PRGR202505097
|
Grading
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
05/13/2025
|
|
:
Grading
:
Grading and Earthwork to Kennedy Stadium
|
PRMH202503712
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
04/15/2025
|
|
:
Mechanical
:
heater, ductwork, GRD's, exhaust fan, intake hood
|
PRMH202503711
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
04/14/2025
|
|
:
Mechanical
:
heater, ductwork, GRD's, exhaust fan, intake hood
|
PRPL202503650
|
Plumbing
|
Other
|
Permit(s) Issued
|
04/18/2025
|
|
:
Plumbing
:
New plumbing for concession stand.
|
PRUT202503595
|
Utility
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
05/13/2025
|
|
:
Utility
:
New water and sanitary services.
New Storm pipe and system.
|
PRROWU202503492
|
ROW Underground
|
N/A
|
Ready for Issuance
|
|
|
:
Right-of-Way
:
2 pole replacements for deteriorating poles/equipment
|
PREL202503041
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
04/11/2025
|
|
:
Electrical
:
Updating track power and lighting, and wire concession building
|
PREHP202500536
|
Environmental Health Plan
|
Other
|
Permit(s) Issued
|
05/16/2025
|
|
:
Environmental Health Plan
:
This work is part of the overall Kennedy High School Stadium Improvements. This work will consist of building a new concession stand
|
PRBD202500303
|
Building
|
New
|
Permit(s) Issued
|
05/19/2025
|
|
:
Building
:
The work that will be completed at Kennedy High School stadium consists of the demo and replacement of some fences, a new entry gate to the stadium, building a concessions stand and entry plaza, new accessible sidewalks, replace existing bleachers with new bleachers and a press box. The field work will consist of replacement of the old synthetic turf with new and new lights and a sound system.
|
PREL202416193
|
Electrical
|
Other
|
Permit(s) Issued
|
12/12/2024
|
|
:
Electrical
:
Flashing beacon system
|
PRROWU202416090
|
ROW Underground
|
N/A
|
Permit(s) Issued
|
04/22/2025
|
|
:
Right-of-Way
:
Replace existing deteriorated power pole & equipment with new.
|
PRBD202405368
|
Building
|
Alteration/Repair/Replace
|
Expired
|
05/29/2024
|
|
:
Building
:
Kennedy High School Metal Panel Replacement
Replacement of metal panels at front of school
|
PRROWU202314430
|
ROW Underground
|
N/A
|
Warranty
|
03/08/2024
|
|
:
Right-of-Way
:
Underground installation of fiber optic cable in duct by directional bore
|
PRTS202312783
|
Sign, Temporary
|
Other
|
Finaled
|
10/24/2023
|
|
:
Sign
:
On-site and off-site signs advertising a craft & vendor fair November 18 at John F. Kennedy high school.
|
PREL202311926
|
Electrical
|
Other
|
Finaled
|
10/04/2023
|
|
:
Electrical
:
Install a 492.82 kWDC / 360 kWAC rooftop ballasted solar array.
|
PRBD202311920
|
Building
|
Other
|
Finaled
|
10/06/2023
|
|
:
Building
:
Install a 492.82 kWDC / 360 kWAC rooftop ballasted solar array
|
PREL202310107
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/25/2023
|
|
:
Electrical
:
Simplex FA / Addition to Fire Alarm / (2) relay modules [Fire alarm permit also required]
|
PRAL202310106
|
Fire Alarm
|
Alteration/Repair/Replace
|
Expired
|
08/30/2023
|
|
:
Fire Alarm
:
Simplex FA / Addition to Fire Alarm / (2) relay modules
|
PRPL202308636
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
08/01/2023
|
|
:
Plumbing
:
Sink replacements in art and science rooms
|
PREL202308254
|
Electrical
|
Other
|
Expired
|
07/21/2023
|
|
:
Electrical
:
Install a junction box and disconnect to prepare for a future solar array. Xcel is shutting down power and we are taking advantage of that shutdown for a future project.
|
PRFS202306014
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Expired
|
06/20/2023
|
|
:
Fire Suppression System
:
Replace up to 400 recalled sprinkler heads throughout the building
|
PRCRF202302417
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
04/03/2023
|
|
:
Roofing
:
60 sqs built-up reroof, new insulations to code R30
|
PREL202301620
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/22/2023
|
|
:
Electrical
:
Install shunt trip coil for relay feeder for roof top PV system.
|
PREL202300808
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/31/2023
|
|
:
Electrical
:
Replace receptacles and add 2 electrical sub panels.
|
PRBD202300584
|
Building
|
Alteration/Repair/Replace
|
Expired
|
05/30/2023
|
|
:
Building
:
Architectural remodel of Kennedy HS science and art rooms. Work includes new flooring paint, tile and casework
|
PREL202210417
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
08/19/2022
|
|
:
Electrical
:
Add (1) new circuit for gym curtain.
|
PREL202208136
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
07/12/2022
|
|
:
Electrical
:
Replacing concrete base for two light poles.
|
PRPL202204443
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
04/26/2022
|
|
:
Plumbing
:
Rebuilt existing RPZ valve that had been recently found.
RPC had never tested this valve before. No RPZ ID # yet.
Watts 919-QT, 3/4", S/N 60956. Located in the Chiller Room serves the boiler fill.
Julie S is aware of this new found RPZ.
I will email our test report to Julie S.
|
PREL202202888
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
03/25/2022
|
|
:
Electrical
:
changing out the existing power distribution panel for the cellular equipment on top of the school. Ampacity is remaining the same, just updating the equipment
|
PREL202115784
|
Electrical
|
Other
|
Expired
|
12/03/2021
|
|
:
Electrical
:
Yearly Annual Maintenance
|
PREL202103426
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
04/01/2021
|
|
:
Electrical
:
Change out 277/480V panel in boiler room; one for one swap
|
PRBD202101844
|
Building
|
Alteration/Repair/Replace
|
Issued
|
03/02/2021
|
|
:
Building
:
Swapping out existing equipment for like equipment - antennas, radio cabinets, and associated cabling.
|
PRROWA202015443
|
ROW Aerials
|
N/A
|
Finaled
|
01/07/2021
|
|
:
Right-of-Way
:
install pole and light per city request
|
PREL202014627
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
11/30/2020
|
|
:
Electrical
:
Move 200a panel and circuits to new location. Add (2) 60A freezer drop cord.
|
PREL202013339
|
Electrical
|
Other
|
Finaled
|
10/28/2020
|
|
:
Electrical
:
Maintenance of School Building by District Electricians.
|
PREL202010290
|
Electrical
|
Other
|
Finaled
|
09/14/2020
|
|
:
Electrical
:
Install a 224 kWDC / 166.6 kWAC ballasted rooftop solar array
|
PRTC202009350
|
Tent/Canopy
|
Other
|
Finaled
|
08/21/2020
|
|
:
Tent/Canopy
:
We are requesting a permit for 6 - 20x20 tents that will be used by City of Bloomington for COVID19 drive thru testing. No cooking or smoking underneath. Install August 31st. Use September 1st and tear down September 2nd.
|
PRAL202008756
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
08/17/2020
|
|
:
Fire Alarm
:
One for one device swap to remedy device sync. issues.
|
PREL202008755
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/24/2020
|
|
:
Electrical
:
One for one device swap to remedy device synch. issues.
|
PRBD202008235
|
Building
|
Other
|
Expired
|
08/06/2020
|
|
:
Building
:
Install a 224 kWDC ballasted rooftop solar array
|
PRROWU202001040
|
ROW Underground
|
N/A
|
Finaled
|
03/03/2020
|
|
:
Right-of-Way
:
20-T045 Construction of underground fiber via directional bore, on existing poles and in existing duct along 102nd St, Wentworth Ave, w 98th St
|
PREL201913745
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
11/13/2019
|
|
:
Electrical
:
Add (2) receptacles in class rooms C109, C120
|
PREL201907396
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
07/08/2019
|
|
:
Electrical
:
Adding (2) lights in elevator pit,
(1) light in mechanical room
|
PREL201906874
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/28/2019
|
|
:
Electrical
:
Change 500W incandescent lights in auditorium to LED.
|
PREL201906292
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/28/2019
|
|
:
Electrical
:
Fire Alarm Replacement
|
PRAL201906199
|
Fire Alarm
|
Alteration/Repair/Replace
|
Expired
|
06/12/2019
|
|
:
Fire Alarm
:
Move/Add/Change /Delete current Edwards FA system with full site Simplex FA system.
|
PREL201903922
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
05/01/2019
|
|
:
Electrical
:
Yearly annual maintenance.
|
PREL201902575
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/26/2019
|
|
:
Electrical
:
Relocate ATS (8 feet) for accessibility. Add new 110 amp 480 voltage 3 P. Panelboard from existing location, not accessible.
Kennedy HS
|
PRPL201901750
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
03/04/2019
|
|
:
Plumbing
:
REBUILD RPZ
|
PRPS201814329
|
Sign, Permanent
|
Replacement Sign
|
Finaled
|
11/20/2018
|
|
:
Sign
:
New Kennedy High School banners hanging from light poles around school sidewalk.
|
PRFS201808593
|
Fire Suppression System
|
Alteration/Remodel
|
Expired
|
08/09/2018
|
|
:
Fire Suppression System
:
One for one relocation of existing sprinklers for new ceilings at Kennedy High School. Modification of existing sprinkler pipe to accommodate new mechanical systems. Addition of new upright sprinklers in Cafeteria space to protect above new cloud ceiling system.
|
PRPL201806997
|
Plumbing
|
Repair/Replace
|
Finaled
|
07/06/2018
|
|
:
Plumbing
:
Plumbing remodel for Bloomington Public Schools (Kennedy High School) through general contractor, Kraus Anderson.
|
PREL201806976
|
Electrical
|
Repair/Replace
|
Finaled
|
07/09/2018
|
|
:
Electrical
:
Classroom and hallways lighting retrofit. Job #2555C
|
PREL201805877
|
Electrical
|
Alteration/Remodel
|
Finaled
|
06/13/2018
|
|
:
Electrical
:
Electrical controls installation.
|
PREL201804411
|
Electrical
|
Repair/Replace
|
Finaled
|
05/15/2018
|
|
:
Electrical
:
Addition to existing fire alarm system.
|
PRAL201804395
|
Fire Alarm
|
Other
|
Finaled
|
05/15/2018
|
|
:
Fire Alarm
:
Addition to existing fire alarm system. Kennedy High School
|
PRCRF201804391
|
Roof, Commercial
|
Repair/Replace
|
Expired
|
05/22/2018
|
|
:
Roofing
:
Demo gravel, membrane, sheet metal. Install new built up roofing system, hot tar and gravel surface, rough carpentry, new sheet metal flashings.
|
PRBD201803916
|
Building
|
Alteration/Remodel
|
Finaled
|
05/17/2018
|
|
:
Building
:
Masonry wall rebuilding and through wall flashing.
|
PRMH201803503
|
Mechanical/HVAC
|
Repair/Replace
|
Expired
|
05/08/2018
|
|
:
Mechanical
:
install new chilled water pipe, hot water pipe 2 condensing boilers, 2 RTU, stearm to converter, and duct work.
|
PREL201803060
|
Electrical
|
Repair/Replace
|
Finaled
|
05/11/2018
|
|
:
Electrical
:
Kennedy High School Electrical construction
|
PRBD201802295
|
Building
|
Alteration/Remodel
|
Finaled
|
05/23/2018
|
|
:
Building
:
Kennedy High School interior and mechanical improvements
|
PREL201801471
|
Electrical
|
Repair/Replace
|
Finaled
|
03/14/2018
|
|
:
Electrical
:
Maintenance
|
PREL201710436
|
Electrical
|
Repair/Replace
|
Finaled
|
11/03/2017
|
|
:
Electrical
:
Change exterior lighting.
|
PREL201707927
|
Electrical
|
Alteration/Remodel
|
Expired
|
08/29/2017
|
|
:
Electrical
:
Change out exterior fixtures to LED
|
PREL201707600
|
Electrical
|
Alteration/Remodel
|
Expired
|
08/16/2017
|
|
:
Electrical
:
Connect HVAC to occupancy sensors 3rd fl
|
PRAL201707269
|
Fire Alarm
|
Other
|
Finaled
|
08/21/2017
|
|
:
Fire Alarm
:
Remove and re-install horns/strobes for remodel.
|
PREL201707262
|
Electrical
|
Alteration/Remodel
|
Finaled
|
08/21/2017
|
|
:
Electrical
:
Remove and re-install fire alarm horn/stobes for remodel project. New devices will be on ceiling.
|
PREL201705764
|
Electrical
|
Repair/Replace
|
Finaled
|
07/05/2017
|
|
:
Electrical
:
Replace 3 transformers
|
PREL201704903
|
Electrical
|
Alteration/Remodel
|
Finaled
|
06/14/2017
|
|
:
Electrical
:
Interior Remodel.
|
PRDE201704812
|
Demolition
|
Alteration/Remodel
|
Finaled
|
06/09/2017
|
|
:
Demolition
:
Interior renovation to classrooms.
|
PRFS201704779
|
Fire Suppression System
|
Alteration/Remodel
|
Finaled
|
06/12/2017
|
|
:
Fire Suppression System
:
Add/relocate sprinkler heads to conform with new walls and ceilings.
|
PRBD201704189
|
Building
|
Alteration/Remodel
|
Finaled
|
06/16/2017
|
|
:
Building
:
Secondary School Renovations (Kennedy High School - Phase 1 Only) per plan and specs.
|
PREL201700215
|
Electrical
|
Repair/Replace
|
Finaled
|
10/17/2017
|
|
:
Electrical
:
Maintenance annual permit.
|