PRDR202512541
|
Driveway
|
New Driveway
|
Finaled
|
10/20/2025
|
|
:
Driveway
:
Pouring new concrete driveway
|
|
PRROWU202511710
|
ROW Underground
|
N/A
|
Warranty
|
10/03/2025
|
|
:
Right-of-Way
:
Proof and pull 476' in RoW along American Blvd W to existing vault, then directional drill (2)2" ducts 89' in RoW/easement to the southeast corner of, the new MDU building, 700 American Blvd W.
|
|
PRROWU202510265
|
ROW Underground
|
N/A
|
Permit(s) Issued
|
01/07/2026
|
|
:
Right-of-Way
:
6'x5'x4' Pit needed to remove a pedestal and bury the splice. Remove an existing handhole and Place one new 48"x36"x30" handhole.
|
|
PRUT202508518
|
Utility
|
New
|
Finaled
|
08/12/2025
|
|
:
Utility
:
3" domestic meter & 1 1/2" irr meter
|
|
PRROWU202507749
|
ROW Underground
|
N/A
|
Permit(s) Issued
|
09/10/2025
|
|
:
Right-of-Way
:
P.256171 (1 of 1)
Access an existing handhole in the sidewalk area along the west side of Lyndale Ave S and bore 150' to place a new 1.25" conduit with fiber cable to provide new fiber service to a new building at 700 American Blvd W.
|
|
PRMH202507333
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
07/08/2025
|
|
:
Mechanical
:
install 2 gas fireplaces with venting in entry/lounge 130, heat & glo, primo-II-60, INSTALL GAS FIREPLACE WITH VENTING IN CLUBROOM 133, HEAT & GLO, 8K MOD
|
|
PRROWU202505445
|
ROW Underground
|
N/A
|
Ready for Issuance
|
|
|
:
Right-of-Way
:
XCEL ENERGY TO SPLICE INTO EXISTING CABLE ON THE NORTH SIDE OF AMERICAN BLVD W, AND USE A VAC TRUCK TO OPEN TRENCH FOR NEW CABLE GOING INTO PRIVATE PROPERTY AT 700 AMERICAN BLVD W.
|
|
PRROWU202505301
|
ROW Underground
|
N/A
|
Ready for Issuance
|
|
|
:
Right-of-Way
:
XCEL ENERGY TO SPLICE INTO EXISTING CABLE IN R-O-W ON NORTH SIDE OF AMERICAN BLVD W, THEN TRENCH OR USE VAC TRUCK TO INSTALL CABLE ON TO PRIVATE PROPERTY AT 700 AMERICAN BLVD W.
|
|
PRROWU202504646
|
ROW Underground
|
N/A
|
Ready for Issuance
|
|
|
:
Right-of-Way
:
MGC25-79213/WO#116922629 Field contact Ron Lindstrom 612-366-5968 Abandon natural gas service line
|
|
PRFS202501654
|
Fire Suppression System
|
Other
|
Finaled
|
03/25/2025
|
|
:
Fire Suppression System
:
Furnish and install a new NFPA 13 automatic fire sprinkler system.
|
|
PRROWO202501511
|
ROW Obstruction
|
N/A
|
Finaled
|
03/03/2025
|
|
:
Right-of-Way
:
Eagle Building Company is applying for a ROW Obstruction permit for the sidewalk running east-west along American Boulevard, and the south side of the Building Site.
There will be two (2) Potain T-85A cranes erected on the south side of the jobsite for the duration of the Rough Carpentry Framing scope of work. Due to the constraints of the building site, crane weights, and safe sloping the crane pads will encroach into the fore mentioned sidewalk. Eagle Building Company is committed to doing everything in it's power to ensure that as little of the sidewalk is disrupted as possible.
Attached to this permit application is a Traffic Control plan displaying the intent of the sidewalk encroachment. Rough Carpentry Framing is currently scheduled to begin in late February. Crane erection scheduled for last week of February/first week of March. Duration of Framing = about 3 months. Cranes would be scheduled to come down in late May/early June.
|
|
PRAL202501323
|
Fire Alarm
|
Other
|
Finaled
|
02/27/2025
|
|
:
Fire Alarm
:
New Intelligent Fire Alarm System with elevator recall functions, sprinkler system monitoring, low frequency notification appliances.
|
|
PRROWO202500269
|
ROW Obstruction
|
N/A
|
Permit(s) Issued
|
01/27/2025
|
|
:
Right-of-Way
:
In order to complete Post-Tension Concrete deck pours on the 700 American project located on the corner of American Blvd. and Lyndale Ave. the sidewalk that runs east-west along American Blvd. along with the adjacent turn lane, and in some instances, the center lane of American Blvd. will need to be temporarily closed down.
There will be five (5) PT concrete pours total (weather permitting). For the first pour, the sidewalk and the turn lane will need to be closed down. For the second-fifth pours, the sidewalk, turn lane, and center lane will need to be temporarily closed down. I have traffic control plans for each of the above mentioned scenarios.
Pours will aim to begin at 6:00am and take six (6) to ten (10) hours. Upon completion of each pour, the traffic control measures will be removed, and impacted areas opened back up.
|
|
PRUT202500072
|
Utility
|
New
|
Finaled
|
02/18/2025
|
|
:
Utility
:
New Water (combined 8" Fire/water) - 562ft of water line installation, two 8 " wet taps and gate valves (Connection in Lyndale Ave S and connection in American Blvd W)
New Storm Sewer - new infiltration tank, 478 ft of Schedule 40 PVC storm sewer installation (see C300.0 - Utility Plan for varying sizes and additional structures)
Sanitary Sewer - Installation & connection of 120 ft 8" PVC
|
|
PRMH202416565
|
Mechanical/HVAC
|
Other
|
Closed
|
12/26/2024
|
|
:
Mechanical
:
temp heat: 2@ 1000MBH, 6@ 375MBH, 12@ 170MBH
|
|
PRMH202416563
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
01/13/2025
|
|
:
Mechanical
:
Complete HVAC system for new 128 unit apartment
|
|
PRPL202416562
|
Plumbing
|
Other
|
Finaled
|
12/26/2024
|
|
:
Plumbing
:
Complete plumbing system in new 128 unit apartment.
|
|
PREL202415668
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/08/2025
|
|
:
Electrical
:
Complete electrical systems for 128-unit apt bldg; including wiring for temperature control and fire alarm
|
|
PRROWU202415213
|
ROW Underground
|
N/A
|
Warranty
|
12/11/2024
|
|
:
Right-of-Way
:
(114534957/114535170 - 24-77537) INSTALL NEW 2" PE GAS SERVICE PIPING TO 2 LOCATIONS FOR NEW APT BLDG.
|
|
PREL202409884
|
Electrical
|
Other
|
Finaled
|
07/31/2024
|
|
:
Electrical
:
temp service; 400A 1PH 16 circuits
|
|
PRBD202404560
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
10/30/2024
|
|
:
Building
:
Full Building Permit submittal for the new, senior housing project located at the NW corner of American Boulevard & Lyndale Avenue. The Footing and Foundation Permit for this building was submitted back on January 4, 2024 (Application #: PRFD202400163). This permit submittal is a continuance & final submittal from the Footing and Foundation Permit. 128 Units
Please Note: The Building valuation within this application is for the entire building (including the foundation) - the previous valuation provided for the Footing and Foundation Permit was only for the Foundation so the valuations should not be combined - full valuation is included within this application.
|
|
PRFD202400163
|
Foundation
|
Other
|
Finaled
|
10/30/2024
|
|
:
Foundation
:
Footing and foundation permit application for a 128-unit apartment building. The foundation/underground parking garage is constructed of CIP concrete walls and PT slab on first floor. There is small area above the first floor which has CIP columns and PT slab as well.
|
|
PREL202304098
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/25/2023
|
|
:
Electrical
:
Install HVAC controls for Topline Financial Credit Union. Scope consists of (1) RTU, (8) VAV's and (1) Exhaust fan.
|
|
PRWE202100304
|
Well
|
Other
|
Finaled
|
01/12/2021
|
|
:
Well
:
Annual Maintenance Permit
|