PREL202500657
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
02/04/2025
|
|
:
Electrical
:
Install new fire alarm system: 1 FACP, 1 NAC panel, 1 pull station, 7 smoke detectors, 69 horn strobes, 2 input modules
|
PRAL202500655
|
Fire Alarm
|
Other
|
Permit(s) Issued
|
02/04/2025
|
|
:
Fire Alarm
:
Install new fire alarm system: 1 FACP, 1 NAC panel, 1 pull station, 7 smoke detectors, 69 horn strobes, 2 input modules
|
PRMH202415492
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
11/22/2024
|
|
:
Mechanical
:
Provide temp heat piping for general contractor. Hooking up LP to GC provided heaters.
|
PRTP202415423
|
Tank/Pipe Install/Removal
|
Other
|
Permit(s) Issued
|
11/26/2024
|
|
:
Tank
:
SETTING 3/1000GT FOR TEMP HEAT
|
PRFS202411407
|
Fire Suppression System
|
Other
|
Expired
|
09/18/2024
|
|
:
Fire Suppression System
:
Install dry standpipe system in new parking structure with hose connections at each level of parking along risers.
|
PRROWU202411393
|
ROW Underground
|
N/A
|
Ready for Issuance
|
|
|
:
Right-of-Way
:
New storm sewer tie in to city cb.
|
PREL202407878
|
Electrical
|
Other
|
Permit(s) Issued
|
07/05/2024
|
|
:
Electrical
:
TENANT FINISH OF SICK INC PARKING RAMP
|
PRMH202406719
|
Mechanical/HVAC
|
Other
|
Expired
|
06/20/2024
|
|
:
Mechanical
:
Provide and install mechanical equipment for new parking ramp per plan and spec
|
PRPL202406718
|
Plumbing
|
Other
|
Expired
|
06/03/2024
|
|
:
Plumbing
:
Plumbing for a new parking ramp
|
PRUT202406361
|
Utility
|
New
|
Permit(s) Issued
|
05/30/2024
|
|
:
Utility
:
New sanitary, watermain and storm sewer work for SICK PH 2/City of Bloomington Parking ramp.
|
PREL202405092
|
Electrical
|
Other
|
Expired
|
04/24/2024
|
|
:
Electrical
:
TEMPORARY POWER FOR SICK, INC. PHASE 2 PARKING RAMP
|
PRFD202405011
|
Foundation
|
Other
|
Permit(s) Issued
|
04/29/2024
|
|
:
Foundation
:
Bloomington Parking Structure is new construction of a 185,000 sq.ft., 6-story parking structure, with capacity for 555 parking spaces for employees and visitors in support of SICK Inc’s continued development at their new Bloomington Campus, located on the north-west corner of the intersection of Lindau Lane and 28th Street. Full permit is under PRBD202402359
|
PRBD202402359
|
Building
|
New
|
Permit(s) Issued
|
05/13/2024
|
|
:
Building
:
Bloomington Parking Structure is new construction of a 185,000 sq.ft., 6-story parking structure, with capacity for 555 parking spaces for employees and visitors in support of SICK Inc’s continued development at their new Bloomington Campus, located on the north-west corner of the intersection of Lindau Lane and 28th Street.
|
PRROWU202205725
|
ROW Underground
|
N/A
|
Finaled
|
06/27/2022
|
|
:
Right-of-Way
:
Directional boring 2 conduits 200' along American Blvd to serve they newly constructed Sick Building
|
PRPS202202599
|
Sign, Permanent
|
New Sign
|
Finaled
|
03/28/2022
|
|
:
Sign
:
2 sets of face lit channel letters being installed. 72" and 53"
|
PRROWU202202019
|
ROW Underground
|
N/A
|
Finaled
|
05/23/2022
|
|
:
Right-of-Way
:
Start in MH-108 bore north 21', turn east and bore 260' along American Ave, turn south and bore 125' across American Ave onto customer property.
|
PREL202116604
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/22/2021
|
|
:
Electrical
:
Installation of control wiring
|
PRROWO202115708
|
ROW Obstruction
|
N/A
|
Warranty
|
12/06/2021
|
|
:
Right-of-Way
:
Crane set up in road to set windows.
|
PRTP202115213
|
Tank/Pipe Install/Removal
|
Other
|
Expired
|
11/16/2021
|
|
:
Tank
:
temp tanks (2/500gallon tanks set for construction heat
|
PRFS202114984
|
Fire Suppression System
|
Other
|
Finaled
|
12/13/2021
|
|
:
Fire Suppression System
:
furnish and install complete fire protection system intended to protect entire structure; 1,456 heads
|
PRDR202114554
|
Driveway
|
New Driveway
|
Finaled
|
11/02/2021
|
|
:
Driveway
:
Installing 3 new commercial aprons
|
PRWE202114391
|
Well
|
Alteration/Repair/Replace
|
Finaled
|
10/28/2021
|
|
:
Well
:
Removing the temporary dewatering wells for Frattalone along American Boulevard
|
PRMH202113803
|
Mechanical/HVAC
|
Other
|
Finaled
|
11/03/2021
|
|
:
Mechanical
:
New warehouse and production facility. All new equipment (rooftop units with VAV distribution system, exhaust fans, boilers, pumps, finned tube radiation).
|
PRROWU202113496
|
ROW Underground
|
N/A
|
Finaled
|
12/06/2021
|
|
:
Right-of-Way
:
INSTALL A NEW GAS SERVICE MGC# 21-5074 WO# 100117038
|
PRWE202113256
|
Well
|
Alteration/Repair/Replace
|
Finaled
|
10/07/2021
|
|
:
Well
:
Installing six (6) temporary dewatering wells to aid in the installation of storm sewer structures for the Sick Technologies Campus project.
|
PREL202112021
|
Electrical
|
Other
|
Expired
|
09/10/2021
|
|
:
Electrical
:
Install New Fire Alarm System.
|
PRAL202112016
|
Fire Alarm
|
Other
|
Finaled
|
12/17/2021
|
|
:
Fire Alarm
:
Install New Fire Alarm System
|
PRPL202110111
|
Plumbing
|
Other
|
Finaled
|
08/19/2021
|
|
:
Plumbing
:
SICK Technologies New Facility
|
PRUT202108333
|
Utility
|
New
|
Finaled
|
07/08/2021
|
|
:
Utility
:
Water, sanitary and storm sewer for new building site construction
|
PREL202107558
|
Electrical
|
Other
|
Finaled
|
07/26/2021
|
|
:
Electrical
:
TENANT FINISH COMPLETE ELECTRICAL WIRING.
|
PRROWU202107331
|
ROW Underground
|
N/A
|
Finaled
|
|
|
:
Right-of-Way
:
Xcel is trenching in 300' of cable for temporary service to SICK site
|
PRROWU202107262
|
ROW Underground
|
N/A
|
Finaled
|
06/18/2021
|
|
:
Right-of-Way
:
INSTALL 1440' OF 3PHASE 1/0AL UNDERGROUND CABLE. THIS IS A REROUTE OF THE EXISTING CABLE RUNNING THROUGH THE COMBINED EXISTING PROPERTIES TO MAKE ROOM FOR THE NEW REDEVELOPMENT OF THE PROPERTY
|
PREL202107052
|
Electrical
|
Other
|
Finaled
|
06/11/2021
|
|
:
Electrical
:
TEMPORARY ELECTRIC SERVICE INSTALLATION
|
PRGR202106799
|
Grading
|
Alteration/Repair/Replace
|
Expired
|
06/14/2021
|
|
:
Grading
:
Grading for 9 acre site and 138,000 SF future building footprint.
|
PRBD202104058
|
Building
|
New
|
Finaled
|
07/07/2021
|
|
:
Building
:
Ground-up construction of a 140,000 SF office, warehouse, and distribution center for SICK, Inc.
|
PRPL202004022
|
Plumbing
|
Alteration/Repair/Replace
|
Expired
|
05/05/2020
|
|
:
Plumbing
:
Decommission RPZ Febco 825Y, s/n 02331, 1.1/2".
Installed new RPZ Wilkins 975, s/n 4800138, 1.1/2".
Report has been emailed to Julie S., Utility Dept.
|
PRWE201901699
|
Well
|
Other
|
Finaled
|
02/28/2019
|
|
:
Well
:
10 temporary environmental soil borings for proposed development.
|
PRWE201901698
|
Well
|
Other
|
Finaled
|
02/28/2019
|
|
:
Well
:
4 temporary environmental soil borings for proposed development.
|
PRWE201901697
|
Well
|
Other
|
Finaled
|
02/28/2019
|
|
:
Well
:
4 temporary environmental soil borings for proposed development.
|
PRWE201901696
|
Well
|
Other
|
Finaled
|
02/28/2019
|
|
:
Well
:
7 temporary environmental soil borings for proposed development.
|
PRWE201809282
|
Well
|
Other
|
Finaled
|
08/16/2018
|
|
:
Well
:
Environmental well sealings
|
PRWE201809262
|
Well
|
Other
|
Finaled
|
08/16/2018
|
|
:
Well
:
Environmental well sealing.
|
PRDE201800719
|
Demolition
|
Other
|
Finaled
|
06/27/2018
|
|
:
Demolition
:
Complete demolition of building per City Plans
|
PRDE201711029
|
Demolition
|
Other
|
Finaled
|
01/24/2018
|
|
:
Demolition
:
Complete demolition of one-story building. One of three demo permits for Interstate Diesel. One more building will demolition in the Spring, 2018.
|
PRDE201711028
|
Demolition
|
Other
|
Finaled
|
01/24/2018
|
|
:
Demolition
:
Complete demolition of one-story building. One of three demo permits for Interstate Diesel. One more building will demolition in the Spring, 2018.
|
PRDE201711027
|
Demolition
|
Alteration/Repair/Replace
|
Finaled
|
01/24/2018
|
|
:
Demolition
:
Complete demolition of one-story building. One of three demo permits for Interstate Diesel. One more building will demolition in the Spring, 2018.
|