PRMH202514976
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
11/21/2025
|
|
:
Mechanical
:
Relocate 3 diffusers, install Z ductwork for intrusion detection system
|
|
PRMH202512354
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
10/08/2025
|
|
:
Mechanical
:
Replace like-in-kind Liebert units; Install (1) mini-mate
|
|
PRCRF202506628
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Expired
|
06/20/2025
|
|
:
Roofing
:
20,000Sf of reroof
|
|
PREL202503907
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
04/15/2025
|
|
:
Electrical
:
Install (2) 20A, 120V circuits for cubicles.
|
|
PREL202413246
|
Electrical
|
Other
|
Expired
|
10/21/2024
|
|
:
Electrical
:
Install additional fire alarm devices for data room.
|
|
PREL202411757
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
09/09/2024
|
|
:
Electrical
:
JOB 24090139 BAS CONTROL WIRING AND CONNECTIONS FOR VAVs, FCUs, AHU AND EF
|
|
PREL202411197
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/27/2024
|
|
:
Electrical
:
436847.General Dynamics SAPF Phase 1.01-24
• Reinstall (2) Speaker/strobe ceiling mount notification devices
• Furnish (17) Speaker/strobe wall mount notification devices with back boxes
• Furnish (8) Strobe only wall mount notification devices with back boxes
• Installation & Programming
|
|
PRAL202411195
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
09/06/2024
|
|
:
Fire Alarm
:
436847.General Dynamics SAPF Phase 1.01-24
• Reinstall (2) Speaker/strobe ceiling mount notification devices
• Furnish (17) Speaker/strobe wall mount notification devices with back boxes
• Furnish (8) Strobe only wall mount notification devices with back boxes
• Installation & Programming
|
|
PRFS202410289
|
Fire Suppression System
|
Other
|
Finaled
|
08/14/2024
|
|
:
Fire Suppression System
:
Fike fire suppression system with FE 25 agent to protect one Data Center Room
|
|
PREL202409074
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/16/2024
|
|
:
Electrical
:
Add (4) circuits for new receptacles
|
|
PRMH202408417
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
10/14/2024
|
|
:
Mechanical
:
Remodel of existing office space for security upgrades at General Dynamics. See attached mechanical plans from Victus Engineering for scope of work
|
|
PRPL202407288
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
06/10/2024
|
|
:
Plumbing
:
Install new bathroom group at General Dynamics - See attached Plumbing drawings
|
|
PRFS202405847
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Expired
|
06/17/2024
|
|
:
Fire Suppression System
:
Relocate existing 6" main through space through mechanical room and tie back in. Demo existing mains and line piping in lab areas. Re-install new mains and lines. Relocate or add sprinklers in new breakroom and restrooms outside of the lab area. All new heads to be new quick response. No change in density from existing.
|
|
PREL202401909
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/23/2024
|
|
:
Electrical
:
Full build out of a secure lab
EGAN PROJECT #362686
General Dynamics - 8800 Queen Ave S - Phase II 2024 Project
|
|
PRMH202401143
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
02/06/2024
|
|
:
Mechanical
:
Gut and remodel project at General Dynamics location 8800 queen Ave S. Demolish and replace (4) VAV boxes, (2) reheat coils, and distribution ductwork. Add (1) Chilled water fan coil unit.
|
|
PREL202400961
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
01/29/2024
|
|
:
Electrical
:
Fire Alarm Scope associated with Application Number: PRAL202400960
|
|
PRAL202400960
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
02/27/2024
|
|
:
Fire Alarm
:
436847 - Device Removal and Replace
Fire Alarm System Scope Zone B:
Reinstall (3) Speaker/strobe ceiling mount notification devices
Reinstall (3) Strobe only ceiling mount notification devices
|
|
PRFS202400460
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
01/25/2024
|
|
:
Fire Suppression System
:
Relocate or add sprinklers as needed off existing system for remodel. Change out all existing standard Response chrome pendents with new Quick Response concealed pendents with white cover plates. No change in density.
|
|
PRBD202400123
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
02/06/2024
|
|
:
Building
:
General Dynamics - 8800 Queen Ave S - Phase II 2024 Project
Convert existing office space into high security SAPF area. Relocate 2ea existing bathrooms into existing office space.
|
|
PREL202400098
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/04/2024
|
|
:
Electrical
:
General Dynamics - Rickenbacher Lab
Demolition and buildout of a new IT area and the new secure Rickenbacker lab
EGAN PROJEVT #362400
|
|
PRBD202315421
|
Building
|
Alteration/Repair/Replace
|
Expired
|
12/29/2023
|
|
:
Building
:
General Dynamics Phase 1 -
Demo of interior office space and build out of new IT Space
|
|
PREL202312315
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/09/2023
|
|
:
Electrical
:
2309-1103 - Severe weather notification installation for General Dynamics
|
|
PRAL202312314
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
10/20/2023
|
|
:
Fire Alarm
:
Severe weather notification installation:
• (13) AMT-24MCW-FR Notification devices, each device has (3) inputs which can be used to trigger (3) isolated selectable signals. Each signal has a selectable hi and low output for selectable signal notification volume.
• (1) HPF-PS10 Power Supply used to trigger up to (7) independently power limited output circuits. This power supply will power the newly installed FCM-1 modules, the FCM-1 modules will then switch power to each circuit of the notification devices depending on the emergency event that is occurring. The power supply will be installed next to the existing fire alarm panel.
• (1) FMM-1 Monitor Module which will monitor the fault state of the power supply
• (3) FCM-1 Control Modules which will trigger each of the (3) notification signals, depending on the emergency event that is occurring
|
|
PRROWU202306588
|
ROW Underground
|
N/A
|
Warranty
|
10/30/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed via Bore method in the city ROW. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is slated to be DirectLine Communications. The project associated with this permit is Pilot: Sector 4 - City Buried
|
|
PRROWU202306587
|
ROW Underground
|
N/A
|
Warranty
|
08/28/2023
|
|
:
Right-of-Way
:
A new fiber network is being placed along existing utility poles. This permit is being sent on behalf of Intrepid Fiber by Troyer Group. The construction Contractor for this project is slated to be DirectLine Communications. The project associated with this permit is Pilot: Sector 4 - City Aerial
|
|
PREL202303500
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/17/2023
|
|
:
Electrical
:
435887 - Fire Alarm Modification
|
|
PRAL202303499
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
04/25/2023
|
|
:
Fire Alarm
:
435887 - Fire Alarm Modification
|
|
PRFS202302651
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
04/06/2023
|
|
:
Fire Suppression System
:
add/relocate 82 heads on existing fire protection system; no change in density
|
|
PRMH202302214
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
03/22/2023
|
|
:
Mechanical
:
Alteration: Modify chilled water and ductwork systems to convert office area to IT lab.
|
|
PREL202302182
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/21/2023
|
|
:
Electrical
:
Full Buildout of 1st floor lab. Tenant improvement of new lab space. New lighting and power drops. Egan Job #360116
|
|
PRBD202301276
|
Building
|
Alteration/Repair/Replace
|
Expired
|
03/09/2023
|
|
:
Building
:
Buildout for the CUI lab space to consist of demo, drywall work, doors, new floors & ceilings, HVAC fan coil units & mods, new lighting & electrical work & drops, along with low voltage cabling.
|
|
PRFS202215708
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Expired
|
01/05/2023
|
|
:
Fire Suppression System
:
Relocate 62 existing pendent sprinklers & add 2 upright type sprinklers for remodel of existing office area.
|
|
PREL202215294
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/15/2022
|
|
:
Electrical
:
Furnish & Install a 75kva 480v transformer and install (2) 208v 3-phase electrical panels. Egan #359341
|
|
PREL202215081
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/08/2022
|
|
:
Electrical
:
REMODEL OF ARTERMIS ROOM.
|
|
PRMH202214720
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
12/05/2022
|
|
:
Mechanical
:
Remodel of office area.
|
|
PRMH202203739
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
04/19/2022
|
|
:
Mechanical
:
HVAC Modifications per Engineered Plans
|
|
PREL202203355
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/05/2022
|
|
:
Electrical
:
2nd Quarter Inspection
|
|
PRFS202203201
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
04/07/2022
|
|
:
Fire Suppression System
:
Add/Relocate 10 sprinklers for EMI Chamber addition.
|
|
PREL202203009
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/28/2022
|
|
:
Electrical
:
Demo of existing electrical in new EMI room.
New 100amp panel and lighting as feeds for chamber and receptacles. Egan job #357321
|
|
PRBD202202894
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
04/11/2022
|
|
:
Building
:
Demo finishes in conference room and level floor to receive new EMI Chamber, demo and rebuild one wall at exterior of Conference Room, new tile and ACT in Conference room once EMI Chamber has been installed.
|
|
PREL202200280
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/14/2022
|
|
:
Electrical
:
1st Quarter Electrical Permit
|
|
PREL202113532
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/28/2021
|
|
:
Electrical
:
4th Quarter Electrical Permit
|
|
PRROWU202112199
|
ROW Underground
|
N/A
|
Finaled
|
03/03/2022
|
|
:
Right-of-Way
:
INSTALL 4" PLASTIC SERVICE OFF 90TH ST W & ABANDON 6" STEEL MAIN OFF 88TH ST W MGC# 21-4562 WO# 97878560
|
|
PREL202108367
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/12/2021
|
|
:
Electrical
:
3rd quarter electrical permit
|
|
PREL202103514
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/08/2021
|
|
:
Electrical
:
2nd quarter electrical permit for maintenance.
|
|
PREL202101027
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/19/2021
|
|
:
Electrical
:
Facility Electrical Work = 1st quarter 2021
|
|
PREL202015221
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/14/2020
|
|
:
Electrical
:
Egan Job 433249 - Upgrade Fire Alarm System
|
|
PRAL202015220
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
12/21/2020
|
|
:
Fire Alarm
:
Egan Job 433249 - Upgrade Fire Alarm System
|
|
PREL202012052
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/09/2020
|
|
:
Electrical
:
4th Quarter Inspection
|
|
PREL202006925
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/02/2020
|
|
:
Electrical
:
quarterly inspection
|
|
PREL202003249
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/08/2020
|
|
:
Electrical
:
Quarterly Electrical Permit
|
|
PREL202001568
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
02/24/2020
|
|
:
Electrical
:
Egan Job 432362 - Fire Alarm Panel replacement
|
|
PRAL202001566
|
Fire Alarm
|
Other
|
Expired
|
02/20/2020
|
|
:
Fire Alarm
:
Egan Job 432362 - Replace Failing panel only in SPA
|
|
PREL201915238
|
Electrical
|
Other
|
Finaled
|
12/30/2019
|
|
:
Electrical
:
1st Quarter Electrical Permit 2020
|
|
PREL201911536
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/02/2019
|
|
:
Electrical
:
4th quarter electrical inspection
|
|
PREL201907624
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/12/2019
|
|
:
Electrical
:
Quarterly maint, 3rd quarter.
|
|
PREL201906627
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
06/21/2019
|
|
:
Electrical
:
Install constrols on (15) VAV's, pull network wire to electrical room for future expansion to BAS & new stats. (paper app)General Dynamics
|
|
PRFS201904535
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Expired
|
05/30/2019
|
|
:
Fire Suppression System
:
INSTALL PIRANHA SYSTEM
|
|
PRFS201904409
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
05/16/2019
|
|
:
Fire Suppression System
:
Relocate or add sprinkler heads as needed for remodel off existing system. existing heads are standard response. any added heads to match existing. No change in density.
|
|
PRMH201903908
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
05/03/2019
|
|
:
Mechanical
:
Install of new ductwork & VAVs
|
|
PRPL201903855
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
04/26/2019
|
|
:
Plumbing
:
Plumbing rough-in and finish. Modification of existing plumbing system. Installation of electric water heater & associated domestic water piping. Install of waste & vent piping.
|
|
PREL201902844
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/02/2019
|
|
:
Electrical
:
2nd quarter maint.
|
|
PREL201902354
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/21/2019
|
|
:
Electrical
:
Install fire alarm wiring in Phase V of General Dynamics. Job #11351
|
|
PRAL201902350
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
03/21/2019
|
|
:
Fire Alarm
:
Install fire alarm audio/visual devices in Phase V of General Dynamics. Job #11351
|
|
PREL201902064
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/27/2019
|
|
:
Electrical
:
Remodel of existing office space, lighting, office furnishings, GP receptacles, etc.
|
|
PRBD201902061
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
04/22/2019
|
|
:
Building
:
Interior remodel of office space
|
|
PREL201900096
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/04/2019
|
|
:
Electrical
:
First Quarter Maintenance Work
|
|
PREL201815039
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
12/12/2018
|
|
:
Electrical
:
DISCONNECT AND RECONNECT DISHWASHER. SEPARATE PLUMBING PERMIT REQUIRED. Received verification from applicant that this is hard wired ... floors were torn up so had to remove and replace the box.
|
|
PREL201812282
|
Electrical
|
Repair/Replace
|
Finaled
|
10/19/2018
|
|
:
Electrical
:
Retrofit of existing HID exterior lighting fixtures to LED fixtures.
|
|
PREL201811818
|
Electrical
|
Other
|
Finaled
|
10/02/2018
|
|
:
Electrical
:
Quarterly maintenance.
|
|
PREL201806732
|
Electrical
|
Repair/Replace
|
Finaled
|
07/06/2018
|
|
:
Electrical
:
3rd quarter maintenance permit
|
|
PREL201805226
|
Electrical
|
Repair/Replace
|
Expired
|
06/01/2018
|
|
:
Electrical
:
Wire 6 reheat VAV's and 5 cooling only VAV's
|
|
PRMH201804732
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
06/05/2018
|
|
:
Mechanical
:
Replace existing VAV boxes, grills, and diffusers for new office layout.
Upgrade temperature controls.
AHVs existing to remain.
|
|
PRFS201804479
|
Fire Suppression System
|
Other
|
Finaled
|
05/18/2018
|
|
:
Fire Suppression System
:
Relocate or add sprinklers as needed off existing system for remodel. Center of new ACT. No change in density. Any added heads to match existing.
|
|
PRPL201804466
|
Plumbing
|
Alteration/Remodel
|
Finaled
|
05/16/2018
|
|
:
Plumbing
:
Addition of sink, dishwasher, ice maker and electric water heater with associated domestic water and waste piping.
|
|
PREL201804314
|
Electrical
|
Alteration/Remodel
|
Finaled
|
05/11/2018
|
|
:
Electrical
:
fire alarm modifications. Egan job 430208
|
|
PRAL201804312
|
Fire Alarm
|
Alteration/Remodel
|
Finaled
|
05/21/2018
|
|
:
Fire Alarm
:
Fire alarm modifications. Egan Job 430208
Called Margo and left a message that the check amt was too high. She should be calling back to either pay with card or confirm that she will be sending a new check. NelsonThorpe Sarah 05/18/2018 2:26 PM
|
|
PREL201803845
|
Electrical
|
Alteration/Remodel
|
Finaled
|
05/22/2018
|
|
:
Electrical
:
Office remodel
|
|
PREL201802965
|
Electrical
|
Repair/Replace
|
Finaled
|
04/12/2018
|
|
:
Electrical
:
Quarterly maintenance permit.
|
|
PRBD201802194
|
Building
|
Alteration/Remodel
|
Finaled
|
04/10/2018
|
|
:
Building
:
Interior remodel of tenant space. Remove walls and add cubicles.
|
|
PREHP201801277
|
Environmental Health Plan
|
New
|
Finaled
|
07/09/2018
|
|
:
Environmental Health Plan
:
Replacing vending area with micro mart.
|
|
PREL201800763
|
Electrical
|
Alteration/Remodel
|
Permit(s) Issued
|
01/26/2018
|
|
:
Electrical
:
Install 2 prismatic lights replacing parabolics and wiring for dishwasher. Install sub panel.
|
|
PREL201800073
|
Electrical
|
Repair/Replace
|
Finaled
|
01/09/2018
|
|
:
Electrical
:
!st Quarter 2018 Maintenance permit.
|
|
PRPL201712281
|
Plumbing
|
Repair/Replace
|
Finaled
|
01/03/2018
|
|
:
Plumbing
:
Replace dishwasher
|
|
PREL201709353
|
Electrical
|
Other
|
Finaled
|
10/04/2017
|
|
:
Electrical
:
4th Quarter Maintenance - General Dynamics
|
|
PREL201708967
|
Electrical
|
Alteration/Remodel
|
Permit(s) Issued
|
10/03/2017
|
|
:
Electrical
:
Install and wire building automation controls for 6 units.
|
|
PRMH201708657
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
09/14/2017
|
|
:
Mechanical
:
New chilled water piping serving new fan coil units as well as new duct work. New VAV boxes and serving ductwork.
|
|
PREL201708190
|
Electrical
|
Alteration/Remodel
|
Finaled
|
09/06/2017
|
|
:
Electrical
:
Electrical for remodel of SMS LAb and SW Development Lab. Egan job#801242
|
|
PREL201707974
|
Electrical
|
Alteration/Remodel
|
Finaled
|
08/29/2017
|
|
:
Electrical
:
TAC lab remodel. Egan Job #801242
|
|
PREL201705833
|
Electrical
|
Repair/Replace
|
Finaled
|
07/11/2017
|
|
:
Electrical
:
3rd Quarter Maintenance Permit - General Dynamics
|
|
PREL201702584
|
Electrical
|
Repair/Replace
|
Finaled
|
04/18/2017
|
|
:
Electrical
:
Quarterly maintenance permit
|