PRBD202504115
|
Building
|
Alteration/Repair/Replace
|
In Plan Check
|
|
|
:
Building
:
Demo conference room and divide into 3 separate rooms on 3rd floor.
2nd floor Adding two walls for a private office space
|
PRFS202504042
|
Fire Suppression System
|
Other
|
In Plan Check
|
|
|
:
Fire Suppression System
:
FLuoro-K fire suppression system in the electrical rooms
|
PREL202503185
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
04/01/2025
|
|
:
Electrical
:
JOB 820393 POLARFAB Q2 ELECTRICAL MAINTENANCE
|
PREL202503166
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
03/31/2025
|
|
:
Electrical
:
Simplex FA Remodel Phase 3
|
PRAL202503164
|
Fire Alarm
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
04/15/2025
|
|
:
Fire Alarm
:
Simplex FA Remodel Phase 3
|
PRBD202503084
|
Building
|
Addition
|
In Plan Check
|
|
|
:
Building
:
Polar Semiconductor is proposing an addition to existing building P1 that would include a two-stop passenger elevator that connects Lower Level to First Level. This elevator is to improve pedestrian flow between the clean rooms on the two levels. This elevator is not part of the building egress.
This permit application is for Phase 5 scope of work only.
|
PRUT202502782
|
Utility
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Utility
:
Complete remodel of Polar Semiconductor mechanical systems and cleanrooms. We already have plumbing and mechanical permits pulled. This permit is for the (2) waste water meters needed to monitor Polar's additional well water waste going to city sanitary.
We need (2) 4" waste water meters.
|
PRMH202502595
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
03/31/2025
|
|
:
Mechanical
:
Oct 24 through February 25 On-Site Mechanical Work
|
PRMH202501907
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
03/03/2025
|
|
:
Mechanical
:
Replacing VAVs, ductwork and GRDs with new ones per plan sheet.
|
PREL202501608
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
02/19/2025
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit 2024 Q4
Work to be completed by Nick Mauk (License No AM007747)
|
PREL202501607
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
02/19/2025
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit 2025 Q1
Work to be completed by Nick Mauk (License No AM007747)
|
PREL202501440
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
02/18/2025
|
|
:
Electrical
:
Install replacement fire alarm.
|
PRAL202501439
|
Fire Alarm
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
03/27/2025
|
|
:
Fire Alarm
:
Simplex fire alarm remodel.
|
PREL202501224
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/12/2025
|
|
:
Electrical
:
Zone 1 Only - Split Office in half. Rework lighting fixtures and adding receptacles to existing circuits
|
PRFS202500919
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
02/26/2025
|
|
:
Fire Suppression System
:
New cleanrooms are being built in which we are dropping new heads into
Cleanrooms are being remodeled and heads are add/relocated
New office space buildouts in which heads are being add/relocated
Brand new electrical room being built which will be protected by a new double interlocked pre-action system
New Gas room buildout that will be protected by a new double interlocked pre-action system
Existing loading dock protected by dry heads will be infilled and new wet heads will be add/relocated
|
PRBD202500612
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
02/05/2025
|
|
:
Building
:
Zone 1 Only – Split office in half, added walls to deck, redo ceiling grid/tile (2x2), patch/mud and paint
|
PREL202416742
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/06/2025
|
|
:
Electrical
:
JOB 820393 2025 Q1 ELECTRICAL PERMIT
|
PRBD202416157
|
Building
|
Alteration/Repair/Replace
|
In Plan Check
|
|
|
:
Building
:
Installation of a 6 and 8' high black vinyl fence along north property line parallel to park and ride garage.
|
PREL202415634
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
12/18/2024
|
|
:
Electrical
:
JOB 81609 POLAR FAB CLEAN ROOM REMODEL WITH NEW ELECTRICAL SERVICES
|
PRBD202415268
|
Building
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Building
:
Polar Semiconductor is proposing an interior remodel of existing buildings P1, p2, and P3 and a 3,750 square foot electrical room addition between buildings P2 and P3. The project aims to improve Polar Semiconductor's manufacturing capabilities and increase the production of semiconductor products. This permit application is for Phase 4 scope of work only.
The scope in Bid Pack 7 is slated for Phase 4 of the construction work at Polar. Scope includes remodel of cleanrooms on lower level and first level of P1.
|
PRUT202415077
|
Utility
|
New
|
Permit(s) Issued
|
11/15/2024
|
|
:
Utility
:
Remove existing manhole and section of 12" RCP, replace manhole with 5'x3' box structure and reinstall section of 12" RCP. Raise rim of existing CB and connect 6" PVC roof drain to existing CB.
|
PRMH202414207
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
11/25/2024
|
|
:
Mechanical
:
Cleanroom and Infrastructure Remodel throughout 3 existing buildings.
|
PRPL202414202
|
Plumbing
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
11/25/2024
|
|
:
Plumbing
:
Remodel of 3 existing buildings.
|
PRMH202414198
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
11/25/2024
|
|
:
Mechanical
:
Maintenance
|
PREL202413778
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
10/18/2024
|
|
:
Electrical
:
JOB 81609 POLAR SEMICONDUCTOR - PROVIDE TEMP POWER FROM BUILDING FOR JOBSITE TRAILERS
|
PREL202413084
|
Electrical
|
Other
|
Finaled
|
10/08/2024
|
|
:
Electrical
:
JOB 87769 POLARFAB Q4 ELECTRICAL MAINTENANCE
|
PREL202408455
|
Electrical
|
Other
|
Finaled
|
07/01/2024
|
|
:
Electrical
:
JOB 820068 POLARFAB 2024 Q3 MAINT
|
PRFS202408227
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
07/15/2024
|
|
:
Fire Suppression System
:
Replace the existing branch lines with 2" lines instead of the existing 1 1/2" lines. New 16.8 K heads will also be installed.
|
PREL202408037
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
06/21/2024
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit 2024 - Q3
Work to be completed by Nick Mauk (License No AM007747)
|
PRTC202406039
|
Tent/Canopy
|
Other
|
Finaled
|
05/09/2024
|
|
:
Tent/Canopy
:
20'x20' full sidewall up for Polar Semiconductor 5/13 event.
|
PRBD202405941
|
Building
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
10/04/2024
|
|
:
Building
:
Phase II - Infill existing loading dock with processed chilled water plant and exterior wall assembly, MEP upgrades in
Phase III - Remodeling existing manufacturing areas, adding interior H-4 gas room, adding prayer/ablution rooms, remodeling accessible toilet rooms.
Polar Semiconductor is proposing an interior remodel of existing buildings P1, P2, and P3 and a 3,750 square foot electrical room addition between buildings P2 and P3. The project aims to improve Polar Semiconductor’s manufacturing capabilities and increase the production of semiconductor products.
The project will be executed throughout multiple phases with construction occurring over the course of multiple years. Roughly ninety percent of the scope of work is interior remodeling, mechanical/electrical upgrades, and tool installations for Polar Semiconductor’s manufacturing processes.
|
PREL202403619
|
Electrical
|
Other
|
Finaled
|
03/27/2024
|
|
:
Electrical
:
JOB 820068 2024 POLAR SEMICONDUCTOR Q2 ELECTRICAL MAINTENANCE
|
PREL202403067
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
03/14/2024
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit 2024 Q2
Work to be completed by Nick Mauk (License No AM007747)
|
PRTC202402393
|
Tent/Canopy
|
Other
|
Finaled
|
03/05/2024
|
|
:
Tent/Canopy
:
Tent installation for Polar Semiconductor on 3/07, one 5M X 10M
|
PRFS202400691
|
Fire Suppression System
|
Other
|
Finaled
|
02/05/2024
|
|
:
Fire Suppression System
:
Remove Branch Lines and Install new Branch Lines and Heads on an existing system. All mains are existing and are to remain.
|
PREL202315689
|
Electrical
|
Other
|
Finaled
|
01/02/2024
|
|
:
Electrical
:
JOB 820068 POLARFAB Q1 ELECTRICAL MAINTENANCE PERMIT
|
PREL202314076
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
11/17/2023
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit 2024 Q1
Work to be completed by Nick Mauk (License No AM007747)
|
PRBD202312397
|
Building
|
Other
|
Expired
|
11/02/2023
|
|
:
Building
:
Adding a curb/pad for owner provided caustic tank. Scope to include helical pier installation.
|
PRCRF202312087
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Finaled
|
10/10/2023
|
|
:
Roofing
:
Reroof of 2500Sf
Tear existing roof off down to metal deck and replace with new insulation and EPDM membrane.
|
PREL202311648
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
09/26/2023
|
|
:
Electrical
:
JOB 87769 POLARFAB Q4 ELECTRICAL MAINTENANCE
|
PREL202311282
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
09/19/2023
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit 2023 Q4
Work to be completed by Nick Mauk (License No AM007747)
|
PREL202311280
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
09/19/2023
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit 2023 Q3
Work to be completed by Nick Mauk (License No AM007747)
|
PREL202311279
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
09/19/2023
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit 2023 Q2
Work to be completed by Nick Mauk (License No AM007747)
|
PRMH202310261
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
09/13/2023
|
|
:
Mechanical
:
Maintenance.
|
PRBD202307899
|
Building
|
Addition
|
Permit(s) Issued
|
10/04/2024
|
|
:
Building
:
PHASE 1 - Polar Semiconductor is proposing an interior remodel of existing buildings P1, P2, and P3 and a 3,750 square foot electrical room addition between buildings P2 and P3. The project aims to improve Polar Semiconductor’s manufacturing capabilities and increase the production of semiconductor products.
This permit application is for Phase 1 scope of work only.
The project will be executed throughout multiple phases with construction occurring over the course of multiple years. Roughly ninety percent of the scope of work is interior remodeling, mechanical/electrical upgrades, and tool installations for Polar Semiconductor’s manufacturing processes.
The electrical room addition includes on-grade exterior transformers within an electrical yard. There will be modifications to the site to reconfigure underground utilities and provide additional hardscape and softscape, including a safety fence at the perimeter.
|
PREL202307811
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/18/2023
|
|
:
Electrical
:
JOB 87769 Q3 ELECTRICAL MAINTENANCE
|
PRROWU202307761
|
ROW Underground
|
N/A
|
Warranty
|
08/02/2023
|
|
:
Right-of-Way
:
Directional bore 250' to place a new 2" conduit with fiber cable and place one new 30"x48"x36" handhole.
|
PRWE202306102
|
Well
|
Other
|
Finaled
|
06/07/2023
|
|
:
Well
:
Soil boring for testing
|
PRTC202304161
|
Tent/Canopy
|
Other
|
Finaled
|
05/02/2023
|
|
:
Tent/Canopy
:
Installing one 30' X 50' on 5/04, removal 5/10
|
PREL202302586
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/29/2023
|
|
:
Electrical
:
JOB 87769 Q2 ELECTRICAL MAINTENANCE POLAR SEMICONDUCTOR
|
PREL202300073
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/05/2023
|
|
:
Electrical
:
JOB 87459 POLARFAB Q1 2023 ELECTRICAL MAINTENANCE
|
PRWE202215765
|
Well
|
Other
|
Finaled
|
12/29/2022
|
|
:
Well
:
Annual monitoring well maintenance permit for 2023.
|
PREL202215434
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
12/22/2022
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit - 2022 Q4
Work to be completed by Nick Mauk (License No AM007747) Locations
|
PRTP202214961
|
Tank/Pipe Install/Removal
|
Other
|
Expired
|
12/28/2022
|
|
:
Tank
:
Connect 2 - 420# cylinders to 2 - 350,000 btu heaters
|
PRTC202214537
|
Tent/Canopy
|
Other
|
Finaled
|
11/28/2022
|
|
:
Tent/Canopy
:
Tent installation for one 15M x 10M on 12/05.
|
PREL202212480
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
10/06/2022
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit - 2022 Q4. Work to be completed by Nick Mauk (License No AM007747)
|
PREL202212479
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
10/06/2022
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit - 2022 Q3. Work to be completed by Nick Mauk (License No AM007747)
|
PREL202212317
|
Electrical
|
Other
|
Finaled
|
10/14/2022
|
|
:
Electrical
:
JOB 87459 POLARFAB QUARTERLY MAINTENANCE Q4
|
PRPL202210104
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
08/17/2022
|
|
:
Plumbing
:
Replace 130' of 6" watermain going from the well head into the BUilding. We will connect to the well head and install C-900 pipe once we get to the building we will put onone stick of ductile with a flange going into the building.
|
PREL202207850
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/01/2022
|
|
:
Electrical
:
JOB 87459 POLAR FAB QUARTERLY MAINTENANCE Q3
|
PRROWU202206945
|
ROW Underground
|
N/A
|
Finaled
|
07/13/2022
|
|
:
Right-of-Way
:
Directional Drill for placement of (1) 2" conduits, install one new Fiber Vault, and Pull Fiber Through an existing Comcast conduit.
|
PRBD202206475
|
Building
|
Alteration/Repair/Replace
|
Expired
|
07/05/2022
|
|
:
Building
:
Split a single office into two rooms
|
PRMH202204565
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
05/03/2022
|
|
:
Mechanical
:
Maintenance
|
PRBD202203163
|
Building
|
Alteration/Repair/Replace
|
Expired
|
04/11/2022
|
|
:
Building
:
Construct a single office tenant improvement
|
PREL202203162
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/30/2022
|
|
:
Electrical
:
JOB 87459 POLARFAB 2022 Q2 ELECTRICAL MAINTENANCE
|
PREL202202472
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
03/15/2022
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit - 200 Q2. Work to be completed by Nick Mauk (License No AM007747)
|
PREL202200301
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/11/2022
|
|
:
Electrical
:
JOB 87459 POLAR SEMICONDUCTOR Q1 2022 ELECTRICAL MAINTENANCE
|
PRWE202116864
|
Well
|
Other
|
Permit(s) Issued
|
12/30/2021
|
|
:
Well
:
Annual Well Maintenance Permit
|
PREL202116256
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
12/13/2021
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit - 2022 Q1. Work to by completed by Nick Mauk (License No AM007747)
|
PREL202114118
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/21/2021
|
|
:
Electrical
:
JOB 83979 Q4 ELECTRICAL MAINTENANCE - POLAR FAB
|
PREL202112115
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/14/2021
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit - 2021 Q4. Work to be completed by Nick Mauk (License No AM007747)
|
PRFS202111394
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
08/27/2021
|
|
:
Fire Suppression System
:
Relocate two (2) existing automatic fire sprinklers to be centered in the room, per Polaris Semiconductor's request.
|
PRBD202108607
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
07/22/2021
|
|
:
Building
:
Adding two offices in existing open office space.
|
PREL202107351
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/14/2021
|
|
:
Electrical
:
Polar Semiconductor Quarterly Maintenance Permit. Work to be completed by Nick Mauk (License No AM007747)
|
PRMH202104284
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
04/19/2021
|
|
:
Mechanical
:
Maintenance
|
PRCRF202104106
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Expired
|
04/23/2021
|
|
:
Roofing
:
Waterproofing roof 14,800 sf
|
PREL202103505
|
Electrical
|
Other
|
Expired
|
04/02/2021
|
|
:
Electrical
:
JOB 83979 POLARFAB Q2 2021 ELECTRICAL MAINTENANCE.
|
PREL202102320
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/08/2021
|
|
:
Electrical
:
Quarterly Maintenance Permit for 2021 2nd Quarter
|
PRWE202100656
|
Well
|
Other
|
Finaled
|
01/20/2021
|
|
:
Well
:
Annual Maintenance Permit
|
PREL202100149
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/07/2021
|
|
:
Electrical
:
JOB 83615 PHASE 1130 POLAR FAB Q1 ELECTRICAL MAINTENANCE
|
PREL202015711
|
Electrical
|
Other
|
Finaled
|
12/30/2020
|
|
:
Electrical
:
Quarterly Maintenance Permit for 2021 1st Quarter
|
PRMH202014890
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
12/08/2020
|
|
:
Mechanical
:
On-site Labor at Polar Fab Semiconductors
|
PRMH202011980
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
10/06/2020
|
|
:
Mechanical
:
Maintenance
|
PREL202011727
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/01/2020
|
|
:
Electrical
:
JOB 83615 POLARFAB Q4 2020 ELECTRICAL MAINTENANCE
|
PREL202010826
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/25/2020
|
|
:
Electrical
:
Industrial Building - 4th Quarter Maintenance
|
PRBD202008930
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
08/21/2020
|
|
:
Building
:
Partial height gyp board partitions to define a warehouse area.
|
PREL202007282
|
Electrical
|
Other
|
Finaled
|
07/13/2020
|
|
:
Electrical
:
JOB 83615 POLARFAB QUARTERLY MAINT Q3 2020
|
PREL202005783
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/10/2020
|
|
:
Electrical
:
Quarterly maintenance - 3rd Quarter 2020
|
PREL202003624
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/20/2020
|
|
:
Electrical
:
JOB 83615 POLARFAB QUARTERLY MAINTENANCE Q2 2020
|
PRFS202003407
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
04/13/2020
|
|
:
Fire Suppression System
:
Replacing Fire Suppression Control Panel.
|
PRFS202003277
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Fire Suppression System
:
Convert 12 upright heads to pendents for new ceilings being installed as part of a bathroom area remodel project
|
PRMH202002365
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
03/13/2020
|
|
:
Mechanical
:
Provide Engineered Drawings for Permits and Construction for installation of a new 10,000 CFM air handling unit, supply ductwork, return grilles in perimeter walls and HEPA filters.
|
PREL202002263
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/09/2020
|
|
:
Electrical
:
Factory, shop or building Quarterly Permit 4/1-6/30/20
|
PREL202002148
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/05/2020
|
|
:
Electrical
:
JOB 83615-1108 POLAR SEMICONDUCTOR FACILITY OFFICE AND BREAKROOM REMODEL - SITE CONTACT CORY DOYLE 612-804-0909.
|
PREL202002147
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/12/2020
|
|
:
Electrical
:
JOB 83615-1106 POLAR SEMICONDUCTOR P1 SECONDARY CHILLED WATER PUMPS - SITE CONTACT CORY DOYLE 612-804-0909
|
PRBD202001372
|
Building
|
Alteration/Repair/Replace
|
Expired
|
03/13/2020
|
|
:
Building
:
P1 Storage Modification
|
PRBD202001313
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
03/02/2020
|
|
:
Building
:
Polar Semiconductor Fab 3 Modifications
|
PRMH202000452
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
01/16/2020
|
|
:
Mechanical
:
Relocate Air Handling Unit to Backmetal Etch Room
|
PRMH202000451
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
01/16/2020
|
|
:
Mechanical
:
Install Fan Coil Unit & Ductwork
|
PREL202000170
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/07/2020
|
|
:
Electrical
:
JOB 83615 POLAR FAB QUARTERLY MAINTENANCE Q1 2020
|
PRMH202000166
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
01/09/2020
|
|
:
Mechanical
:
Relocate existing fan and run new exhaust duct to new bulk chemical room and add exhaust to new delivery modules. Add make up air from existing duct with new reheat coil.
|
PRMH202000165
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
01/09/2020
|
|
:
Mechanical
:
Ongoing Maintenance at Polar Semiconductors Inc.
|
PREL201914849
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/12/2019
|
|
:
Electrical
:
Quarterly Permit, 1st quarter 2020
|
PREL201914593
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/06/2019
|
|
:
Electrical
:
JOB 83615-1088 DYSC UPS/ASML PANEL POWER PROTECTION DEVICE
(UPPER Mechanical Level) P3 ASML Panel (2BB15H1) Power Protection Device Installation
In P3 Upper Mechanical Level, place equipment and modify circuit’s runs as noted:
• Place Allen Bradley DySC Dynamic Voltage Sag Corrector on supplied pad.
• Disconnect feed from 480V-400/231Y transformer which feeds panelboard 2BB15H1, demo back (2) 2” conduits which contain 3/0 wire back approximately 8 feet, mount 24” x 24” splice box, re-pipe to transformer.
• Pipe from splice box approximately 40’ with two (2) pairs of two (2) 2” conduits to new Allen Bradly DySC Dynamic Voltage Sag Corrector and back to the splice box.
• Re feed and make splices for feed to AB DySC and output of DySC back to Transformer.
• Make all connections on AB DySC system per manufacturer’s recommendations.
|
PRFS201913106
|
Fire Suppression System
|
Other
|
Expired
|
12/19/2019
|
|
:
Fire Suppression System
:
Provide a new wet system (sprinklers, piping, & hangers) for the south fab area (main level).
|
PREL201912988
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
12/19/2019
|
|
:
Electrical
:
BACKMETAL AND PACKG RM LAB - UPPER MECHANICAL LEVEL WEST DISTRIBUTION MAIN PANELBOARD 2EE8H1/2EEL1
JOB 83615-1076 POLARSEMI
|
PREL201912987
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
11/01/2019
|
|
:
Electrical
:
ECLIPSE 302S SWITCHGEAR
JOB 83615-1074 POLARSEMI -
|
PREL201911514
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/01/2019
|
|
:
Electrical
:
JOB 83615 POLARFAB QUARTERLY MAINTENANCE Q4 2019
|
PREL201910857
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/16/2019
|
|
:
Electrical
:
Quarterly maintenance - 4th quarter 2019
|
PRMH201909848
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
09/05/2019
|
|
:
Mechanical
:
Maintenance
|
PREL201907197
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/02/2019
|
|
:
Electrical
:
JOB 83615 POLAR FAB QUARTERLY MAINTENANCE Q3 2019
|
PREL201906716
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/10/2019
|
|
:
Electrical
:
Quarterly Maintenance - 3rd quarter of 2019
-Permit expired - one time re-issued. MV 3/9/2020
|
PRPL201906307
|
Plumbing
|
Alteration/Repair/Replace
|
Expired
|
06/13/2019
|
|
:
Plumbing
:
Maintenance Work at Polar Fab (T & M)
|
PRMH201904426
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Closed
|
05/09/2019
|
|
:
Mechanical
:
Miscellaneous Maintenance
|
PREL201903486
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/18/2019
|
|
:
Electrical
:
JOB 83611031 ECCLIPSE 8
|
PREL201903485
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/18/2019
|
|
:
Electrical
:
JOB 83615-1026 ECLIPSE 7
|
PRMH201903425
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Closed
|
04/17/2019
|
|
:
Mechanical
:
Maintenance work. See attached in documents and images.
|
PRDE201903346
|
Demolition
|
Alteration/Repair/Replace
|
Expired
|
05/03/2019
|
|
:
Demolition
:
Client will be decommissioning a clean room within their existing facility. Work will include HVAC duct and process line removal and temporary wall panel (unistruct) removal. HVAC duct will be cleaned and disposed of as scrap metal. There will be hazard materials conductors removed as part of the demolition.
No structural components will be demolished.
|
PREL201903341
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/22/2019
|
|
:
Electrical
:
Install new illuminated building sign.
|
PREL201903010
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/08/2019
|
|
:
Electrical
:
JOB 83615 POLARFAB QUARTERLY MAINTENANCE Q2 2019
|
PRPS201902614
|
Sign, Permanent
|
New Sign
|
Finaled
|
04/15/2019
|
|
:
Sign
:
Furnish and install (1) LED face illuminated raceway mount letter set on East elevation.
Furnish and install (1) non-illuminated, reverse channel aluminum letter set on South elevation.
|
PREL201902488
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/02/2019
|
|
:
Electrical
:
2nd quarter maint.
|
PRMH201902267
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Closed
|
03/19/2019
|
|
:
Mechanical
:
Maintenance work.
|
PRFS201901593
|
Fire Suppression System
|
Other
|
Finaled
|
02/27/2019
|
|
:
Fire Suppression System
:
Provide start up and testing of a pre-installed CO2 system on a wet bench.
|
PREL201901558
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/22/2019
|
|
:
Electrical
:
JOB 83615-1019 GENERATOR ELECTRICAL WORK
|
PREL201901557
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/22/2019
|
|
:
Electrical
:
JOB 83615 POLARFAB QUARTERLY MAINTENANCE Q1 2019
|
PRMH201901440
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Closed
|
02/19/2019
|
|
:
Mechanical
:
Quarterly maintenance work.
|
PRMH201900685
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Closed
|
01/23/2019
|
|
:
Mechanical
:
Maintenance work. See attached submittals for items.
|
PRWE201900199
|
Well
|
Other
|
Finaled
|
01/07/2019
|
|
:
Well
:
Annual Monitoring well maintenance permit
|
PREL201815496
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/07/2019
|
|
:
Electrical
:
Quarterly maintenace. First quarter.
(paper application)
|
PRMH201815293
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
12/18/2018
|
|
:
Mechanical
:
Maintenance work.
(paper application, portal user)
|
PRMH201814371
|
Mechanical/HVAC
|
Repair/Replace
|
Closed
|
11/20/2018
|
|
:
Mechanical
:
Maintneance work. (VTC- Polar Semi Conductor)
|
PRFS201813345
|
Fire Suppression System
|
Other
|
Finaled
|
10/25/2018
|
|
:
Fire Suppression System
:
Relocate 4 heads for new ceilings, 1 for 1. All work on 2nd Floor server room. Polar Fab.
(paper application)
|
PRMH201812785
|
Mechanical/HVAC
|
Repair/Replace
|
Closed
|
10/17/2018
|
|
:
Mechanical
:
maintenance work. 3rd quarter.
|
PRFS201812352
|
Fire Suppression System
|
Repair/Replace
|
Finaled
|
11/07/2018
|
|
:
Fire Suppression System
:
Installation of clean agent in new server room.
|
PREL201812350
|
Electrical
|
Repair/Replace
|
Finaled
|
10/11/2018
|
|
:
Electrical
:
Installing clean agent system in new server room.
|
PRMH201811365
|
Mechanical/HVAC
|
Other
|
Closed
|
09/25/2018
|
|
:
Mechanical
:
Maintenance work. List scanned and attached. Polar Semiconductor.
|
PREL201811247
|
Electrical
|
Alteration/Remodel
|
Finaled
|
10/08/2018
|
|
:
Electrical
:
JOB 83506 POLAR SEMI SUBSTATION 3 In P3 Main Electrical room:
• Rig and place the three (3) new sections of S&C switchgear to the Northwest corner of the room on the existing housekeeping pad. Assemble per manufacturer’s instructions. Connect the 13.8kV circuit from the Bay 1 tap box in the main gear to the Bay3 tap box in the expansion gear using existing conduit routed below floor with 3- 4/0, 1 #4G, CU, 15kV, EPR, lead free, 133%, MV-105, tape shield Southwire spec 46302, alternate vendors include Aetna Insulated Wire, Inc., General Cable Technologies Corp., Okonite Company, Prysmian Cables and Systems.
o Termination kits shall be 3M Cold Shrink QT-III series. Provide six (6) spare sets of termination kits.
o The 13.8kV conductors shall be acceptance tested with VLF AC withstand testing per the manufacturers recommendations.
In P3 Upper Mechanical Area, place the components of Substation #3 on housekeeping pads, this would include the Medium Voltage Main Switch, 4000kVA dry transformer and mating 480V panelboards. This will also include the 480V / 208Y 500Kva transformer w/Main, as well as the 208Y / 1600A distribution panel and the 480V / 800A distribution panel, assemble per manufacturer’s instructions.
Extend the 13.8kV 150A feeder conduit from its current location at floor level on the North side of the first floor Phase2 expansion cleanroom area and extend feeder conduit up (~32 feet) to the Upper Mechanical Level and route to the location of the new Substation #3, Medium Voltage Disconnect Main switch.
From the new S&C gear in the Northwest corner of the main electrical room, BAY1: Provide a 13.8kV feeder to the unit substation Medium Voltage Disconnect switch.
a. Conductors shall be #1/0, CU, 15kV, EPR, lead free, 133%, MV-105, tape shield Southwire spec 46302 or approved equivalent (alternate suppliers mentioned above).
b. Conduit for 13.8kV feeder shall be painted red and labeled “HIGH VOLTAGE”. Lettering height shall be approximately 25% of the circumference of the conduit. Labels shall be in each room the conduit passes through and shall not exceed 50’ spacing between labels.
• Extend the 13.8kV conduit from its current location at floor level on the South side of the first floor Phase 1 cleanroom, up the wall ~10’ to a future tap box (provided).
o Provide 13.8kV feeder from new S&C gear in the Northwest corner of the main electrical room, BAY2 to the tap box added above, conductors to follow same specification above.From Substation#3 run circuits to locations for:
• One (1) 480V / 800A circuit to the main inlet on the 208Y 500kVA transformer w/Main.
• Connect the output of the 500kVA 208V transformer to the 1600A distribution panelboard.
• One (1) 480V / 800A circuit to the inlet of the 480V / 800A distribution panelboard.
|
PRMH201810933
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
09/17/2018
|
|
:
Mechanical
:
Install Aquatherm piping for the chilled water system and Propress copper on the condensate drain. Install pumps, balancing valves, and flow switch.
A building permit has been issued (PRBD201808337)
|
PREL201810606
|
Electrical
|
Other
|
Finaled
|
09/19/2018
|
|
:
Electrical
:
Quarterly maintenance - 4th quarter.
|
PREL201810009
|
Electrical
|
Repair/Replace
|
Finaled
|
09/13/2018
|
|
:
Electrical
:
electrical work in the data center- install 30 0-100 amp feeder/circuits and 1 45 KVA transformer.
|
PRMH201809818
|
Mechanical/HVAC
|
Repair/Replace
|
Closed
|
08/28/2018
|
|
:
Mechanical
:
Maintenance work - included and attached list. Scanned list to submittals.
|
PRBD201808337
|
Building
|
Alteration/Remodel
|
Finaled
|
08/28/2018
|
|
:
Building
:
Remodel 650 sf of floor space on the second floor of the building. The remodel will include the following: Installation of a new concrete floor, Demolition of two offices, New walls and ceiling, Modify the existing Fire protection system, Installation of two computer room Air Conditioners, Installation of two Uninterruptible Power Supply Systems, Installation of Computer Racks.
|
PRMH201808042
|
Mechanical/HVAC
|
Repair/Replace
|
Closed
|
07/30/2018
|
|
:
Mechanical
:
Maintenance Work - Polar semi conductor (List in Submittals)
|
PRPL201807979
|
Plumbing
|
Alteration/Remodel
|
Expired
|
08/02/2018
|
|
:
Plumbing
:
Extend 4" sanitary sewer service for air handler condensate drains and floor drain. Please contact Randy Asher at (651) 488-5561 with any questions.
|
PRMH201806697
|
Mechanical/HVAC
|
Other
|
Closed
|
07/02/2018
|
|
:
Mechanical
:
Maintenance work. Repairs to exhaust ducts, trash compactor, novellus 312 relocation, Tel 310 relocation, ASML - 305, P3 cooling storage vent, P-3 admin AHU
|
PRMH201806114
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
06/19/2018
|
|
:
Mechanical
:
P-3 Penthouse AHU installation. Penthouse hvac.
|
PRMH201806111
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
06/19/2018
|
|
:
Mechanical
:
P-3 Admin air handout united install. Warehouse hvac.
|
PREL201805826
|
Electrical
|
Repair/Replace
|
Finaled
|
06/18/2018
|
|
:
Electrical
:
Quarterly Maintenance - 3rd quarter 2018
|
PRMH201804594
|
Mechanical/HVAC
|
Other
|
Closed
|
05/18/2018
|
|
:
Mechanical
:
Maintenance work - VTC Polar Semiconductor. Quarter not specified (3rd)?
|
PRMH201804058
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
05/04/2018
|
|
:
Mechanical
:
Substation cooling
|
PREL201803660
|
Electrical
|
Alteration/Remodel
|
Finaled
|
05/04/2018
|
|
:
Electrical
:
Job 83473 Polar Semiconductor photo phase 2 RAU's.
|
PRMH201803577
|
Mechanical/HVAC
|
Repair/Replace
|
Permit(s) Issued
|
04/23/2018
|
|
:
Mechanical
:
maintenace work
|
PRFS201802464
|
Fire Suppression System
|
Alteration/Remodel
|
Finaled
|
04/09/2018
|
|
:
Fire Suppression System
:
Convert 8 upright heads to pendent heads for bathroom addition in PIII Building. Polar Semiconductor.
|
PRMH201802387
|
Mechanical/HVAC
|
Repair/Replace
|
Permit(s) Issued
|
03/26/2018
|
|
:
Mechanical
:
Maintenance work - per the attachement, misc exhaust duct repairs, implant exhause consolidation, ASML 100-302 relocation, solvent waste cabinet relocation, install Novellus 311.
|
PREL201802031
|
Electrical
|
Repair/Replace
|
Finaled
|
03/19/2018
|
|
:
Electrical
:
Quarterly Maintenance-2nd quarter-2018
|
PRMH201801816
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
03/05/2018
|
|
:
Mechanical
:
Furnish and install exhaust duct work, transfer duct work, exhaust grilles and transfer grilles
|
PRMH201801584
|
Mechanical/HVAC
|
Other
|
Permit(s) Issued
|
02/26/2018
|
|
:
Mechanical
:
quarterly maintenance work.
Solvent waste cabinet relocation. ASML 100-302 relocation. Immplant exhaust consolidation. AME maintenance exhaust. Mis exhaust duct repairs.
|
PRWE201800959
|
Well
|
Other
|
Finaled
|
02/08/2018
|
|
:
Well
:
Annual monitoring well maintenance permit. (6/16/16 - 6/15/17)
|
PREL201800927
|
Electrical
|
Alteration/Remodel
|
Finaled
|
02/02/2018
|
|
:
Electrical
:
Bathroom project (Job 9015353)
|
PREL201800925
|
Electrical
|
Alteration/Remodel
|
Finaled
|
02/07/2018
|
|
:
Electrical
:
Job 83460 - Polar Semiconductor, unit substation install
|
PRMH201800617
|
Mechanical/HVAC
|
Repair/Replace
|
Permit(s) Issued
|
01/22/2018
|
|
:
Mechanical
:
Maintenance Work
|
PRMH201800276
|
Mechanical/HVAC
|
Repair/Replace
|
Closed
|
01/11/2018
|
|
:
Mechanical
:
Phase 2 Photo Bay-Phase 2 Etch Bay
Phase 2 Films Bay-Photo West
Phase 2 Solvent/General Exhaust
Phase 2 Corrosive Exhaust
Phase 2 Make-Up Air, Phase 1 Make Up Air
|
PRMH201800226
|
Mechanical/HVAC
|
Repair/Replace
|
Permit(s) Issued
|
01/11/2018
|
|
:
Mechanical
:
Install (2) regulators for the Fulton boilers.
|
PRBD201800166
|
Building
|
Alteration/Remodel
|
Finaled
|
01/26/2018
|
|
:
Building
:
Build out toilet rooms in P3 Wing of building
|
PRPL201800161
|
Plumbing
|
Alteration/Remodel
|
Finaled
|
01/10/2018
|
|
:
Plumbing
:
Add mens and womens rest rooms and drinking fountains. Polar Semiconductor
|
PRMH201712150
|
Mechanical/HVAC
|
Repair/Replace
|
Permit(s) Issued
|
12/27/2017
|
|
:
Mechanical
:
Maintenance work.
|
PREL201712075
|
Electrical
|
Repair/Replace
|
Finaled
|
01/03/2018
|
|
:
Electrical
:
ALPHA311 power
|
PREL201712071
|
Electrical
|
Repair/Replace
|
Finaled
|
01/03/2018
|
|
:
Electrical
:
first quarterly maintenance 2018
|
PRMH201711294
|
Mechanical/HVAC
|
Other
|
Closed
|
11/27/2017
|
|
:
Mechanical
:
Maintenance (time and material work).
|
PRPL201711209
|
Plumbing
|
Repair/Replace
|
Finaled
|
11/21/2017
|
|
:
Plumbing
:
Rebuild 2 RPZ's. Serial #41575 in Penthouse for Humidifier. Serial #41083 in PF2 Penthouse for Chiller.
|
PRBD201710562
|
Building
|
Alteration/Remodel
|
Finaled
|
11/01/2017
|
|
:
Building
:
Steel stud gypsum board partitions to enclose electrical gear. Polar Semiconductor electrical room. OTC
|
PRMH201709780
|
Mechanical/HVAC
|
Repair/Replace
|
Permit(s) Issued
|
10/17/2017
|
|
:
Mechanical
:
Maintenance (time and material)
|
PRBD201709545
|
Building
|
Alteration/Remodel
|
Finaled
|
12/04/2017
|
|
:
Building
:
Clean Room addition - Phase 2- Polarfab 3
|
PRMH201708736
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
09/20/2017
|
|
:
Mechanical
:
P-3 Phase 2 Diffusion Expansion.
|
PRMH201708625
|
Mechanical/HVAC
|
Repair/Replace
|
Permit(s) Issued
|
09/14/2017
|
|
:
Mechanical
:
Maintenance (Time and Material Work)
|
PREL201708615
|
Electrical
|
Alteration/Remodel
|
Finaled
|
09/15/2017
|
|
:
Electrical
:
MRL326 Power
Permit extended by Nick Mauk - still working on project. vcarlson 03/06/2018 10:37 AM
|
PREL201708614
|
Electrical
|
Other
|
Finaled
|
09/15/2017
|
|
:
Electrical
:
Quarterly maintenance - 4th quarter 2017.
|
PREL201708613
|
Electrical
|
Alteration/Remodel
|
Finaled
|
09/15/2017
|
|
:
Electrical
:
NOVEL326 Power
|
PREL201708612
|
Electrical
|
Alteration/Remodel
|
Finaled
|
09/15/2017
|
|
:
Electrical
:
MRL325 Power
|
PREL201708611
|
Electrical
|
Alteration/Remodel
|
Finaled
|
09/15/2017
|
|
:
Electrical
:
Phase 2 Diffusion Bay
Permit extended by Nick Mauk - still working on project. vcarlson 03/06/2018 10:37 AM
|
PRFS201707779
|
Fire Suppression System
|
Other
|
Permit(s) Issued
|
08/31/2017
|
|
:
Fire Suppression System
:
Offset 6 existing branch lines for new structural steel/floor openings and add 6 heads.
|
PRMH201707687
|
Mechanical/HVAC
|
Repair/Replace
|
Permit(s) Issued
|
08/22/2017
|
|
:
Mechanical
:
Maintenance (time and material work)
|
PRBD201707178
|
Building
|
Alteration/Remodel
|
Finaled
|
09/15/2017
|
|
:
Building
:
Clean room addition, Polarfab 3.
|
PRMH201706221
|
Mechanical/HVAC
|
Other
|
Permit(s) Issued
|
07/18/2017
|
|
:
Mechanical
:
Maintenance
|
PRMH201705929
|
Mechanical/HVAC
|
Alteration/Remodel
|
Permit(s) Issued
|
10/19/2017
|
|
:
Mechanical
:
Install piping to existing chiller and cooling towers.
|
PRST201705861
|
Structural
|
Other
|
Finaled
|
08/01/2017
|
|
:
Building
:
Steel reinforcement for slab penetrations.
|
PREL201705159
|
Electrical
|
Repair/Replace
|
Finaled
|
06/20/2017
|
|
:
Electrical
:
Add outlets- 18 circuits.
|
PRMH201705158
|
Mechanical/HVAC
|
Repair/Replace
|
Permit(s) Issued
|
06/19/2017
|
|
:
Mechanical
:
Quarterly maintenance Job #301557
|
PREL201704890
|
Electrical
|
Alteration/Remodel
|
Finaled
|
06/16/2017
|
|
:
Electrical
:
EPI11-12 Power
|
PREL201704889
|
Electrical
|
Alteration/Remodel
|
Finaled
|
06/16/2017
|
|
:
Electrical
:
NOVEL315 power.
|
PREL201704887
|
Electrical
|
Other
|
Finaled
|
06/16/2017
|
|
:
Electrical
:
3rd Quarter Maintenance Permit - Polar Semiconductor.
|
PRMH201703828
|
Mechanical/HVAC
|
Other
|
Permit(s) Issued
|
05/18/2017
|
|
:
Mechanical
:
Maintanance (time and material work). Job 301405. Time frame not provided.
|
PRMH201703602
|
Mechanical/HVAC
|
Alteration/Remodel
|
Finaled
|
05/11/2017
|
|
:
Mechanical
:
Install 1 ton ductless split to condition elevator machine room at Polar Semi-conductor.
|
PREL201703357
|
Electrical
|
Repair/Replace
|
Finaled
|
05/15/2017
|
|
:
Electrical
:
Quarterly Maintenance 2nd Quarter 2017 ( April - June)
|
PRMH201702600
|
Mechanical/HVAC
|
Other
|
Closed
|
04/18/2017
|
|
:
Mechanical
:
Maintenance
|
PRMH201701540
|
Mechanical/HVAC
|
Alteration/Remodel
|
Finaled
|
03/17/2017
|
|
:
Mechanical
:
Maintenence on duct work.
|
PRMH201700500
|
Mechanical/HVAC
|
Repair/Replace
|
Closed
|
02/13/2017
|
|
:
Mechanical
:
Maintenance (Time and Material Work)
|
PREL201700045
|
Electrical
|
Repair/Replace
|
Finaled
|
02/13/2017
|
|
:
Electrical
:
TEL311 Power
|
PREL201700044
|
Electrical
|
Repair/Replace
|
Finaled
|
02/13/2017
|
|
:
Electrical
:
Quarterly Maintenance, 1st Quarter 2017
|
PREL201700039
|
Electrical
|
Repair/Replace
|
Finaled
|
02/13/2017
|
|
:
Electrical
:
AME328 Power
|
PREL201700032
|
Electrical
|
Repair/Replace
|
Finaled
|
02/13/2017
|
|
:
Electrical
:
Alpha312 Power
|