMP SERVICE 120/240V W/4CKTS AND 10 LIGHTING STANDARDS
EGAN # 359693 DAN BACHLER IS FIELD CONTACT 612-298-9747
|
PRROWO202401115
|
ROW Obstruction
|
N/A
|
Finaled
|
02/07/2024
|
|
:
Right-of-Way
:
CHANGING EXISING COMCAST AERIAL EQUIPMENT TO NEW VERSONS
|
PREL202202408
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/17/2022
|
|
:
Electrical
:
WIRE RECEPTACLES FOR BOILERS
|
PRPL202202303
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
03/10/2022
|
|
:
Plumbing
:
Replace two failed /failing 800,000 btuh potable water heaters with 8- 199,900 btuh tankless potable water heaters
|
PRROWU202105358
|
ROW Underground
|
N/A
|
Finaled
|
06/14/2021
|
|
:
Right-of-Way
:
Xcel is upgrading 3 spans of secondary, installing a small single phase pedestal and connecting a commercial underground service.
|
PREL202100961
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/03/2021
|
|
:
Electrical
:
Installing a Manhole Level Monitoring Control Panel with a Single Phase 120/240 Volt 60 Amp Service.
|
PREL202000655
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/29/2020
|
|
:
Electrical
:
Wiring to add (6) exterior building lights to north and west façade.
|
PRFD201903726
|
Foundation
|
Other
|
Expired
|
05/10/2019
|
|
:
Foundation
:
Install 4'6" deep x 2' round footings for 2 monument signs (on sign permit #PRPS201813867)
|
PRUT201903473
|
Utility
|
New
|
Finaled
|
04/17/2019
|
|
:
Utility
:
3" OMNI C2 Domestic S/N E3000000 Rdg 00000101
1" IPerl Irrigation S/N E1000034 Rdg 0000010. with Dual Port Radio
Irrigation connection
|
PRUT201900478
|
Utility
|
New
|
Finaled
|
01/15/2019
|
|
:
Utility
:
5/8" badger fire meter, ser #44217828, rdg 0
|
PRTP201815141
|
Tank/Pipe Install/Removal
|
Other
|
Expired
|
12/14/2018
|
|
:
Tank
:
Temp tank during construction of new building (Holiday Inn Express & Suites)
|
PRPS201813867
|
Sign, Permanent
|
New Sign
|
Finaled
|
11/19/2018
|
|
:
Sign
:
New signage being installed at a new construction hotel.
|
PREL201811766
|
Electrical
|
Alteration/Remodel
|
Finaled
|
10/16/2018
|
|
:
Electrical
:
Building automation control wiring. Holiday Inn Express.
|
PREL201811164
|
Electrical
|
Alteration/Remodel
|
Finaled
|
11/08/2018
|
|
:
Electrical
:
Wire (4) building signs & (2) monument signs.
|
PRDR201804963
|
Driveway
|
Repair/Replace
|
Finaled
|
05/25/2018
|
|
:
Driveway
:
Curb & gutter, driveway aprons, concrete sidewalks
|
PRAL201804016
|
Fire Alarm
|
Other
|
Finaled
|
05/29/2018
|
|
:
Fire Alarm
:
new fire alarm system for Holiday Inn
|
PREL201804013
|
Electrical
|
Alteration/Remodel
|
Finaled
|
05/29/2018
|
|
:
Electrical
:
Electrical for new fire alarm
|
PRMH201803644
|
Mechanical/HVAC
|
New
|
Finaled
|
05/31/2018
|
|
:
Mechanical
:
HVAC for new hotel. Includes make-up air, exhaust, pool ventilation, PTAC's furnished by others. Elevator shaft - heating/clearing.
|
PREL201802438
|
Electrical
|
Alteration/Remodel
|
Finaled
|
04/12/2018
|
|
:
Electrical
:
Wire new Holiday Inn Express hotel.
|
PRFS201802252
|
Fire Suppression System
|
New
|
Finaled
|
04/18/2018
|
|
:
Fire Suppression System
:
New standpipe and sprinkler system for New Holiday Express building
|
PRPL201800119
|
Plumbing
|
Repair/Replace
|
Finaled
|
03/07/2018
|
|
:
Plumbing
:
New Holiday Inn Express
|
PREHP201711438
|
Environmental Health Plan
|
New
|
Finaled
|
05/16/2018
|
|
:
Environmental Health Plan
:
New 5 story Holiday Inn Express hotel.
|
PRST201711433
|
Structural
|
New
|
Finaled
|
12/27/2017
|
|
:
Building
:
Footings, foundations, and wood and steel structural frame work
|
PRUT201710565
|
Utility
|
Alteration/Repair/Replace
|
Finaled
|
11/02/2017
|
|
:
Utility
:
13 water disconnects and 5 sewer disconnects (Northwood Inn & 1301 E 78th) and 18 ROW holes
|
PREL201710049
|
Electrical
|
Other
|
Finaled
|
10/23/2017
|
|
:
Electrical
:
Temp Service for Holiday Inn Express(new building construction) 400 Amps.
|
PRDE201709463
|
Demolition
|
Other
|
Finaled
|
11/22/2017
|
|
:
Demolition
:
Complete demolition and removal of existing hotel. Submitted with permit PRDE201709464.
|
PRBD201706480
|
Building
|
New
|
Finaled
|
05/31/2018
|
|
:
Building
:
Construction of a new 5 story, wood frame, Holiday Inn Express hotel with related sitework.
|