PRBD201804269
|
Building
|
Alteration/Remodel
|
Finaled
|
06/14/2018
|
|
:
Building
:
Demo & Remodel of Woolley's Bar in the Embassy Suites
|
PRBD201803216
|
Building
|
Alteration/Repair/Replace
|
Closed
|
01/14/2019
|
|
:
Building
:
Replace ceiling grid. White galvanized steel grid with vinyl coated fire rock.
|
PRPK201800968
|
Parking Lot
|
New
|
Finaled
|
07/12/2018
|
|
:
Parking Lot
:
Parking lot site development of a vacant lot and repave existing lot. New light poles and replace existing, install landscaping per plan. Embassy Suites
|
PRFS201800188
|
Fire Suppression System
|
Other
|
Finaled
|
01/09/2018
|
|
:
Fire Suppression System
:
Add/relocate fire sprinkler heads for main floor remodel. 1 for 1 relocates.
|
PRST201711841
|
Structural
|
Alteration/Remodel
|
Finaled
|
12/15/2017
|
|
:
Building
:
Structural permit for Embassy Suites Hotel. Install concrete piers and footings for walls and posts. Install trenches for underground waste, water, and electrical. Install concrete for raised platform in atrium. Separate building permit will be issued as well.
|
PRMH201711699
|
Mechanical/HVAC
|
Alteration/Remodel
|
Finaled
|
01/03/2018
|
|
:
Mechanical
:
Embassy Suites mechanical and hvac in cook-to-order area, pool area, fitness room, lobby/luggage area (based on attached scope of work). Only HVAC work (excludes gas piping, power wiring, engineering, structural work, roofing orf equipment screening, fire suppression). Applicant only had "see plans" in description of work.
|
PRDE201711095
|
Demolition
|
Alteration/Remodel
|
Expired
|
11/16/2017
|
|
:
Demolition
:
Selective demolition of public spaces.
|
PRPL201710741
|
Plumbing
|
Alteration/Remodel
|
Finaled
|
05/10/2018
|
|
:
Plumbing
:
Remodel of existing mens and womens restrooms in Atrium. Remodel of existing mens and womens pool area restrooms. Remodel of existing cook to order kitchen in Atrium. Gas hook up for 2 griddles and one stove to existing gas line/cook line.
|
PREL201710520
|
Electrical
|
Alteration/Remodel
|
Finaled
|
11/01/2017
|
|
:
Electrical
:
Remodel of main floor lobby and Atrium. Embassy Suites Hotel.
|
PREL201710456
|
Electrical
|
Alteration/Remodel
|
Permit(s) Issued
|
10/31/2017
|
|
:
Electrical
:
Installation of Building Automation Systems (BAS). Embassy Suites.
|
PREHP201710299
|
Environmental Health Plan
|
New
|
Finaled
|
05/30/2018
|
|
:
Environmental Health Plan
:
Alterations at cook to order kitchen, trash room and pool.
|
PRBD201709422
|
Building
|
Alteration/Remodel
|
Finaled
|
03/14/2018
|
|
:
Building
:
Interior renovation of the atrium and 1st floor public spaces.
|
PRMH201705480
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
07/06/2017
|
|
:
Mechanical
:
Replace existing MUA in penthouse at Embassy Suites with new Trane 2525 MBTU/hr 53,000 CFM; Modify existing piping to allow simultaneous heating and cooling.
|
PRMH201704306
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
06/01/2017
|
|
:
Mechanical
:
Replace existing AHU serving laundry room with new.
|
PREL201704161
|
Electrical
|
Alteration/Remodel
|
Permit(s) Issued
|
06/01/2017
|
|
:
Electrical
:
Smoke detector additions for for storage rooms.
|
PRAL201704160
|
Fire Alarm
|
Alteration/Remodel
|
Permit(s) Issued
|
06/01/2017
|
|
:
Fire Alarm
:
Addition of (18) smoke detectors for storage rooms.
|
PRCRF201700397
|
Roof, Commercial
|
Repair/Replace
|
Finaled
|
02/22/2017
|
|
:
Roofing
:
|