PRBD202411963
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
09/25/2024
|
|
:
Building
:
Remove and Replace precast hollow core plank
|
PRFS202212920
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
10/17/2022
|
|
:
Fire Suppression System
:
Add and relocate 10 fire sprinklers to code for office build out.
|
PRCRF202211930
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
10/04/2022
|
|
:
Roofing
:
Re-roofing and Sheet metal.
|
PREL202210074
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/11/2022
|
|
:
Electrical
:
Remodel for tenant.
|
PRBD202208699
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
07/26/2022
|
|
:
Building
:
Interior tenant improvements at Seminar Room 110
|
PREL202202569
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/16/2022
|
|
:
Electrical
:
Tenant Improvement: Demo, Lighting, Power, Low Voltage,
|
PRFS202202268
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
03/23/2022
|
|
:
Fire Suppression System
:
Move 3 existing pendent sprinkler heads.
|
PRBD202202224
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
03/15/2022
|
|
:
Building
:
Tenant improvements
|
PREL202106575
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
06/02/2021
|
|
:
Electrical
:
Device Changeouts
|
PRMH202100717
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
02/01/2021
|
|
:
Mechanical
:
Furnish and install branch duct and diffusers for (3) new offices.
|
PREL202100618
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/21/2021
|
|
:
Electrical
:
JOB 21010345 TEACHERS ON CALL OFFICE ADDITIONS
ADD (2) RECEPTACLES, (3) LED 2X2 LIGHTS AND (3) WALL OCCUPANCY SENSORS
|
PRFS202100310
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
01/19/2021
|
|
:
Fire Suppression System
:
Install 3 heads to accommodate 3 new rooms.
|
PRBD202014837
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
01/04/2021
|
|
:
Building
:
Interior Renovation of 2 offices & one lactation room
|
PRMH202003794
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
04/24/2020
|
|
:
Mechanical
:
Add (1) VAV, duct and diffusers. Relocate duct and diffusers for new tenant space.
|
PREL202002875
|
Electrical
|
Alteration/Repair/Replace
|
Closed
|
03/25/2020
|
|
:
Electrical
:
Install (1) 120-volt receptacle for new display.
|
PRFS202001970
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
03/12/2020
|
|
:
Fire Suppression System
:
Modify existing fire sprinkler system to accommodate new ceiling layout in accordance with plans dated 11/27/19, NFPA standards, and the city of Bloomington requirements
|
PRMH202001509
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
02/19/2020
|
|
:
Mechanical
:
Modify existing duct and add duct as needed.
3rd, 4th, 5th floors - Public Spaces
|
PREL202000729
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/27/2020
|
|
:
Electrical
:
3rd,4th, & 5th floor Restroom & Corridor Remodel
Metro Office Park Job#159909
|
PRPL202000575
|
Plumbing
|
Alteration/Repair/Replace
|
Expired
|
01/22/2020
|
|
:
Plumbing
:
Disconnect, salvage and reinstall on 3rd floor 5 water closets, 2 urinals, 1 mop basin, 1 water cooler and 4 soap dispensers. Disconnect salvage and reinstall on 5th floor 6 water closets, 2 urinals, 7 soap dispensers. Relocate ADA stall rough-in only.
|
PREL202000302
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/21/2020
|
|
:
Electrical
:
Relocate existing thermostats for 5 phase project.
|
PREL202000254
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/13/2020
|
|
:
Electrical
:
Metro Office Park 3001 3rd floor fire alarm system remodel-10978
|
PRAL202000253
|
Fire Alarm
|
Alteration/Repair/Replace
|
Expired
|
01/13/2020
|
|
:
Fire Alarm
:
Metro office park 3001 3 floor fire alarm system remodel/10978
|
PRMH201915200
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
12/26/2019
|
|
:
Mechanical
:
Reconfigure duct and diffusers as required for new tenant layout.
Install new diffusers and eggcrate where needed. Install new transfer fan for IT/Server room.
|
PRFS201915081
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
12/20/2019
|
|
:
Fire Suppression System
:
Add relocate per new walls
|
PREL201914667
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/11/2019
|
|
:
Electrical
:
MISCELLANEOUS REMODEL OF THE 5th FLOOR LIGHTING,RECEPTACLES,& FURNITURE
|
PREL201914665
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
12/11/2019
|
|
:
Electrical
:
MISCELLANEOUS REMODEL OF THE 4th FLOOR LIGHTING,RECEPTACLES,& FURNITURE
|
PREL201914661
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/11/2019
|
|
:
Electrical
:
MISCELLANEOUS REMODEL OF THE 3rd FLOOR LIGHTING,RECEPTACLES,& FURNITURE
|
PRPL201914597
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
12/06/2019
|
|
:
Plumbing
:
Rough-in and install 2 break sink, 1 dishwasher and 1 6 gallon water heater
|
PRBD201914478
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
01/30/2020
|
|
:
Building
:
3001 Metro Office Park Public Space Renovations - Toilet rooms on 3rd and 5th floors will be renovated and a new corridor will be constructed on 4th floor in conjunction with another tenant improvement project. This new corridor will subdivide a single tenant space into two and potentially more tenant suites. Work includes demolition, framing, and finishes with MEP being delivered on a design build basis.
|
PRDE201914356
|
Demolition
|
Other
|
Expired
|
12/02/2019
|
|
:
Demolition
:
Demolition of existing finishes, offices and conf rooms. Demolition will occur on the 3rd, 4th and 5th floors
|
PRBD201912792
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
12/10/2019
|
|
:
Building
:
Tenant Improvements on floors 3, 4, and 5 at 3001 Metro Blvd. for Wilson McShane
|
PREL201910628
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/10/2019
|
|
:
Electrical
:
Elevator upgrade
|
PREL201906268
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/17/2019
|
|
:
Electrical
:
Electrical renovation in suite 260. replacing (18) fixtures
|
PRBD201905525
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
06/07/2019
|
|
:
Building
:
Demolish some portions of existing non-support sheetrock walls and doors; Construct sections of new sheetrock wall and install doors; Replace ceiling tiles where needed.
|
PRBD201903196
|
Building
|
Other
|
Finaled
|
04/18/2019
|
|
:
Building
:
Install sun shade canopies over existing patios
|
PREL201900353
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/14/2019
|
|
:
Electrical
:
Install two switches and four receptacles in suite 280 at Fairway Independent Mortgage.
|
PRPL201900308
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
01/11/2019
|
|
:
Plumbing
:
REPLACE BREAK SINK
|
PRBD201815403
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
01/03/2019
|
|
:
Building
:
Tenant Improvements
|
PRMH201814030
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
11/16/2018
|
|
:
Mechanical
:
Install three return transfers at three offices with walls extended to deck.
|
PRPL201813745
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
11/01/2018
|
|
:
Plumbing
:
Rough-in and install (1) sink and (1) point of use water heater.
|
PRFS201813325
|
Fire Suppression System
|
Other
|
Finaled
|
10/25/2018
|
|
:
Fire Suppression System
:
Add 3 and relocate 2 sprinkler heads for new wall lay out. (Clerestory Advisors)
|
PREL201811571
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/28/2018
|
|
:
Electrical
:
Small office remodel.
|
PRBD201810905
|
Building
|
Alteration/Remodel
|
Finaled
|
09/26/2018
|
|
:
Building
:
Tenant TI
|
PREL201805636
|
Electrical
|
Repair/Replace
|
Finaled
|
08/03/2018
|
|
:
Electrical
:
Remove existing parking garage fixtures and install new fixtures.
|
PRMH201710441
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
10/31/2017
|
|
:
Mechanical
:
Relocate existing grills and /or diffusers in restroom renovtion and replace grilles/diffusers with new. Metro Office Park, suite 112.
|
PREL201710332
|
Electrical
|
Alteration/Remodel
|
Finaled
|
10/26/2017
|
|
:
Electrical
:
(PO 35198) Furnish & install (4) fixtures, (1) dimmer, (3) receptacles. Disconnect wiring for construction.
|
PREL201708762
|
Electrical
|
Alteration/Remodel
|
Finaled
|
09/18/2017
|
|
:
Electrical
:
Demo, relocate project power, relocate lights.
|
PRBD201708512
|
Building
|
Alteration/Remodel
|
Finaled
|
10/20/2017
|
|
:
Building
:
Interior remodel of breakroom into conference room
|
PRBD201708237
|
Building
|
Alteration/Remodel
|
Finaled
|
09/25/2017
|
|
:
Building
:
Interior remodel of existing space.
|
PREL201708139
|
Electrical
|
Repair/Replace
|
Permit(s) Issued
|
09/05/2017
|
|
:
Electrical
:
Replace and add rooftop units
|
PRMH201708135
|
Mechanical/HVAC
|
Repair/Replace
|
Permit(s) Issued
|
09/05/2017
|
|
:
Mechanical
:
Direct replacement of (5) existing rooftop units with DX Cooling. Replace existing gas piping and demo existing boilers and chiller.
|
PRBD201707693
|
Building
|
Alteration/Remodel
|
Finaled
|
08/18/2017
|
|
:
Building
:
Replace mechanical vision screen (structural components will remain in place)
|
PRFS201707093
|
Fire Suppression System
|
Alteration/Remodel
|
Finaled
|
08/08/2017
|
|
:
Fire Suppression System
:
Raise existing pendent heads as needed for adjusted ceiling.
|
PREL201706609
|
Electrical
|
Repair/Replace
|
Finaled
|
07/26/2017
|
|
:
Electrical
:
Replace light with LED lighting compliance to follow. Waiting on fixture approval.
|
PRBD201706450
|
Building
|
Alteration/Remodel
|
Finaled
|
07/24/2017
|
|
:
Building
:
Remodel to remove interior wall and open corridor wall and install new non-rated door ( Spec Suite )
|
PRFS201703243
|
Fire Suppression System
|
Alteration/Remodel
|
Finaled
|
05/09/2017
|
|
:
Fire Suppression System
:
Install FM-200 Fire Suppression System in I.T. Room.
|
PREL201701355
|
Electrical
|
Repair/Replace
|
Finaled
|
03/14/2017
|
|
:
Electrical
:
Electrical panel replacement. AMPS not provided.
|