PREL202512039
|
Electrical
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Electrical
:
New temperature controls
|
|
PREL202511034
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
09/09/2025
|
|
:
Electrical
:
Bloomington Ice Garden is replacing their existing fire alarm system with a brand new system.
|
|
PREL202510178
|
Electrical
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Electrical
:
Medina Low Voltage performing low voltage wiring, which includes fire alarm, security camera, access control and others.
|
|
PRBD202510149
|
Building
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
08/20/2025
|
|
:
Building
:
Demolition and disposal of the existing stucco wall and soffit finishes; the face of the old stucco wall and soffit will be replaced with pre-finished metal wall panels. The existing light fixtures will be replaced with new fixtures (no new electrical circuits or wiring will be required to change out the lights).
|
|
PRAL202509800
|
Fire Alarm
|
Other
|
Permit(s) Issued
|
08/12/2025
|
|
:
Fire Alarm
:
Installing ERRC System on 1st floor 183-1, commission system, and test system.
File FCC Report and coordinate install with Hennepin County.
|
|
PREL202509787
|
Electrical
|
Other
|
Finaled
|
08/18/2025
|
|
:
Electrical
:
Run fire wire from ERRC System to Fire Panel.
*Fire panel technician to connect and program Fire Panel.
|
|
PRFS202509705
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
08/12/2025
|
|
:
Fire Suppression System
:
Installation of one Ansul Piranha fire suppression system into one new kitchen hood.
|
|
PRAL202509064
|
Fire Alarm
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
08/19/2025
|
|
:
Fire Alarm
:
The Bloomington Ice Garden is replacing their existing fire alarm system with a brand new System.
|
|
PREL202507275
|
Electrical
|
Other
|
Finaled
|
06/30/2025
|
|
:
Electrical
:
Low voltage building automation control wiring.
Extended permit 180 days for inspection. [jsmidt @ 01/08/2026 2:37 PM]
|
|
PREL202507234
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/14/2025
|
|
:
Electrical
:
Ice Rink repairs & upgrades
Wire Associated equipment
|
|
PRUT202506150
|
Utility
|
New
|
Finaled
|
06/23/2025
|
|
:
Utility
:
New water meter for Bloomington Ice Garden Facilities. 4" Domestic Water Main. Meter only permit. Fee has been adjusted to reflect the cost of a 4" Cordonel Meter. METER S/N 101149878 READ 100GAL
|
|
PRROWU202504922
|
ROW Underground
|
N/A
|
Warranty
|
05/13/2025
|
|
:
Right-of-Way
:
Pulling Fiber through an existing City owned Duct for the City of Bloomington.
|
|
PRPK202504779
|
Parking Lot
|
Alteration/Repair/Replace
|
Expired
|
06/30/2025
|
|
:
Parking Lot
:
Reclaim parking lot, repave, stripe parking lot
|
|
PRFS202503748
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Expired
|
06/10/2025
|
|
:
Fire Suppression System
:
Replace existing valve assembly in riser room. Replace all sprinkler heads above ice rinks with like heads. Add/relocate sprinkler heads for new ceilings and walls. Provide sprinkler coverage under new bleachers.
|
|
PRUT202503643
|
Utility
|
Alteration/Repair/Replace
|
Finaled
|
07/11/2025
|
|
:
Utility
:
New water service.
New sanitary service and lift station changes.
New storm service.
New storm sewer.
|
|
PREHP202503290
|
Environmental Health Plan
|
Alteration/Repair/Replace
|
Finaled
|
|
|
:
Environmental Health Plan
:
New Concession area
|
|
PREL202502813
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/21/2025
|
|
:
Electrical
:
WIRING NEW SIGN FOR BLOOMINGTON ICE GARDEN
|
|
PRMH202502441
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
04/02/2025
|
|
:
Mechanical
:
HVAC, Ductwork,VAV's RTU, Exhaust fans ,Radiant heaters
|
|
PRBD202502331
|
Building
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
04/30/2025
|
|
:
Building
:
Phase 2: Interior remodel of existing Ice Garden's facility.
** Rink 3 foundation work submitted under separate permit.
|
|
PRFD202502320
|
Foundation
|
|
Expired
|
03/11/2025
|
|
:
Foundation
:
Bloomington Bid Package #2 - Footings and Foundation for Rink 3.
|
|
PRPL202502049
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
03/25/2025
|
|
:
Plumbing
:
Plumbing remodel of existing facilities per plans
|
|
PREL202501516
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
02/24/2025
|
|
:
Electrical
:
Remodel lighting and switchgear.
|
|
PRBD202501211
|
Building
|
Alteration/Repair/Replace
|
Expired
|
02/11/2025
|
|
:
Building
:
Removal of 3 existing ice rink concrete floors only. No structure Demolition
|
|
PRFS202500254
|
Fire Suppression System
|
Other
|
Issued
|
02/05/2025
|
|
:
Fire Suppression System
:
Modify sprinkler system to conform to new arch walls and ceilings per NFPA 13 (2016).
|
|
PRMH202500232
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
03/12/2025
|
|
:
Mechanical
:
3-Floor and Refrigeration System
|
|
PRPS202415965
|
Sign, Permanent
|
Replacement Sign
|
Expired
|
03/21/2025
|
|
:
Sign
:
Electrical permit required PREL202502813
REMOVE EXISTING MONUMENT AND REPLACE WITH NEW UPDATED MONUMENT SIGN - SAME LOCATION
|
|
PREL202414821
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
11/27/2024
|
|
:
Electrical
:
***Permit extended 180 days as of 6/26/25***
JOB 820362 BLOOMINGTON ICE GARDEN BID PACK 1 - DEMO EXISTING ZAMBONI ROOM TO BE EXPANDED INTO NEW CHILLER PLANT. INSTALL NEW LIGHTING IN REMODELED AREAS. PROCUREMENT OF SWITCHGEAR TO BE INSTALLED IN LATER BID PACK
|
|
PRPL202414296
|
Plumbing
|
Alteration/Repair/Replace
|
Expired
|
10/31/2024
|
|
:
Plumbing
:
Plumbing items as below
10 New Floor Drains
2 New Roof Drains
1 new trench drain
1 new RPZ
1 Emergency shower with eye wash
|
|
PRMH202414236
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
11/04/2024
|
|
:
Mechanical
:
CC2429 Bloomington Ice Garden
Install louvers and dampers, new fans and 2 unit heaters with gas piping and associated ductwork
|
|
PRBD202410161
|
Building
|
Addition
|
Issued
|
06/12/2025
|
|
:
Building
:
Bid Package #1 - Demolition of existing Zamboni access / maintenance area to prep for the expansion of the existing facility to accommodate the expanded refrigeration room / zamboni access / ice melt pit.
Bid package #2 information will be submitted on a separate date. This bid package #2 will include the exterior site improvements, utilities, landscaping, parking lot work. In addition, this will include the existing ice rink remodel work.
|
|
PREL202403348
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
03/22/2024
|
|
:
Electrical
:
Connect temporary chiller on trailer to existing electrical disconnect in Refrigeration Room for Rink 1.
600A 3PH 480V connection to existing breaker in room.
|
|
PRMH202403118
|
Mechanical/HVAC
|
Other
|
Expired
|
03/18/2024
|
|
:
Mechanical
:
Chiller Rental
|
|
PRPL202311798
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
09/27/2023
|
|
:
Plumbing
:
RPZ-0079 FAILED ANNUAL TEST. REPAIR/REBUILD. TEST REPORT WILL BE EMAILED TO
JULIE S IN UTILITIES.
|
|
PRROWU202304538
|
ROW Underground
|
N/A
|
Warranty
|
07/12/2023
|
|
:
Right-of-Way
:
SAP# 106044559 / MGC# 23-70449
Excavation of eight 10"-diameter drill holes, 7 in the boulevard of 98th St. W. and 1 in the boulevard of Washburn Ave. S.
Field Contact: CenterPoint Energy Technician Dan PETERS (612) 581 - 9720
Contractor: NPL Field Technician Ron Eason (612) 363 - 9698
|
|
PRROWU202304166
|
ROW Underground
|
N/A
|
Warranty
|
05/08/2023
|
|
:
Right-of-Way
:
SAP# 106317475 / MGC# 23-70344
Excavation of 2 holes in the W. 98th St. ROW near 3600 W. 98th St., one in the boulevard on the south side of the road, and one in the northern west-bound lane.
Field Contact: CenterPoint Energy Foreperson Ron LINDSTROM (612) 366 - 5968
|
|
PRBU202214976
|
Burning
|
Other
|
Finaled
|
12/09/2022
|
|
:
Burning
:
We will be burning buckthorn piles behind B.I.G.
|
|
PRPL202006626
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
06/24/2020
|
|
:
Plumbing
:
Replaced RPZ-0079. Decommissioned RPZ Watts 009, .1/2",
s/n 136859.
Installed new RPZ Wilkens 975XL, .1/2", s/n W436086.
All RPZ Reports will be sent to Eric Schoon.
|
|
PRROWU202002178
|
ROW Underground
|
N/A
|
Finaled
|
04/17/2020
|
|
:
Right-of-Way
:
Bore in 65' of 4/0 AL UG Triplex Cable from P1 to P2 as shown on the attached design layout to repair an existing faulted electric service
|
|
PRMH202000324
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
01/31/2020
|
|
:
Mechanical
:
Install the gas piping for the new generator
|
|
PRPL201914882
|
Plumbing
|
Other
|
Finaled
|
12/12/2019
|
|
:
Plumbing
:
Supply and install 2 new RPZ valves at the Blm Ice Garden.
1 RPZ valve installed in Rink #1.
1 RPZ valve installed in Rink #3.
I have emailed the completed RPZ Test Reports to Julie S.
Dec12, 2019.
|
|
PREL201912891
|
Electrical
|
Alteration/Repair/Replace
|
Closed
|
11/08/2019
|
|
:
Electrical
:
LED Lighting Upgrade plus installation of a new 25 kW Gas generator
|
|
PRPL201912721
|
Plumbing
|
Other
|
Expired
|
10/24/2019
|
|
:
Plumbing
:
Install a water cooler. Install 2 new RPZ valves.
|
|
PRFS201908867
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
08/19/2019
|
|
:
Fire Suppression System
:
Add / Re-locate per building renovations.
|
|
PREL201907689
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/14/2019
|
|
:
Electrical
:
Remodel Locker Rooms at Bloomington Ice Garden Facility.
New Lighting in new lobby.
|
|
PRMH201905557
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
05/31/2019
|
|
:
Mechanical
:
HVAC Remodel for locker rooms. HVAC addition for lobby.
|
|
PRDE201905150
|
Demolition
|
Other
|
Finaled
|
05/23/2019
|
|
:
Demolition
:
Demolition for the Bloomington Ice Garden Project. We will begin selective, mechanical, and electrical demolition in the locker room spaces.
|
|
PRPL201904084
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
05/15/2019
|
|
:
Plumbing
:
New waste, vent and water piping for new plumbing fixtures.
|
|
PRMH201903876
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
05/06/2019
|
|
:
Mechanical
:
Replacement of evaporative condenser
|
|
PRBD201903535
|
Building
|
Alteration/Repair/Replace
|
Expired
|
06/12/2019
|
|
:
Building
:
Remodel of existing locker rooms, adding ADA ramps, remodel/addition of front vestibule at Bloomington Ice Garden
|
|
PRPL201709524
|
Plumbing
|
Repair/Replace
|
Finaled
|
10/06/2017
|
|
:
Plumbing
:
Rebuilt RPZ. Serial #136859. Located in the Boiler Room.
|