PRTS202514091
|
Sign, Temporary
|
Other
|
Finaled
|
11/03/2025
|
|
:
Sign
:
We have hung a temporary vinyl sign on our building facing auto club rd. This sign displays our website and service times. We are a church who purchased the former Bethany Global University site. We host Sunday services in the church building.
|
|
PRBD202509806
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
08/14/2025
|
|
:
Building
:
interior drain tile, sump basket and sump pump
|
|
PRBD202509755
|
Building
|
Alteration/Repair/Replace
|
Closed - Incomplete Submittal
|
|
|
:
Building
:
We would like to repair and replace a guardrail on an existing deck on our property. The state of the deck was left in poor condition by the previous property owners. Our goal is to rebuild the guardrail in a simple, effective manner that is up to building code. We would like to utilize our current maintenance staff to complete the repair.
|
|
PREL202503430
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/04/2025
|
|
:
Electrical
:
200 Amp state panel feeder
|
|
PRPS202502706
|
Sign, Permanent
|
Face Change
|
Finaled
|
03/20/2025
|
|
:
Sign
:
Due to the ownership change of the property, we would like to update the sign to reflect the current ownership
|
|
PREHP202411012
|
Environmental Health Plan
|
Other
|
Finaled
|
12/10/2024
|
|
:
Environmental Health Plan
:
Installing a micromarket - unattended with self-checkout kiosk to sell prepackaged goods such as chips and soda.
|
|
PRPL202403113
|
Plumbing
|
Alteration/Repair/Replace
|
Closed
|
03/15/2024
|
|
:
Plumbing
:
Rebuild (2) RPZ's at 6820 Auto Club Rd. Bloomington, MN 55438
|
|
PRPS202311590
|
Sign, Permanent
|
New Sign
|
Finaled
|
10/05/2023
|
|
:
Sign
:
Furnish and install (1) non-illuminated letter set on East elevation canopy. Copy to read: Bethany.
|
|
PRMH202309550
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Mechanical
:
Relocation of existing diffusers, and modify bathroom exhaust.
|
|
PRFS202308711
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
08/14/2023
|
|
:
Fire Suppression System
:
- Restroom 128 - reroute auxiliary drain to just a valve at drain elbow keeping it above the ceiling.
- Demo and plug off ITV above the ceiling.
- Children's restroom 124 - replace sprinkler with new QR pendent and semi recessed escutcheon.
- Janitor 136 - Add 1 pendent sprinkler.
- Add 1 upright sprinkler to the new room.
- Relocate ITV to the new mop sink.
- Classroom 109 - Demo 6 existing drops and install new flex drops for new acoustical ceiling.
|
|
PREL202308696
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/08/2023
|
|
:
Electrical
:
Replace several fixtures and remodel work in 2 restrooms and classroom.
|
|
PREL202308278
|
Electrical
|
Alteration/Repair/Replace
|
Closed
|
01/02/2024
|
|
:
Electrical
:
reconnect new monument sign PRPS202307647
|
|
PRPS202308238
|
Sign, Permanent
|
Face Change
|
Finaled
|
07/28/2023
|
|
:
Sign
:
Reface (1) existing non-illuminated monument sign.
Copy to read: United Christian Academy, Hand in Hand Christian Montessori, Bethany Global University.
|
|
PREHP202308044
|
Environmental Health Plan
|
Alteration/Repair/Replace
|
Closed
|
07/20/2023
|
|
:
Environmental Health Plan
:
Bathroom/classroom renovations.
|
|
PRFD202307810
|
Foundation
|
Other
|
Finaled
|
07/14/2023
|
|
:
Foundation
:
Install (1) footing for a new monument sign for Bethany.
|
|
PRPS202307647
|
Sign, Permanent
|
New Sign
|
Finaled
|
07/24/2023
|
|
:
Sign
:
Furnish and install the following signs:
SIGN 1 - Illuminated monument sign with new footing to replace existing. Copy: Bethany. Existing monument to be removed.
SIGN 2 - Non-illuminated on-building letter set on South elevation. Copy: Bethany Global University.
PREL202308278
PRFD202307810
|
|
PRPL202306734
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
06/22/2023
|
|
:
Plumbing
:
Converting gang shower into children's restroom and converting mop closet into ADA restroom
|
|
PREHP202306732
|
Environmental Health Plan
|
Other
|
Finaled
|
06/21/2023
|
|
:
Environmental Health Plan
:
Coffee bar - project is 85% completed by Anderson Companies. DJ Kranz will be completing the project as per the original plans and specs submitted.
|
|
PRBD202306423
|
Building
|
Addition
|
Expired
|
06/28/2023
|
|
:
Building
:
Finishing the Bethany - Welcome Center started by Anderson Companies (went out of business). Project is 85 to 90% complete. Scope of Work consist of some interior finishes and some exterior finishes not finished. Also includes concrete sidewalk, patio and landscaping. Anderson's Original Building Permit number PRBD202112332
|
|
PRBD202306245
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
07/27/2023
|
|
:
Building
:
Remodel existing education space
add new bathrooms
demo existing walls
build-out some walls
|
|
PREL202215257
|
Electrical
|
Alteration/Repair/Replace
|
Closed
|
12/14/2022
|
|
:
Electrical
:
Small jobs. (Quarterly Maint.)
|
|
PREL202215074
|
Electrical
|
Alteration/Repair/Replace
|
Closed
|
12/08/2022
|
|
:
Electrical
:
Adding outlets for a key card system.
|
|
PREL202214760
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/06/2022
|
|
:
Electrical
:
Installing new fire alarm system to replace existing one.
|
|
PRAL202214758
|
Fire Alarm
|
Alteration/Repair/Replace
|
Expired
|
12/06/2022
|
|
:
Fire Alarm
:
Replacing existing fire alarm system with new Notifier System.
|
|
PREL202214116
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
11/09/2022
|
|
:
Electrical
:
re attach fixtures due to new siding (6845, 6841, 6837, 6833, 6829, 6825)
|
|
PRPL202213550
|
Plumbing
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Plumbing
:
Replaced Dishwasher
|
|
PRBD202209340
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
07/28/2022
|
|
:
Building
:
53 ft of interior drain tile, sump basket + sump pump. [Electrical permit may be required for sump pump]
|
|
PREL202206812
|
Electrical
|
Alteration/Repair/Replace
|
Closed
|
06/20/2022
|
|
:
Electrical
:
Replacing the fire alarm panel and a few devices for Bethany International Welcome Center
|
|
PRAL202206811
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
06/20/2022
|
|
:
Fire Alarm
:
Replacing the panel and devices for Bethany International Welcome Center.
|
|
PREL202206239
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/02/2022
|
|
:
Electrical
:
PO 91286 PROVIDE CABLING FOR HVAC CONTROL WIRING, OR THERMOSTAT WIRING/TEMPERATURE CONTROL WIRING.
TERMINATION BY ALLAN MECHANICAL.
|
|
PRMH202206011
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
05/31/2022
|
|
:
Mechanical
:
Gas fireplace installation, not adding gas line.
|
|
PRMH202205880
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
05/31/2022
|
|
:
Mechanical
:
gas piping for fireplace
|
|
PRUT202205765
|
Utility
|
New
|
Finaled
|
05/24/2022
|
|
:
Utility
:
Installation of new hydrant with wet tap and storm sewer
|
|
PRUT202204228
|
Utility
|
Alteration/Repair/Replace
|
Finaled
|
04/21/2022
|
|
:
Utility
:
Excavate and replace up to 30' of 4" sanitary sewer that has belly in it. Sewer located in the private sidewalk.
|
|
PRFS202202954
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
03/31/2022
|
|
:
Fire Suppression System
:
Extend existing wet pipe automatic fire sprinkler system into new Welcome Center Addition area. Total new sprinklers is 29 and the supply is from a new cut-in on an existing main at the lower level.
|
|
PRFS202201812
|
Fire Suppression System
|
Other
|
Finaled
|
03/01/2022
|
|
:
Fire Suppression System
:
Fire Sprinkler retrofit installation to un-sprinklered areas within the upper level of the existing building 4.
84 new sprinklers will be added, as required, to the existing wet pipe automatic fire sprinkler system.
|
|
PREL202201027
|
Electrical
|
Alteration/Repair/Replace
|
Closed
|
02/01/2022
|
|
:
Electrical
:
Small repairs.
|
|
PRFS202200717
|
Fire Suppression System
|
Other
|
Finaled
|
02/24/2022
|
|
:
Fire Suppression System
:
Fire sprinkler retrofit installation to all un-sprinklered areas within the existing building. 304 new sprinklers will be added, as required, to the existing automatic wet pipe automatic sprinkler system, on three levels.
|
|
PRTP202200529
|
Tank/Pipe Install/Removal
|
Other
|
Ready for Issuance
|
|
|
:
Tank
:
temp heat for construction site - not hooking up the tank, just setting it.
|
|
PRROWU202116266
|
ROW Underground
|
N/A
|
Finaled
|
02/09/2022
|
|
:
Right-of-Way
:
Comcast Job # JB0000866971 / 6820 Auto Club Rd.
Aerial & Underground fiber installation: Aerial = Overlashing fiber on to existing overhead pole attachments. Underground = Pulling fiber into existing conduit.
|
|
PREHP202116259
|
Environmental Health Plan
|
Alteration/Repair/Replace
|
Finaled
|
12/13/2021
|
|
:
Environmental Health Plan
:
Install new Coffee Bar in new building addition.
|
|
PREL202116123
|
Electrical
|
Alteration/Repair/Replace
|
Closed
|
12/10/2021
|
|
:
Electrical
:
Energize fire alarm panels.
|
|
PRMH202116019
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
12/07/2021
|
|
:
Mechanical
:
Gas piping.
|
|
PRMH202115930
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
12/06/2021
|
|
:
Mechanical
:
HVAC per plans. Gas piping is by others.
|
|
PRPL202115825
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
12/02/2021
|
|
:
Plumbing
:
Plumbing Remodel
|
|
PREL202113492
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
11/08/2021
|
|
:
Electrical
:
PO 37375 DISCONNECT/DEMO WIRING FOR CONSTRUCTION, PROVIDE TEMP POWER/LIGHTING, WIRE 1 JOB TRAILER. WALL PACKS, PHOTO CELL, 7 DAY POLE TIME CLOCK, FIXTURES, RECEPTACLES, EXIT/EMERGENCY SIGNS/LIGHTS.
|
|
PRBD202112332
|
Building
|
Addition
|
Closed
|
12/14/2021
|
|
:
Building
:
3,000 Sq Ft slab on grade Welcome Center Addition. Planned use includes welcome desk, open seating, and coffee service.
|
|
PREL202111959
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/10/2021
|
|
:
Electrical
:
Post lights in the volleyball court.
|
|
PRBD202111869
|
Building
|
Alteration/Repair/Replace
|
Closed
|
01/25/2022
|
|
:
Building
:
4336 sq ft of mel-rol exterior waterproofing rubber membrane, 542 ft of 8 inch line along building to tie all downspouts into, 500 ft run discharge (from sump pump) off 8 inch line where downspouts are tied into to parking lots and run to storm drain (center of building will tie into the storm), 542 ft excavate around both building down to footing (for Mel-Rol), 66 ft of interior drain tile
|
|
PREL202110085
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/12/2021
|
|
:
Electrical
:
Replacing the old fire alarm system with a new system in Finsaas Hall. Replacing the existing devices with new horn/strobes, smoke detectors, as well as adding some additional devices in certain spaces.
|
|
PRAL202110084
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
08/12/2021
|
|
:
Fire Alarm
:
Replacing the old fire alarm system with a new system in Finsaas Hall. Replacing the existing devices with new horn/strobes, smoke detectors, as well as adding some additional devices in certain spaces.
|
|
PREL202110082
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/12/2021
|
|
:
Electrical
:
Replacing the old fire alarm system with a new system. Replacing the existing devices with new horn/strobes, smoke detectors, as well as adding some additional devices in certain spaces.
|
|
PRAL202110081
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
08/12/2021
|
|
:
Fire Alarm
:
Replacing the old fire alarm system with a new system. Replacing the existing devices with new horn/strobes, smoke detectors, as well as adding some additional devices in certain spaces.
|
|
PREL202015498
|
Electrical
|
Alteration/Repair/Replace
|
In Plan Check
|
|
|
:
Electrical
:
Bethany College... replace four pole heads to LED. Located near the Basketball courts and Volleyball courts
|
|
PRCRF202012564
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
10/14/2020
|
|
:
Roofing
:
Remove the 2 layers of existing TPO membrane. Add 1" ISO insulation to achieve R31. Fully adhere .60 mil membrane over new insulation. Add 1 new downspout & 1 new overflow scupper. Install perimeter metal.
|
|
PREL202008468
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/11/2020
|
|
:
Electrical
:
PO 36704 DISCONNECT/DEMO, FURNISH & INSTALL 5 SINGLE POLE SWITCHES, 5 CEILING MOUNT LIGHT FIXTURES, 10 GEN DUTY DUPLEX RECEPTACLES, 5 120V SMOKE DETECTORS.
|
|
PRCRF202008212
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
08/10/2020
|
|
:
Roofing
:
Remove both layers of existing roof. Leave existing 4" of insulation. add 1" of ISO insulation. Add crickets of insulation in bottom corners and between drains to move water to scuppers. Install factory fabricated pipeboots and pitch pans around conduit. Install additional insulation around HVAC units and exhaust flues. Fully adhere .60 mil EPDM roofing system. Install new scuppers and perimeter metal.
|
|
PRBD202007750
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
07/27/2020
|
|
:
Building
:
Remove non-load bearing walls of closet space and provide new non-load bearing room separation wall. New flooring to match existing.
|
|
PRCRF202006109
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
06/16/2020
|
|
:
Roofing
:
Remove built-up roof and wet insulation. Replace wet insulation plus add 1.5" ISO and mechanically fasten to metal deck. Fully adhere .60 mil EPDM roof over insulation. Install new metal clad coping, scuppers, downspouts, flashings, and walkway pads. Change sleepers to floating sleepers. Extend plumbing vents to meet code.
|
|
PRPL202001860
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
03/02/2020
|
|
:
Plumbing
:
Rebuild 3/4" RPZ Wilkins 975XL Serial #1351247
|
|
PREL202001778
|
Electrical
|
Other
|
Closed
|
02/25/2020
|
|
:
Electrical
:
Quarterly Permit
|
|
PREL201915205
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/23/2019
|
|
:
Electrical
:
Add 1 outlet for TV
|
|
PREL201915203
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/23/2019
|
|
:
Electrical
:
Add 3 outlets for 2 TV's and 1 fireplace
|
|
PREL201914473
|
Electrical
|
Alteration/Repair/Replace
|
Closed
|
12/03/2019
|
|
:
Electrical
:
H-7240
Modify and reconnect 2- 7.5 ton RTUs per Steve S
|
|
PREL201912782
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/23/2019
|
|
:
Electrical
:
adding notification devices to an existing fire alarm system
|
|
PRAL201912778
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
11/15/2019
|
|
:
Fire Alarm
:
Add Notification devices to the existing fire alarm system.
|
|
PREL201909944
|
Electrical
|
Other
|
Closed
|
08/26/2019
|
|
:
Electrical
:
Quarterly Maintenance Permit.
Bethany Fellowship
|
|
PRMH201908807
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
08/05/2019
|
|
:
Mechanical
:
Remove Gas Piping for reroof of west side of press building and sym. Modify piping and reinstall. Plumbing Permit also pulled for this project.
|
|
PRPL201908800
|
Plumbing
|
Alteration/Repair/Replace
|
Closed
|
08/02/2019
|
|
:
Plumbing
:
Remove existing water heater and storage tank replace with storage type water heater.
|
|
PRPK201908768
|
Parking Lot
|
Other
|
Finaled
|
08/08/2019
|
|
:
Parking Lot
:
Mill and Overlay of 3 areas. 40,600 sqft total
|
|
PRCRF201908046
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
07/19/2019
|
|
:
Roofing
:
Remove the 3 layers of existing roofing. Add 2" of ISO insulation. Fully adhere .60 mil EPDM membrane over new insulation. Add new walkway pads around units & roof hatch. Install outer perimeter metal and new downspout.
|
|
PRCRF201908045
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
07/19/2019
|
|
:
Roofing
:
Remove existing roof membrane. Install ISO insulation to R-30. Install additional crickets between scuppers to move water from low spots. Fully adhere .60 mil EPDM roof membrane. Install outer perimeter metal and new scuppers & downspouts.
|
|
PRBD201906997
|
Building
|
Other
|
Closed
|
07/01/2019
|
|
:
Building
:
Window replacement (30)
|
|
PREL201813389
|
Electrical
|
Other
|
Closed
|
10/29/2018
|
|
:
Electrical
:
Quarterly Maintenance Permit
|
|
PRCRF201812693
|
Roof, Commercial
|
Repair/Replace
|
Expired
|
10/18/2018
|
|
:
Roofing
:
Remove existing roof membrane and insulation. Install ISO insulation to R-30. Install additional insulation around HVAC units and exhaust flues. Install a fully adhered .60 mil EPDM roofing system. Install outside perimeter metal.
|
|
PREL201810241
|
Electrical
|
Repair/Replace
|
Finaled
|
09/05/2018
|
|
:
Electrical
:
Add 18 new outlets. Bethany International College.
|
|
PRAL201807488
|
Fire Alarm
|
Alteration/Remodel
|
Finaled
|
07/26/2018
|
|
:
Fire Alarm
:
Adding notification devices to existing fire alarm panel.
|
|
PREL201807485
|
Electrical
|
Alteration/Remodel
|
Finaled
|
07/26/2018
|
|
:
Electrical
:
Adding notification devices to fire alarm system
|
|
PRBD201806653
|
Building
|
Repair/Replace
|
Expired
|
07/03/2018
|
|
:
Building
:
Repair/Replace whole 3rd Level due to Fire damage. No Structural changes. Mechanical and electrical work only in Unit 307.
|
|
PREL201806561
|
Electrical
|
Repair/Replace
|
Finaled
|
06/27/2018
|
|
:
Electrical
:
Rewire unit 307 - complete rewire - fire damage
Redo lighting in drop ceiling in units:
301,302,303,304,305,306,308,309,310
|
|
PRMH201806272
|
Mechanical/HVAC
|
Alteration/Remodel
|
Closed
|
06/21/2018
|
|
:
Mechanical
:
Install new bath fan vent. Panasonic FC-0510VS1.
|
|
PRPL201806271
|
Plumbing
|
Alteration/Remodel
|
Closed
|
06/21/2018
|
|
:
Plumbing
:
Installation of new full bath and kitchen plumbing fixtures with new waste and water line connection. Includes removal of kitchen fixtures and resetting to accommodate for the cabinet replacement.
|
|
PRMH201806270
|
Mechanical/HVAC
|
Alteration/Remodel
|
Finaled
|
06/21/2018
|
|
:
Mechanical
:
Hydronic heating work - install new slant fin baseboard for unit 307. Equipment BL20006, 1575E10 and Panasonic FV-0510VS1 (2). Match existing supply and return lengths. Install new closet cir fan.
|
|
PRPL201806269
|
Plumbing
|
Alteration/Remodel
|
Closed
|
06/21/2018
|
|
:
Plumbing
:
Install new bath and kitchen plumbing fixtures with new waste and water line connections. Locations per plan (no plan included with permit applications).
|
|
PREL201803871
|
Electrical
|
Repair/Replace
|
Finaled
|
04/30/2018
|
|
:
Electrical
:
Quarterly Maintenance
|
|
PRPL201801769
|
Plumbing
|
Repair/Replace
|
Closed
|
03/02/2018
|
|
:
Plumbing
:
Replace existing water heater, correct venting and combustion air. 100 gallon/390 mbh.
|
|
PREL201801666
|
Electrical
|
Alteration/Remodel
|
Closed
|
02/28/2018
|
|
:
Electrical
:
Wire new make up air & exhaust fan in kitchen.
|
|
PRPL201801608
|
Plumbing
|
Repair/Replace
|
Finaled
|
02/26/2018
|
|
:
Plumbing
:
New RPZ installation. Bethany Fellowship/Founders Hall. Boiler Room. RPZ#
Serial #4515388.
|
|
PRPL201801552
|
Plumbing
|
Repair/Replace
|
Finaled
|
02/26/2018
|
|
:
Plumbing
:
New installation RPZ. Boiler Room Make Up. Bethany Fellowship,Bethany Press. RPZ #
Serial # 4226177
|
|
PRDCFC201712011
|
Daycare/Foster Care
|
Other
|
Finaled
|
03/02/2018
|
|
:
Daycare/Foster Care
:
Family Child Care, Class A10
|
|
PRMH201711229
|
Mechanical/HVAC
|
Repair/Replace
|
Permit(s) Issued
|
09/07/2018
|
|
:
Mechanical
:
Replace existing kitchen make up air and exhaust system. Existing hood to remain.
Bethany International.
|
|
PRDCFC201708818
|
Daycare/Foster Care
|
Other
|
Finaled
|
09/22/2017
|
|
:
Daycare/Foster Care
:
Daycare by owner - Hand in Hand Christian Montesorri.
|
|
PRDK201707397
|
Deck
|
Repair/Replace
|
Finaled
|
08/10/2017
|
|
:
Building
:
Replace guard rails on 2 decks.
|
|
PREL201707079
|
Electrical
|
Other
|
Closed
|
08/02/2017
|
|
:
Electrical
:
Quarterly Maintenance. (add outlets for projectors and minor repairs.)
|
|
PREL201706343
|
Electrical
|
Repair/Replace
|
Finaled
|
07/19/2017
|
|
:
Electrical
:
Make connections to cubicles new location
|
|
PRCRF201701168
|
Roof, Commercial
|
Repair/Replace
|
Finaled
|
03/09/2017
|
|
:
Roofing
:
Remove existing roof membrane and insulation. Install ISO insulation to R-30. Install 2 additional scuppers. Install a fully adhered .60 mil black EPDM roofing system.Install outside perimeter metal.
|