PRWE202503653
|
Well
|
Other
|
Waiting for Well Record
|
04/16/2025
|
|
:
Well
:
Drill heat exchanger well (Please note, this is Well #2)
|
PRWE202502927
|
Well
|
Other
|
Waiting for Well Record
|
03/26/2025
|
|
:
Well
:
Drill heat exchanger well
|
PRROWO202501930
|
ROW Obstruction
|
N/A
|
In Plan Check
|
|
|
:
Right-of-Way
:
The new addition at the SICK office building will utilize geothermal wells for cooling/heating the building. Drilling of one of these wells will require a partial lane shutdown on Winstead Way heading South between Lindau Lane and American Blvd E. We're requesting shutdown of this lane as noted in the attached marked up map. As of today, we are targeting late May or early June for when this lane would need to be closed. Duration of this lane closure is estimated at two weeks.
|
PREHP202500987
|
Environmental Health Plan
|
Other
|
Permit(s) Issued
|
03/28/2025
|
|
:
Environmental Health Plan
:
Installation of a new commercial kitchen in a new office building.
|
PREL202500654
|
Electrical
|
Other
|
Permit(s) Issued
|
01/23/2025
|
|
:
Electrical
:
Instal new fire alarm system: 1 FACP, 1 Annunciator, 3 NAC panels, 1 pull station, 76 smoke detectors,13 duct detectors with test switches, 4 beam detectors, 98 speaker only, 156 speaker strobes, 11 strobe only, 4 input modules, 9 relay modules.
|
PRAL202500627
|
Fire Alarm
|
Other
|
Returned for Correction
|
|
|
:
Fire Alarm
:
Install new fire alarm system: SICK Phase 2: 1 FACP, 1 Annunciator, 3 NAC panels, 1 pull station, 76 smoke detectors,13 duct detectors with test switches, 4 beam detectors, 98 speaker only, 156 speaker strobes, 11 strobe only, 4 input modules, 9 relay modules.
|
PRMH202415577
|
Mechanical/HVAC
|
Other
|
Pending
|
|
|
:
Mechanical
:
There is a geothermal system scheduled to be installed that will be supporting the HVAC system in the new SICK building going up in Bloomington. With the location of this install, we will need part of the sidewalk and one lane of Winstead Way closed between American Blvd E and Lindau Lane. The sidewalk and one lane closure will be on the west side of Winstead Way (heading south), which is closest to the SICK building. We are requesting this sidewalk and one lane of Winstead Way to be closed starting 12/9/24. This install is expected to last 2 weeks.
|
PRROWU202415073
|
ROW Underground
|
N/A
|
Warranty
|
12/03/2024
|
|
:
Right-of-Way
:
INSTALLING TWO NEW DISTRIBUTION LINES AND TRANSFORMERS FOR NEW BUSINESS OFFICE COMPLEX. SICK USA
|
PRROWO202413950
|
ROW Obstruction
|
N/A
|
Warranty
|
11/18/2024
|
|
:
Right-of-Way
:
A crane will be used to lift, move, and set pre-glaze window systems in the window openings of the new Sick II building. The roads built into the Safety Signs' plan will need to be closed during work hours to ensure the safety of the public.
My understanding is that another trade currently has a street closure control plan in place for the same streets our company is applying for, but for the sake of our scope of work, we are requesting a permit as well.
|
PRROWO202413415
|
ROW Obstruction
|
N/A
|
Ready for Issuance
|
|
|
:
Right-of-Way
:
Concrete pump pouring the east roof deck with two trucks needing access to the pump truck at once. A double lane closure is needed from the east road (Winstead way) from 4AM-2PM. The closure will affect the two southbound lanes.
|
PRBD202412961
|
Building
|
New
|
Closed
|
10/02/2024
|
|
:
Building
:
****FOR RETURNED PAYMENT TRANSACTION ONLY - Original permit under PRBD202402418. ****PAID 10.2.2024***
|
PRBD202412960
|
Building
|
Other
|
Closed
|
09/24/2024
|
|
:
Building
:
(CLONE PERMIT ONLY FOR REPAYMENT- Actual Building permit is under PRBD202402418)
The Project consists of a new construction of a 140,000 sq.ft. office building, including office space for up to 385 employees, with lab spaces for product development, testing, and customer interaction; a training and resource center for customers, visitors and SICK employees; along with various employee and guest amenities. Project includes a glazed skyway link building connecting the Phase 1 and Phase 2 buildings and associated site development and landscaping.
|
PRROWO202409941
|
ROW Obstruction
|
N/A
|
Permit(s) Issued
|
08/13/2024
|
|
:
Right-of-Way
:
Concrete pump pouring the west side of level 2 deck with two trucks needing access to the pump truck at once. A double lane closeure is needed from the east road (winstead way) from 4-9am.
|
PRFS202409740
|
Fire Suppression System
|
Other
|
Permit(s) Issued
|
12/11/2024
|
|
:
Fire Suppression System
:
furnish and install complete fire protection system (1,144 quick response heads) intended to protect the entire structure
|
PREL202408350
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
06/28/2024
|
|
:
Electrical
:
DDC Controls Building Automation System
SICK Mpls Campus Parking Ramp - Uhl 024TC137
|
PREL202408347
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
07/03/2024
|
|
:
Electrical
:
DDC Controls - Building Automation System
SICK Mpls Campus PH 2 - Uhl 024TC124
|
PREL202408199
|
Electrical
|
Other
|
Permit(s) Issued
|
07/12/2024
|
|
:
Electrical
:
OFFICE BUILDING TENANT FINISH
|
PRMH202407934
|
Mechanical/HVAC
|
Other
|
Permit(s) Issued
|
07/08/2024
|
|
:
Mechanical
:
Sick - Phase 2 - 4 story office tower mechanical scope
|
PRROWO202406784
|
ROW Obstruction
|
N/A
|
Warranty
|
06/07/2024
|
|
:
Right-of-Way
:
Lane closure for concrete truck and pump.
|
PRST202406416
|
Structural
|
Other
|
Permit(s) Issued
|
05/17/2024
|
|
:
Building
:
The Project consists of a new construction of a 140,000 sq.ft. office building, including office space for up to 385 employees, with lab spaces for product development, testing, and customer interaction; a training and resource center for customers, visitors and SICK employees; along with various employee and guest amenities. Project includes a glazed skyway link building connecting the Phase 1 and Phase 2 buildings and associated site development and landscaping.
|
PRPL202405278
|
Plumbing
|
Other
|
Permit(s) Issued
|
04/30/2024
|
|
:
Plumbing
:
SICK Phase 2 - 4 story new office building plumbing scope.
|
PREL202405087
|
Electrical
|
Other
|
Expired
|
04/24/2024
|
|
:
Electrical
:
TEMPORARY POWER FOR SICK, INC. OFFICE BUILDING
|
PRFD202405009
|
Foundation
|
Other
|
Permit(s) Issued
|
05/10/2024
|
|
:
Foundation
:
The Project consists of a new construction of a 140,000 sq.ft. office building, including office space for up to 385 employees, with lab spaces for product development, testing, and customer interaction; a training and resource center for customers, visitors and SICK employees; along with various employee and guest amenities. Project includes a glazed skyway link building connecting the Phase 1 and Phase 2 buildings and associated site development and landscaping. Full Parking Structure Permit under PRBD202402359
|
PREHP202404834
|
Environmental Health Plan
|
Other
|
Permit(s) Issued
|
05/15/2024
|
|
:
Environmental Health Plan
:
The Project consists of a new construction of a 140,000 sq.ft. office building, including office space for up to 385 employees, with lab spaces for product development, testing, and customer interaction; a training and resource center for customers, visitors and SICK employees; along with various employee and guest amenities. Project includes a glazed skyway link building connecting the Phase 1 and Phase 2 buildings and associated site development and landscaping.
|
PRUT202403705
|
Utility
|
New
|
Finaled
|
04/01/2024
|
|
:
Utility
:
Installation of Partial Watermain along Lindau Ln and Winstead Way
|
PRUT202403280
|
Utility
|
New
|
Issued
|
04/29/2024
|
|
:
Utility
:
2 Storm Sewer Connections along Winsted Way
|
PRBD202402418
|
Building
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
09/24/2024
|
|
:
Building
:
The Project consists of a new construction of a 140,000 sq.ft. office building, including office space for up to 385 employees, with lab spaces for product development, testing, and customer interaction; a training and resource center for customers, visitors and SICK employees; along with various employee and guest amenities. Project includes a glazed skyway link building connecting the Phase 1 and Phase 2 buildings and associated site development and landscaping.
|
PRDR202314097
|
Driveway
|
New Driveway
|
Expired
|
11/21/2023
|
|
:
Driveway
:
A 30'-0" portion of the curb/gutter and sidewalk at the South bound lane of Winstead Wy (between American Blvd and Lindau Ln.) was removed to facilitate the connection of a new sanitary utility under utility permit number PRUT202312297.
The curb line needs to be replaced at this location. The sidewalk portion will temporarily be installed with asphalt to facilitate a hard surface over winter and then removed and replaced per city specifications as weather allows in the spring of 2024.
|
PRUT202312297
|
Utility
|
New
|
Issued
|
11/02/2023
|
|
:
Utility
:
Fall work - Installation of partial watermain along Lindau AVe and Installation of Sanitary Service
Permit only for the work on attached plan in highlighted yellow, all other work to be permitted for in 2024. TAS
|
PRGR202310909
|
Grading
|
Other
|
Permit(s) Issued
|
10/23/2023
|
|
:
Grading
:
Earthwork, utilities and grading work for a future office building south of SICK's Phase I building and north of Lindau Ln.
|
PRROWU202205725
|
ROW Underground
|
N/A
|
Finaled
|
06/27/2022
|
|
:
Right-of-Way
:
Directional boring 2 conduits 200' along American Blvd to serve they newly constructed Sick Building
|
PRPS202202599
|
Sign, Permanent
|
New Sign
|
Finaled
|
03/28/2022
|
|
:
Sign
:
2 sets of face lit channel letters being installed. 72" and 53"
|
PRROWU202202019
|
ROW Underground
|
N/A
|
Finaled
|
05/23/2022
|
|
:
Right-of-Way
:
Start in MH-108 bore north 21', turn east and bore 260' along American Ave, turn south and bore 125' across American Ave onto customer property.
|
PREL202116604
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/22/2021
|
|
:
Electrical
:
Installation of control wiring
|
PRROWO202115708
|
ROW Obstruction
|
N/A
|
Warranty
|
12/06/2021
|
|
:
Right-of-Way
:
Crane set up in road to set windows.
|
PRTP202115213
|
Tank/Pipe Install/Removal
|
Other
|
Expired
|
11/16/2021
|
|
:
Tank
:
temp tanks (2/500gallon tanks set for construction heat
|
PRFS202114984
|
Fire Suppression System
|
Other
|
Finaled
|
12/13/2021
|
|
:
Fire Suppression System
:
furnish and install complete fire protection system intended to protect entire structure; 1,456 heads
|
PRDR202114554
|
Driveway
|
New Driveway
|
Finaled
|
11/02/2021
|
|
:
Driveway
:
Installing 3 new commercial aprons
|
PRWE202114391
|
Well
|
Alteration/Repair/Replace
|
Finaled
|
10/28/2021
|
|
:
Well
:
Removing the temporary dewatering wells for Frattalone along American Boulevard
|
PRMH202113803
|
Mechanical/HVAC
|
Other
|
Finaled
|
11/03/2021
|
|
:
Mechanical
:
New warehouse and production facility. All new equipment (rooftop units with VAV distribution system, exhaust fans, boilers, pumps, finned tube radiation).
|
PRROWU202113496
|
ROW Underground
|
N/A
|
Finaled
|
12/06/2021
|
|
:
Right-of-Way
:
INSTALL A NEW GAS SERVICE MGC# 21-5074 WO# 100117038
|
PRWE202113256
|
Well
|
Alteration/Repair/Replace
|
Finaled
|
10/07/2021
|
|
:
Well
:
Installing six (6) temporary dewatering wells to aid in the installation of storm sewer structures for the Sick Technologies Campus project.
|
PREL202112021
|
Electrical
|
Other
|
Expired
|
09/10/2021
|
|
:
Electrical
:
Install New Fire Alarm System.
|
PRAL202112016
|
Fire Alarm
|
Other
|
Finaled
|
12/17/2021
|
|
:
Fire Alarm
:
Install New Fire Alarm System
|
PRPL202110111
|
Plumbing
|
Other
|
Finaled
|
08/19/2021
|
|
:
Plumbing
:
SICK Technologies New Facility
|
PRUT202108333
|
Utility
|
New
|
Finaled
|
07/08/2021
|
|
:
Utility
:
Water, sanitary and storm sewer for new building site construction
|
PREL202107558
|
Electrical
|
Other
|
Finaled
|
07/26/2021
|
|
:
Electrical
:
TENANT FINISH COMPLETE ELECTRICAL WIRING.
|
PRROWU202107331
|
ROW Underground
|
N/A
|
Finaled
|
|
|
:
Right-of-Way
:
Xcel is trenching in 300' of cable for temporary service to SICK site
|
PRROWU202107262
|
ROW Underground
|
N/A
|
Finaled
|
06/18/2021
|
|
:
Right-of-Way
:
INSTALL 1440' OF 3PHASE 1/0AL UNDERGROUND CABLE. THIS IS A REROUTE OF THE EXISTING CABLE RUNNING THROUGH THE COMBINED EXISTING PROPERTIES TO MAKE ROOM FOR THE NEW REDEVELOPMENT OF THE PROPERTY
|
PREL202107052
|
Electrical
|
Other
|
Finaled
|
06/11/2021
|
|
:
Electrical
:
TEMPORARY ELECTRIC SERVICE INSTALLATION
|
PRGR202106799
|
Grading
|
Alteration/Repair/Replace
|
Expired
|
06/14/2021
|
|
:
Grading
:
Grading for 9 acre site and 138,000 SF future building footprint.
|
PRBD202104058
|
Building
|
New
|
Finaled
|
07/07/2021
|
|
:
Building
:
Ground-up construction of a 140,000 SF office, warehouse, and distribution center for SICK, Inc.
|
PRPL202004022
|
Plumbing
|
Alteration/Repair/Replace
|
Expired
|
05/05/2020
|
|
:
Plumbing
:
Decommission RPZ Febco 825Y, s/n 02331, 1.1/2".
Installed new RPZ Wilkins 975, s/n 4800138, 1.1/2".
Report has been emailed to Julie S., Utility Dept.
|
PRWE201901699
|
Well
|
Other
|
Finaled
|
02/28/2019
|
|
:
Well
:
10 temporary environmental soil borings for proposed development.
|
PRWE201901698
|
Well
|
Other
|
Finaled
|
02/28/2019
|
|
:
Well
:
4 temporary environmental soil borings for proposed development.
|
PRWE201901697
|
Well
|
Other
|
Finaled
|
02/28/2019
|
|
:
Well
:
4 temporary environmental soil borings for proposed development.
|
PRWE201901696
|
Well
|
Other
|
Finaled
|
02/28/2019
|
|
:
Well
:
7 temporary environmental soil borings for proposed development.
|
PRWE201809282
|
Well
|
Other
|
Finaled
|
08/16/2018
|
|
:
Well
:
Environmental well sealings
|
PRWE201809262
|
Well
|
Other
|
Finaled
|
08/16/2018
|
|
:
Well
:
Environmental well sealing.
|
PRDE201800719
|
Demolition
|
Other
|
Finaled
|
06/27/2018
|
|
:
Demolition
:
Complete demolition of building per City Plans
|
PRDE201711029
|
Demolition
|
Other
|
Finaled
|
01/24/2018
|
|
:
Demolition
:
Complete demolition of one-story building. One of three demo permits for Interstate Diesel. One more building will demolition in the Spring, 2018.
|
PRDE201711028
|
Demolition
|
Other
|
Finaled
|
01/24/2018
|
|
:
Demolition
:
Complete demolition of one-story building. One of three demo permits for Interstate Diesel. One more building will demolition in the Spring, 2018.
|
PRDE201711027
|
Demolition
|
Alteration/Repair/Replace
|
Finaled
|
01/24/2018
|
|
:
Demolition
:
Complete demolition of one-story building. One of three demo permits for Interstate Diesel. One more building will demolition in the Spring, 2018.
|