Property Review

Parcel ID: 0102724410024


Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Property Details

0102724410024
Active
V T C ADDITION Lot: 1 Block: V T C ADDITION Parcel Description: EXCEPT THAT PART OF SAID LOT 1, WHICH LIES NORTHWESTERLY OF LINE 1 DESCRIBED BELOW: LINE 1: BEGINNING AT A POINT ON THE WEST LINE OF SAID LOT 1, DISTANT 60 FEET SOUTHERLY OF THE NORTHWEST CORNER THEREOF; THENCE RUN NORTHEASTERLY TO A POINT ON THE NORTH LINE OF SAID LOT 1, DISTANT 291.83 FEET EASTERLY OF SAID NORTHWEST CORNER AND THERE TERMINATING SUBJECT TO STREETS

Addresses

Street # Pre-Direction Street Name Direction Unit # Status
2800 E OLD SHAKOPEE RD Active
8201 WINSTEAD WAY Active

Contacts

Type Description
Property Owner POLAR SEMICONDUCTOR INC, Address:8201 WINSTEAD WAY
Historic Owner Nick Mauk , Address:POLAR SEMICONDUCTOR INC, Phone:(763) 229-0612
Historic Owner POLAR SEMICONDUCTOR INC, Address:2800 E OLD SHAKOPEE RD

Zone (COMMERCIAL OFFICE 1.0 (CO-1))

COMMERCIAL OFFICE 1.0 (CO-1)
Historic

Zone (Planned Development (PD))

Planned Development (PD)
Active

Zone (Airport Runway (AR-17))

Airport Runway (AR-17)
Active

Zone (INNOVATION AND TECHNOLOGY (IT))

INNOVATION AND TECHNOLOGY (IT)
Active

Permit Applications

Application Number Type Work Class Status Date Issued
PRBD202504115 Building Alteration/Repair/Replace In Plan Check
: Building

: Demo conference room and divide into 3 separate rooms on 3rd floor. 2nd floor Adding two walls for a private office space
PRFS202504042 Fire Suppression System Other In Plan Check
: Fire Suppression System

: FLuoro-K fire suppression system in the electrical rooms
PREL202503185 Electrical Alteration/Repair/Replace Permit(s) Issued 04/01/2025
: Electrical

: JOB 820393 POLARFAB Q2 ELECTRICAL MAINTENANCE
PREL202503166 Electrical Alteration/Repair/Replace Permit(s) Issued 03/31/2025
: Electrical

: Simplex FA Remodel Phase 3
PRAL202503164 Fire Alarm Alteration/Repair/Replace Permit(s) Issued 04/15/2025
: Fire Alarm

: Simplex FA Remodel Phase 3
PRBD202503084 Building Addition In Plan Check
: Building

: Polar Semiconductor is proposing an addition to existing building P1 that would include a two-stop passenger elevator that connects Lower Level to First Level. This elevator is to improve pedestrian flow between the clean rooms on the two levels. This elevator is not part of the building egress. This permit application is for Phase 5 scope of work only.
PRUT202502782 Utility Alteration/Repair/Replace Ready for Issuance
: Utility

: Complete remodel of Polar Semiconductor mechanical systems and cleanrooms. We already have plumbing and mechanical permits pulled. This permit is for the (2) waste water meters needed to monitor Polar's additional well water waste going to city sanitary. We need (2) 4" waste water meters.
PRMH202502595 Mechanical/HVAC Alteration/Repair/Replace Permit(s) Issued 03/31/2025
: Mechanical

: Oct 24 through February 25 On-Site Mechanical Work
PRMH202501907 Mechanical/HVAC Alteration/Repair/Replace Permit(s) Issued 03/03/2025
: Mechanical

: Replacing VAVs, ductwork and GRDs with new ones per plan sheet.
PREL202501608 Electrical Alteration/Repair/Replace Permit(s) Issued 02/19/2025
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit 2024 Q4 Work to be completed by Nick Mauk (License No AM007747)
PREL202501607 Electrical Alteration/Repair/Replace Permit(s) Issued 02/19/2025
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit 2025 Q1 Work to be completed by Nick Mauk (License No AM007747)
PREL202501440 Electrical Alteration/Repair/Replace Permit(s) Issued 02/18/2025
: Electrical

: Install replacement fire alarm.
PRAL202501439 Fire Alarm Alteration/Repair/Replace Permit(s) Issued 03/27/2025
: Fire Alarm

: Simplex fire alarm remodel.
PREL202501224 Electrical Alteration/Repair/Replace Finaled 02/12/2025
: Electrical

: Zone 1 Only - Split Office in half. Rework lighting fixtures and adding receptacles to existing circuits
PRFS202500919 Fire Suppression System Alteration/Repair/Replace Permit(s) Issued 02/26/2025
: Fire Suppression System

: New cleanrooms are being built in which we are dropping new heads into Cleanrooms are being remodeled and heads are add/relocated New office space buildouts in which heads are being add/relocated Brand new electrical room being built which will be protected by a new double interlocked pre-action system New Gas room buildout that will be protected by a new double interlocked pre-action system Existing loading dock protected by dry heads will be infilled and new wet heads will be add/relocated
PRBD202500612 Building Alteration/Repair/Replace Finaled 02/05/2025
: Building

: Zone 1 Only – Split office in half, added walls to deck, redo ceiling grid/tile (2x2), patch/mud and paint
PREL202416742 Electrical Alteration/Repair/Replace Finaled 01/06/2025
: Electrical

: JOB 820393 2025 Q1 ELECTRICAL PERMIT
PRBD202416157 Building Alteration/Repair/Replace In Plan Check
: Building

: Installation of a 6 and 8' high black vinyl fence along north property line parallel to park and ride garage.
PREL202415634 Electrical Alteration/Repair/Replace Permit(s) Issued 12/18/2024
: Electrical

: JOB 81609 POLAR FAB CLEAN ROOM REMODEL WITH NEW ELECTRICAL SERVICES
PRBD202415268 Building Alteration/Repair/Replace Ready for Issuance
: Building

: Polar Semiconductor is proposing an interior remodel of existing buildings P1, p2, and P3 and a 3,750 square foot electrical room addition between buildings P2 and P3. The project aims to improve Polar Semiconductor's manufacturing capabilities and increase the production of semiconductor products. This permit application is for Phase 4 scope of work only. The scope in Bid Pack 7 is slated for Phase 4 of the construction work at Polar. Scope includes remodel of cleanrooms on lower level and first level of P1.
PRUT202415077 Utility New Permit(s) Issued 11/15/2024
: Utility

: Remove existing manhole and section of 12" RCP, replace manhole with 5'x3' box structure and reinstall section of 12" RCP. Raise rim of existing CB and connect 6" PVC roof drain to existing CB.
PRMH202414207 Mechanical/HVAC Alteration/Repair/Replace Permit(s) Issued 11/25/2024
: Mechanical

: Cleanroom and Infrastructure Remodel throughout 3 existing buildings.
PRPL202414202 Plumbing Alteration/Repair/Replace Permit(s) Issued 11/25/2024
: Plumbing

: Remodel of 3 existing buildings.
PRMH202414198 Mechanical/HVAC Alteration/Repair/Replace Finaled 11/25/2024
: Mechanical

: Maintenance
PREL202413778 Electrical Alteration/Repair/Replace Permit(s) Issued 10/18/2024
: Electrical

: JOB 81609 POLAR SEMICONDUCTOR - PROVIDE TEMP POWER FROM BUILDING FOR JOBSITE TRAILERS
PREL202413084 Electrical Other Finaled 10/08/2024
: Electrical

: JOB 87769 POLARFAB Q4 ELECTRICAL MAINTENANCE
PREL202408455 Electrical Other Finaled 07/01/2024
: Electrical

: JOB 820068 POLARFAB 2024 Q3 MAINT
PRFS202408227 Fire Suppression System Alteration/Repair/Replace Finaled 07/15/2024
: Fire Suppression System

: Replace the existing branch lines with 2" lines instead of the existing 1 1/2" lines. New 16.8 K heads will also be installed.
PREL202408037 Electrical Alteration/Repair/Replace Expired 06/21/2024
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit 2024 - Q3 Work to be completed by Nick Mauk (License No AM007747)
PRTC202406039 Tent/Canopy Other Finaled 05/09/2024
: Tent/Canopy

: 20'x20' full sidewall up for Polar Semiconductor 5/13 event.
PRBD202405941 Building Alteration/Repair/Replace Permit(s) Issued 10/04/2024
: Building

: Phase II - Infill existing loading dock with processed chilled water plant and exterior wall assembly, MEP upgrades in Phase III - Remodeling existing manufacturing areas, adding interior H-4 gas room, adding prayer/ablution rooms, remodeling accessible toilet rooms. Polar Semiconductor is proposing an interior remodel of existing buildings P1, P2, and P3 and a 3,750 square foot electrical room addition between buildings P2 and P3. The project aims to improve Polar Semiconductor’s manufacturing capabilities and increase the production of semiconductor products. The project will be executed throughout multiple phases with construction occurring over the course of multiple years. Roughly ninety percent of the scope of work is interior remodeling, mechanical/electrical upgrades, and tool installations for Polar Semiconductor’s manufacturing processes.
PREL202403619 Electrical Other Finaled 03/27/2024
: Electrical

: JOB 820068 2024 POLAR SEMICONDUCTOR Q2 ELECTRICAL MAINTENANCE
PREL202403067 Electrical Alteration/Repair/Replace Expired 03/14/2024
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit 2024 Q2 Work to be completed by Nick Mauk (License No AM007747)
PRTC202402393 Tent/Canopy Other Finaled 03/05/2024
: Tent/Canopy

: Tent installation for Polar Semiconductor on 3/07, one 5M X 10M
PRFS202400691 Fire Suppression System Other Finaled 02/05/2024
: Fire Suppression System

: Remove Branch Lines and Install new Branch Lines and Heads on an existing system. All mains are existing and are to remain.
PREL202315689 Electrical Other Finaled 01/02/2024
: Electrical

: JOB 820068 POLARFAB Q1 ELECTRICAL MAINTENANCE PERMIT
PREL202314076 Electrical Alteration/Repair/Replace Expired 11/17/2023
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit 2024 Q1 Work to be completed by Nick Mauk (License No AM007747)
PRBD202312397 Building Other Expired 11/02/2023
: Building

: Adding a curb/pad for owner provided caustic tank. Scope to include helical pier installation.
PRCRF202312087 Roof, Commercial Alteration/Repair/Replace Finaled 10/10/2023
: Roofing

: Reroof of 2500Sf Tear existing roof off down to metal deck and replace with new insulation and EPDM membrane.
PREL202311648 Electrical Alteration/Repair/Replace Expired 09/26/2023
: Electrical

: JOB 87769 POLARFAB Q4 ELECTRICAL MAINTENANCE
PREL202311282 Electrical Alteration/Repair/Replace Expired 09/19/2023
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit 2023 Q4 Work to be completed by Nick Mauk (License No AM007747)
PREL202311280 Electrical Alteration/Repair/Replace Expired 09/19/2023
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit 2023 Q3 Work to be completed by Nick Mauk (License No AM007747)
PREL202311279 Electrical Alteration/Repair/Replace Expired 09/19/2023
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit 2023 Q2 Work to be completed by Nick Mauk (License No AM007747)
PRMH202310261 Mechanical/HVAC Alteration/Repair/Replace Expired 09/13/2023
: Mechanical

: Maintenance.
PRBD202307899 Building Addition Permit(s) Issued 10/04/2024
: Building

: PHASE 1 - Polar Semiconductor is proposing an interior remodel of existing buildings P1, P2, and P3 and a 3,750 square foot electrical room addition between buildings P2 and P3. The project aims to improve Polar Semiconductor’s manufacturing capabilities and increase the production of semiconductor products. This permit application is for Phase 1 scope of work only. The project will be executed throughout multiple phases with construction occurring over the course of multiple years. Roughly ninety percent of the scope of work is interior remodeling, mechanical/electrical upgrades, and tool installations for Polar Semiconductor’s manufacturing processes. The electrical room addition includes on-grade exterior transformers within an electrical yard. There will be modifications to the site to reconfigure underground utilities and provide additional hardscape and softscape, including a safety fence at the perimeter.
PREL202307811 Electrical Alteration/Repair/Replace Finaled 07/18/2023
: Electrical

: JOB 87769 Q3 ELECTRICAL MAINTENANCE
PRROWU202307761 ROW Underground N/A Warranty 08/02/2023
: Right-of-Way

: Directional bore 250' to place a new 2" conduit with fiber cable and place one new 30"x48"x36" handhole.
PRWE202306102 Well Other Finaled 06/07/2023
: Well

: Soil boring for testing
PRTC202304161 Tent/Canopy Other Finaled 05/02/2023
: Tent/Canopy

: Installing one 30' X 50' on 5/04, removal 5/10
PREL202302586 Electrical Alteration/Repair/Replace Finaled 03/29/2023
: Electrical

: JOB 87769 Q2 ELECTRICAL MAINTENANCE POLAR SEMICONDUCTOR
PREL202300073 Electrical Alteration/Repair/Replace Finaled 01/05/2023
: Electrical

: JOB 87459 POLARFAB Q1 2023 ELECTRICAL MAINTENANCE
PRWE202215765 Well Other Finaled 12/29/2022
: Well

: Annual monitoring well maintenance permit for 2023.
PREL202215434 Electrical Alteration/Repair/Replace Expired 12/22/2022
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit - 2022 Q4 Work to be completed by Nick Mauk (License No AM007747) Locations
PRTP202214961 Tank/Pipe Install/Removal Other Expired 12/28/2022
: Tank

: Connect 2 - 420# cylinders to 2 - 350,000 btu heaters
PRTC202214537 Tent/Canopy Other Finaled 11/28/2022
: Tent/Canopy

: Tent installation for one 15M x 10M on 12/05.
PREL202212480 Electrical Alteration/Repair/Replace Expired 10/06/2022
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit - 2022 Q4. Work to be completed by Nick Mauk (License No AM007747)
PREL202212479 Electrical Alteration/Repair/Replace Expired 10/06/2022
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit - 2022 Q3. Work to be completed by Nick Mauk (License No AM007747)
PREL202212317 Electrical Other Finaled 10/14/2022
: Electrical

: JOB 87459 POLARFAB QUARTERLY MAINTENANCE Q4
PRPL202210104 Plumbing Alteration/Repair/Replace Finaled 08/17/2022
: Plumbing

: Replace 130' of 6" watermain going from the well head into the BUilding. We will connect to the well head and install C-900 pipe once we get to the building we will put onone stick of ductile with a flange going into the building.
PREL202207850 Electrical Alteration/Repair/Replace Finaled 07/01/2022
: Electrical

: JOB 87459 POLAR FAB QUARTERLY MAINTENANCE Q3
PRROWU202206945 ROW Underground N/A Finaled 07/13/2022
: Right-of-Way

: Directional Drill for placement of (1) 2" conduits, install one new Fiber Vault, and Pull Fiber Through an existing Comcast conduit.
PRBD202206475 Building Alteration/Repair/Replace Expired 07/05/2022
: Building

: Split a single office into two rooms
PRMH202204565 Mechanical/HVAC Alteration/Repair/Replace Expired 05/03/2022
: Mechanical

: Maintenance
PRBD202203163 Building Alteration/Repair/Replace Expired 04/11/2022
: Building

: Construct a single office tenant improvement
PREL202203162 Electrical Alteration/Repair/Replace Finaled 03/30/2022
: Electrical

: JOB 87459 POLARFAB 2022 Q2 ELECTRICAL MAINTENANCE
PREL202202472 Electrical Alteration/Repair/Replace Expired 03/15/2022
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit - 200 Q2. Work to be completed by Nick Mauk (License No AM007747)
PREL202200301 Electrical Alteration/Repair/Replace Finaled 01/11/2022
: Electrical

: JOB 87459 POLAR SEMICONDUCTOR Q1 2022 ELECTRICAL MAINTENANCE
PRWE202116864 Well Other Permit(s) Issued 12/30/2021
: Well

: Annual Well Maintenance Permit
PREL202116256 Electrical Alteration/Repair/Replace Expired 12/13/2021
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit - 2022 Q1. Work to by completed by Nick Mauk (License No AM007747)
PREL202114118 Electrical Alteration/Repair/Replace Finaled 10/21/2021
: Electrical

: JOB 83979 Q4 ELECTRICAL MAINTENANCE - POLAR FAB
PREL202112115 Electrical Alteration/Repair/Replace Finaled 09/14/2021
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit - 2021 Q4. Work to be completed by Nick Mauk (License No AM007747)
PRFS202111394 Fire Suppression System Alteration/Repair/Replace Finaled 08/27/2021
: Fire Suppression System

: Relocate two (2) existing automatic fire sprinklers to be centered in the room, per Polaris Semiconductor's request.
PRBD202108607 Building Alteration/Repair/Replace Finaled 07/22/2021
: Building

: Adding two offices in existing open office space.
PREL202107351 Electrical Alteration/Repair/Replace Finaled 06/14/2021
: Electrical

: Polar Semiconductor Quarterly Maintenance Permit. Work to be completed by Nick Mauk (License No AM007747)
PRMH202104284 Mechanical/HVAC Alteration/Repair/Replace Expired 04/19/2021
: Mechanical

: Maintenance
PRCRF202104106 Roof, Commercial Alteration/Repair/Replace Expired 04/23/2021
: Roofing

: Waterproofing roof 14,800 sf
PREL202103505 Electrical Other Expired 04/02/2021
: Electrical

: JOB 83979 POLARFAB Q2 2021 ELECTRICAL MAINTENANCE.
PREL202102320 Electrical Alteration/Repair/Replace Finaled 03/08/2021
: Electrical

: Quarterly Maintenance Permit for 2021 2nd Quarter
PRWE202100656 Well Other Finaled 01/20/2021
: Well

: Annual Maintenance Permit
PREL202100149 Electrical Alteration/Repair/Replace Finaled 01/07/2021
: Electrical

: JOB 83615 PHASE 1130 POLAR FAB Q1 ELECTRICAL MAINTENANCE
PREL202015711 Electrical Other Finaled 12/30/2020
: Electrical

: Quarterly Maintenance Permit for 2021 1st Quarter
PRMH202014890 Mechanical/HVAC Alteration/Repair/Replace Expired 12/08/2020
: Mechanical

: On-site Labor at Polar Fab Semiconductors
PRMH202011980 Mechanical/HVAC Alteration/Repair/Replace Expired 10/06/2020
: Mechanical

: Maintenance
PREL202011727 Electrical Alteration/Repair/Replace Finaled 10/01/2020
: Electrical

: JOB 83615 POLARFAB Q4 2020 ELECTRICAL MAINTENANCE
PREL202010826 Electrical Alteration/Repair/Replace Finaled 09/25/2020
: Electrical

: Industrial Building - 4th Quarter Maintenance
PRBD202008930 Building Alteration/Repair/Replace Finaled 08/21/2020
: Building

: Partial height gyp board partitions to define a warehouse area.
PREL202007282 Electrical Other Finaled 07/13/2020
: Electrical

: JOB 83615 POLARFAB QUARTERLY MAINT Q3 2020
PREL202005783 Electrical Alteration/Repair/Replace Finaled 06/10/2020
: Electrical

: Quarterly maintenance - 3rd Quarter 2020
PREL202003624 Electrical Alteration/Repair/Replace Finaled 04/20/2020
: Electrical

: JOB 83615 POLARFAB QUARTERLY MAINTENANCE Q2 2020
PRFS202003407 Fire Suppression System Alteration/Repair/Replace Finaled 04/13/2020
: Fire Suppression System

: Replacing Fire Suppression Control Panel.
PRFS202003277 Fire Suppression System Alteration/Repair/Replace Ready for Issuance
: Fire Suppression System

: Convert 12 upright heads to pendents for new ceilings being installed as part of a bathroom area remodel project
PRMH202002365 Mechanical/HVAC Alteration/Repair/Replace Finaled 03/13/2020
: Mechanical

: Provide Engineered Drawings for Permits and Construction for installation of a new 10,000 CFM air handling unit, supply ductwork, return grilles in perimeter walls and HEPA filters.
PREL202002263 Electrical Alteration/Repair/Replace Finaled 03/09/2020
: Electrical

: Factory, shop or building Quarterly Permit 4/1-6/30/20
PREL202002148 Electrical Alteration/Repair/Replace Finaled 03/05/2020
: Electrical

: JOB 83615-1108 POLAR SEMICONDUCTOR FACILITY OFFICE AND BREAKROOM REMODEL - SITE CONTACT CORY DOYLE 612-804-0909.
PREL202002147 Electrical Alteration/Repair/Replace Finaled 03/12/2020
: Electrical

: JOB 83615-1106 POLAR SEMICONDUCTOR P1 SECONDARY CHILLED WATER PUMPS - SITE CONTACT CORY DOYLE 612-804-0909
PRBD202001372 Building Alteration/Repair/Replace Expired 03/13/2020
: Building

: P1 Storage Modification
PRBD202001313 Building Alteration/Repair/Replace Finaled 03/02/2020
: Building

: Polar Semiconductor Fab 3 Modifications
PRMH202000452 Mechanical/HVAC Alteration/Repair/Replace Finaled 01/16/2020
: Mechanical

: Relocate Air Handling Unit to Backmetal Etch Room
PRMH202000451 Mechanical/HVAC Alteration/Repair/Replace Expired 01/16/2020
: Mechanical

: Install Fan Coil Unit & Ductwork
PREL202000170 Electrical Alteration/Repair/Replace Finaled 01/07/2020
: Electrical

: JOB 83615 POLAR FAB QUARTERLY MAINTENANCE Q1 2020
PRMH202000166 Mechanical/HVAC Alteration/Repair/Replace Finaled 01/09/2020
: Mechanical

: Relocate existing fan and run new exhaust duct to new bulk chemical room and add exhaust to new delivery modules. Add make up air from existing duct with new reheat coil.
PRMH202000165 Mechanical/HVAC Alteration/Repair/Replace Expired 01/09/2020
: Mechanical

: Ongoing Maintenance at Polar Semiconductors Inc.
PREL201914849 Electrical Alteration/Repair/Replace Finaled 12/12/2019
: Electrical

: Quarterly Permit, 1st quarter 2020
PREL201914593 Electrical Alteration/Repair/Replace Finaled 12/06/2019
: Electrical

: JOB 83615-1088 DYSC UPS/ASML PANEL POWER PROTECTION DEVICE (UPPER Mechanical Level) P3 ASML Panel (2BB15H1) Power Protection Device Installation In P3 Upper Mechanical Level, place equipment and modify circuit’s runs as noted: • Place Allen Bradley DySC Dynamic Voltage Sag Corrector on supplied pad. • Disconnect feed from 480V-400/231Y transformer which feeds panelboard 2BB15H1, demo back (2) 2” conduits which contain 3/0 wire back approximately 8 feet, mount 24” x 24” splice box, re-pipe to transformer. • Pipe from splice box approximately 40’ with two (2) pairs of two (2) 2” conduits to new Allen Bradly DySC Dynamic Voltage Sag Corrector and back to the splice box. • Re feed and make splices for feed to AB DySC and output of DySC back to Transformer. • Make all connections on AB DySC system per manufacturer’s recommendations.
PRFS201913106 Fire Suppression System Other Expired 12/19/2019
: Fire Suppression System

: Provide a new wet system (sprinklers, piping, & hangers) for the south fab area (main level).
PREL201912988 Electrical Alteration/Repair/Replace Expired 12/19/2019
: Electrical

: BACKMETAL AND PACKG RM LAB - UPPER MECHANICAL LEVEL WEST DISTRIBUTION MAIN PANELBOARD 2EE8H1/2EEL1 JOB 83615-1076 POLARSEMI
PREL201912987 Electrical Alteration/Repair/Replace Finaled 11/01/2019
: Electrical

: ECLIPSE 302S SWITCHGEAR JOB 83615-1074 POLARSEMI -
PREL201911514 Electrical Alteration/Repair/Replace Finaled 10/01/2019
: Electrical

: JOB 83615 POLARFAB QUARTERLY MAINTENANCE Q4 2019
PREL201910857 Electrical Alteration/Repair/Replace Finaled 09/16/2019
: Electrical

: Quarterly maintenance - 4th quarter 2019
PRMH201909848 Mechanical/HVAC Alteration/Repair/Replace Expired 09/05/2019
: Mechanical

: Maintenance
PREL201907197 Electrical Alteration/Repair/Replace Finaled 07/02/2019
: Electrical

: JOB 83615 POLAR FAB QUARTERLY MAINTENANCE Q3 2019
PREL201906716 Electrical Alteration/Repair/Replace Finaled 07/10/2019
: Electrical

: Quarterly Maintenance - 3rd quarter of 2019 -Permit expired - one time re-issued. MV 3/9/2020
PRPL201906307 Plumbing Alteration/Repair/Replace Expired 06/13/2019
: Plumbing

: Maintenance Work at Polar Fab (T & M)
PRMH201904426 Mechanical/HVAC Alteration/Repair/Replace Closed 05/09/2019
: Mechanical

: Miscellaneous Maintenance
PREL201903486 Electrical Alteration/Repair/Replace Finaled 04/18/2019
: Electrical

: JOB 83611031 ECCLIPSE 8
PREL201903485 Electrical Alteration/Repair/Replace Finaled 04/18/2019
: Electrical

: JOB 83615-1026 ECLIPSE 7
PRMH201903425 Mechanical/HVAC Alteration/Repair/Replace Closed 04/17/2019
: Mechanical

: Maintenance work. See attached in documents and images.
PRDE201903346 Demolition Alteration/Repair/Replace Expired 05/03/2019
: Demolition

: Client will be decommissioning a clean room within their existing facility. Work will include HVAC duct and process line removal and temporary wall panel (unistruct) removal. HVAC duct will be cleaned and disposed of as scrap metal. There will be hazard materials conductors removed as part of the demolition. No structural components will be demolished.
PREL201903341 Electrical Alteration/Repair/Replace Finaled 04/22/2019
: Electrical

: Install new illuminated building sign.
PREL201903010 Electrical Alteration/Repair/Replace Finaled 04/08/2019
: Electrical

: JOB 83615 POLARFAB QUARTERLY MAINTENANCE Q2 2019
PRPS201902614 Sign, Permanent New Sign Finaled 04/15/2019
: Sign

: Furnish and install (1) LED face illuminated raceway mount letter set on East elevation. Furnish and install (1) non-illuminated, reverse channel aluminum letter set on South elevation.
PREL201902488 Electrical Alteration/Repair/Replace Finaled 04/02/2019
: Electrical

: 2nd quarter maint.
PRMH201902267 Mechanical/HVAC Alteration/Repair/Replace Closed 03/19/2019
: Mechanical

: Maintenance work.
PRFS201901593 Fire Suppression System Other Finaled 02/27/2019
: Fire Suppression System

: Provide start up and testing of a pre-installed CO2 system on a wet bench.
PREL201901558 Electrical Alteration/Repair/Replace Finaled 02/22/2019
: Electrical

: JOB 83615-1019 GENERATOR ELECTRICAL WORK
PREL201901557 Electrical Alteration/Repair/Replace Finaled 02/22/2019
: Electrical

: JOB 83615 POLARFAB QUARTERLY MAINTENANCE Q1 2019
PRMH201901440 Mechanical/HVAC Alteration/Repair/Replace Closed 02/19/2019
: Mechanical

: Quarterly maintenance work.
PRMH201900685 Mechanical/HVAC Alteration/Repair/Replace Closed 01/23/2019
: Mechanical

: Maintenance work. See attached submittals for items.
PRWE201900199 Well Other Finaled 01/07/2019
: Well

: Annual Monitoring well maintenance permit
PREL201815496 Electrical Alteration/Repair/Replace Finaled 01/07/2019
: Electrical

: Quarterly maintenace. First quarter. (paper application)
PRMH201815293 Mechanical/HVAC Alteration/Repair/Replace Expired 12/18/2018
: Mechanical

: Maintenance work. (paper application, portal user)
PRMH201814371 Mechanical/HVAC Repair/Replace Closed 11/20/2018
: Mechanical

: Maintneance work. (VTC- Polar Semi Conductor)
PRFS201813345 Fire Suppression System Other Finaled 10/25/2018
: Fire Suppression System

: Relocate 4 heads for new ceilings, 1 for 1. All work on 2nd Floor server room. Polar Fab. (paper application)
PRMH201812785 Mechanical/HVAC Repair/Replace Closed 10/17/2018
: Mechanical

: maintenance work. 3rd quarter.
PRFS201812352 Fire Suppression System Repair/Replace Finaled 11/07/2018
: Fire Suppression System

: Installation of clean agent in new server room.
PREL201812350 Electrical Repair/Replace Finaled 10/11/2018
: Electrical

: Installing clean agent system in new server room.
PRMH201811365 Mechanical/HVAC Other Closed 09/25/2018
: Mechanical

: Maintenance work. List scanned and attached. Polar Semiconductor.
PREL201811247 Electrical Alteration/Remodel Finaled 10/08/2018
: Electrical

: JOB 83506 POLAR SEMI SUBSTATION 3 In P3 Main Electrical room: • Rig and place the three (3) new sections of S&C switchgear to the Northwest corner of the room on the existing housekeeping pad. Assemble per manufacturer’s instructions. Connect the 13.8kV circuit from the Bay 1 tap box in the main gear to the Bay3 tap box in the expansion gear using existing conduit routed below floor with 3- 4/0, 1 #4G, CU, 15kV, EPR, lead free, 133%, MV-105, tape shield Southwire spec 46302, alternate vendors include Aetna Insulated Wire, Inc., General Cable Technologies Corp., Okonite Company, Prysmian Cables and Systems. o Termination kits shall be 3M Cold Shrink QT-III series. Provide six (6) spare sets of termination kits. o The 13.8kV conductors shall be acceptance tested with VLF AC withstand testing per the manufacturers recommendations. In P3 Upper Mechanical Area, place the components of Substation #3 on housekeeping pads, this would include the Medium Voltage Main Switch, 4000kVA dry transformer and mating 480V panelboards. This will also include the 480V / 208Y 500Kva transformer w/Main, as well as the 208Y / 1600A distribution panel and the 480V / 800A distribution panel, assemble per manufacturer’s instructions. Extend the 13.8kV 150A feeder conduit from its current location at floor level on the North side of the first floor Phase2 expansion cleanroom area and extend feeder conduit up (~32 feet) to the Upper Mechanical Level and route to the location of the new Substation #3, Medium Voltage Disconnect Main switch. From the new S&C gear in the Northwest corner of the main electrical room, BAY1: Provide a 13.8kV feeder to the unit substation Medium Voltage Disconnect switch. a. Conductors shall be #1/0, CU, 15kV, EPR, lead free, 133%, MV-105, tape shield Southwire spec 46302 or approved equivalent (alternate suppliers mentioned above). b. Conduit for 13.8kV feeder shall be painted red and labeled “HIGH VOLTAGE”. Lettering height shall be approximately 25% of the circumference of the conduit. Labels shall be in each room the conduit passes through and shall not exceed 50’ spacing between labels. • Extend the 13.8kV conduit from its current location at floor level on the South side of the first floor Phase 1 cleanroom, up the wall ~10’ to a future tap box (provided). o Provide 13.8kV feeder from new S&C gear in the Northwest corner of the main electrical room, BAY2 to the tap box added above, conductors to follow same specification above.From Substation#3 run circuits to locations for: • One (1) 480V / 800A circuit to the main inlet on the 208Y 500kVA transformer w/Main. • Connect the output of the 500kVA 208V transformer to the 1600A distribution panelboard. • One (1) 480V / 800A circuit to the inlet of the 480V / 800A distribution panelboard.
PRMH201810933 Mechanical/HVAC Repair/Replace Finaled 09/17/2018
: Mechanical

: Install Aquatherm piping for the chilled water system and Propress copper on the condensate drain. Install pumps, balancing valves, and flow switch. A building permit has been issued (PRBD201808337)
PREL201810606 Electrical Other Finaled 09/19/2018
: Electrical

: Quarterly maintenance - 4th quarter.
PREL201810009 Electrical Repair/Replace Finaled 09/13/2018
: Electrical

: electrical work in the data center- install 30 0-100 amp feeder/circuits and 1 45 KVA transformer.
PRMH201809818 Mechanical/HVAC Repair/Replace Closed 08/28/2018
: Mechanical

: Maintenance work - included and attached list. Scanned list to submittals.
PRBD201808337 Building Alteration/Remodel Finaled 08/28/2018
: Building

: Remodel 650 sf of floor space on the second floor of the building. The remodel will include the following: Installation of a new concrete floor, Demolition of two offices, New walls and ceiling, Modify the existing Fire protection system, Installation of two computer room Air Conditioners, Installation of two Uninterruptible Power Supply Systems, Installation of Computer Racks.
PRMH201808042 Mechanical/HVAC Repair/Replace Closed 07/30/2018
: Mechanical

: Maintenance Work - Polar semi conductor (List in Submittals)
PRPL201807979 Plumbing Alteration/Remodel Expired 08/02/2018
: Plumbing

: Extend 4" sanitary sewer service for air handler condensate drains and floor drain. Please contact Randy Asher at (651) 488-5561 with any questions.
PRMH201806697 Mechanical/HVAC Other Closed 07/02/2018
: Mechanical

: Maintenance work. Repairs to exhaust ducts, trash compactor, novellus 312 relocation, Tel 310 relocation, ASML - 305, P3 cooling storage vent, P-3 admin AHU
PRMH201806114 Mechanical/HVAC Repair/Replace Finaled 06/19/2018
: Mechanical

: P-3 Penthouse AHU installation. Penthouse hvac.
PRMH201806111 Mechanical/HVAC Repair/Replace Finaled 06/19/2018
: Mechanical

: P-3 Admin air handout united install. Warehouse hvac.
PREL201805826 Electrical Repair/Replace Finaled 06/18/2018
: Electrical

: Quarterly Maintenance - 3rd quarter 2018
PRMH201804594 Mechanical/HVAC Other Closed 05/18/2018
: Mechanical

: Maintenance work - VTC Polar Semiconductor. Quarter not specified (3rd)?
PRMH201804058 Mechanical/HVAC Repair/Replace Finaled 05/04/2018
: Mechanical

: Substation cooling
PREL201803660 Electrical Alteration/Remodel Finaled 05/04/2018
: Electrical

: Job 83473 Polar Semiconductor photo phase 2 RAU's.
PRMH201803577 Mechanical/HVAC Repair/Replace Permit(s) Issued 04/23/2018
: Mechanical

: maintenace work
PRFS201802464 Fire Suppression System Alteration/Remodel Finaled 04/09/2018
: Fire Suppression System

: Convert 8 upright heads to pendent heads for bathroom addition in PIII Building. Polar Semiconductor.
PRMH201802387 Mechanical/HVAC Repair/Replace Permit(s) Issued 03/26/2018
: Mechanical

: Maintenance work - per the attachement, misc exhaust duct repairs, implant exhause consolidation, ASML 100-302 relocation, solvent waste cabinet relocation, install Novellus 311.
PREL201802031 Electrical Repair/Replace Finaled 03/19/2018
: Electrical

: Quarterly Maintenance-2nd quarter-2018
PRMH201801816 Mechanical/HVAC Repair/Replace Finaled 03/05/2018
: Mechanical

: Furnish and install exhaust duct work, transfer duct work, exhaust grilles and transfer grilles
PRMH201801584 Mechanical/HVAC Other Permit(s) Issued 02/26/2018
: Mechanical

: quarterly maintenance work. Solvent waste cabinet relocation. ASML 100-302 relocation. Immplant exhaust consolidation. AME maintenance exhaust. Mis exhaust duct repairs.
PRWE201800959 Well Other Finaled 02/08/2018
: Well

: Annual monitoring well maintenance permit. (6/16/16 - 6/15/17)
PREL201800927 Electrical Alteration/Remodel Finaled 02/02/2018
: Electrical

: Bathroom project (Job 9015353)
PREL201800925 Electrical Alteration/Remodel Finaled 02/07/2018
: Electrical

: Job 83460 - Polar Semiconductor, unit substation install
PRMH201800617 Mechanical/HVAC Repair/Replace Permit(s) Issued 01/22/2018
: Mechanical

: Maintenance Work
PRMH201800276 Mechanical/HVAC Repair/Replace Closed 01/11/2018
: Mechanical

: Phase 2 Photo Bay-Phase 2 Etch Bay Phase 2 Films Bay-Photo West Phase 2 Solvent/General Exhaust Phase 2 Corrosive Exhaust Phase 2 Make-Up Air, Phase 1 Make Up Air
PRMH201800226 Mechanical/HVAC Repair/Replace Permit(s) Issued 01/11/2018
: Mechanical

: Install (2) regulators for the Fulton boilers.
PRBD201800166 Building Alteration/Remodel Finaled 01/26/2018
: Building

: Build out toilet rooms in P3 Wing of building
PRPL201800161 Plumbing Alteration/Remodel Finaled 01/10/2018
: Plumbing

: Add mens and womens rest rooms and drinking fountains. Polar Semiconductor
PRMH201712150 Mechanical/HVAC Repair/Replace Permit(s) Issued 12/27/2017
: Mechanical

: Maintenance work.
PREL201712075 Electrical Repair/Replace Finaled 01/03/2018
: Electrical

: ALPHA311 power
PREL201712071 Electrical Repair/Replace Finaled 01/03/2018
: Electrical

: first quarterly maintenance 2018
PRMH201711294 Mechanical/HVAC Other Closed 11/27/2017
: Mechanical

: Maintenance (time and material work).
PRPL201711209 Plumbing Repair/Replace Finaled 11/21/2017
: Plumbing

: Rebuild 2 RPZ's. Serial #41575 in Penthouse for Humidifier. Serial #41083 in PF2 Penthouse for Chiller.
PRBD201710562 Building Alteration/Remodel Finaled 11/01/2017
: Building

: Steel stud gypsum board partitions to enclose electrical gear. Polar Semiconductor electrical room. OTC
PRMH201709780 Mechanical/HVAC Repair/Replace Permit(s) Issued 10/17/2017
: Mechanical

: Maintenance (time and material)
PRBD201709545 Building Alteration/Remodel Finaled 12/04/2017
: Building

: Clean Room addition - Phase 2- Polarfab 3
PRMH201708736 Mechanical/HVAC Repair/Replace Finaled 09/20/2017
: Mechanical

: P-3 Phase 2 Diffusion Expansion.
PRMH201708625 Mechanical/HVAC Repair/Replace Permit(s) Issued 09/14/2017
: Mechanical

: Maintenance (Time and Material Work)
PREL201708615 Electrical Alteration/Remodel Finaled 09/15/2017
: Electrical

: MRL326 Power Permit extended by Nick Mauk - still working on project. vcarlson 03/06/2018 10:37 AM
PREL201708614 Electrical Other Finaled 09/15/2017
: Electrical

: Quarterly maintenance - 4th quarter 2017.
PREL201708613 Electrical Alteration/Remodel Finaled 09/15/2017
: Electrical

: NOVEL326 Power
PREL201708612 Electrical Alteration/Remodel Finaled 09/15/2017
: Electrical

: MRL325 Power
PREL201708611 Electrical Alteration/Remodel Finaled 09/15/2017
: Electrical

: Phase 2 Diffusion Bay Permit extended by Nick Mauk - still working on project. vcarlson 03/06/2018 10:37 AM
PRFS201707779 Fire Suppression System Other Permit(s) Issued 08/31/2017
: Fire Suppression System

: Offset 6 existing branch lines for new structural steel/floor openings and add 6 heads.
PRMH201707687 Mechanical/HVAC Repair/Replace Permit(s) Issued 08/22/2017
: Mechanical

: Maintenance (time and material work)
PRBD201707178 Building Alteration/Remodel Finaled 09/15/2017
: Building

: Clean room addition, Polarfab 3.
PRMH201706221 Mechanical/HVAC Other Permit(s) Issued 07/18/2017
: Mechanical

: Maintenance
PRMH201705929 Mechanical/HVAC Alteration/Remodel Permit(s) Issued 10/19/2017
: Mechanical

: Install piping to existing chiller and cooling towers.
PRST201705861 Structural Other Finaled 08/01/2017
: Building

: Steel reinforcement for slab penetrations.
PREL201705159 Electrical Repair/Replace Finaled 06/20/2017
: Electrical

: Add outlets- 18 circuits.
PRMH201705158 Mechanical/HVAC Repair/Replace Permit(s) Issued 06/19/2017
: Mechanical

: Quarterly maintenance Job #301557
PREL201704890 Electrical Alteration/Remodel Finaled 06/16/2017
: Electrical

: EPI11-12 Power
PREL201704889 Electrical Alteration/Remodel Finaled 06/16/2017
: Electrical

: NOVEL315 power.
PREL201704887 Electrical Other Finaled 06/16/2017
: Electrical

: 3rd Quarter Maintenance Permit - Polar Semiconductor.
PRMH201703828 Mechanical/HVAC Other Permit(s) Issued 05/18/2017
: Mechanical

: Maintanance (time and material work). Job 301405. Time frame not provided.
PRMH201703602 Mechanical/HVAC Alteration/Remodel Finaled 05/11/2017
: Mechanical

: Install 1 ton ductless split to condition elevator machine room at Polar Semi-conductor.
PREL201703357 Electrical Repair/Replace Finaled 05/15/2017
: Electrical

: Quarterly Maintenance 2nd Quarter 2017 ( April - June)
PRMH201702600 Mechanical/HVAC Other Closed 04/18/2017
: Mechanical

: Maintenance
PRMH201701540 Mechanical/HVAC Alteration/Remodel Finaled 03/17/2017
: Mechanical

: Maintenence on duct work.
PRMH201700500 Mechanical/HVAC Repair/Replace Closed 02/13/2017
: Mechanical

: Maintenance (Time and Material Work)
PREL201700045 Electrical Repair/Replace Finaled 02/13/2017
: Electrical

: TEL311 Power
PREL201700044 Electrical Repair/Replace Finaled 02/13/2017
: Electrical

: Quarterly Maintenance, 1st Quarter 2017
PREL201700039 Electrical Repair/Replace Finaled 02/13/2017
: Electrical

: AME328 Power
PREL201700032 Electrical Repair/Replace Finaled 02/13/2017
: Electrical

: Alpha312 Power


Planning Applications

Project Number Type Status Date Closed
PL202400168 Zoning Verification Requests File Closed 11/07/2024
: Zoning Verification Letter
PL202300080 Development Application File Closed
: Polar Semiconductors Expansion - FDP - 2800 E. Old Shakopee Road
PL202300076 Pre-Application File Closed
: Polar Semiconductors Expansion - FDP - 2800 E. Old Shakopee Road
PL202100211 Engineering Application File Closed
: Street Name Change: 28th Avenue South to Winstead Way
PL201900236 Development Application File Closed
: Industrial Rezonings to IT