PRFS202603389
|
Fire Suppression System
|
Other
|
In Plan Check
|
|
|
:
Fire Suppression System
:
Relocate or add sprinklers as needed for remodel off existing system.
|
|
PRAL202603177
|
Fire Alarm
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
04/01/2026
|
|
:
Fire Alarm
:
Update fire alarm system for tenant buildout (LVC 2600424)
|
|
PRMH202603044
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
03/26/2026
|
|
:
Mechanical
:
Relocate and reinstall existing diffusers. Relocate an existing heatpump from over a wall.
|
|
PREL202602656
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
03/16/2026
|
|
:
Electrical
:
PO 40024 DISCONNECT WIRING FOR REMOVAL & DISPOSAL BY OTHERS, RECYCLE FLUORESCENT LAMPS, WIRE 1 GRINDER WHIP AT TIME OF DEMO, WIRE 1 -1.85KW ELECTRIC WATER HEATER, FURNISH & INSTALL 53 FIXTURES/CANS, 14 OCCUPANCY SENSORS, 4 EXIT/EMERGENCY SIGNS/LIGHTS, 3 THREE WAY SWITCHES. 2 CR OPENINGS, 20 PHONE/DATA OPENINGS, 46 RECEPTACLES, REPLACE REMAINING DEVICES AND PLATES WITH WHITE.
|
|
PRBD202602494
|
Building
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
03/31/2026
|
|
:
Building
:
Interior buildout of two existing vacant spaces, combining into one suite for SJJ Law. Occupancy uses to remain.
|
|
PRAL202601319
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
02/24/2026
|
|
:
Fire Alarm
:
Add notification to existing fire alarm system for tenant buildout (LVC 2501879)
|
|
PREL202601315
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/10/2026
|
|
:
Electrical
:
Fire alarm updates for tenant buildout (LVC 2501879).
|
|
PRFS202600623
|
Fire Suppression System
|
Other
|
Finaled
|
02/04/2026
|
|
:
Fire Suppression System
:
Modify existing sprinkler system to accommodate new arch walls and ceilings per NFPA 13 (2106).
|
|
PREL202600367
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/15/2026
|
|
:
Electrical
:
Remodel for McCollum Crowley
|
|
PREL202600277
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/10/2026
|
|
:
Electrical
:
Remodel to 24th floor corridor.
|
|
PRAL202600276
|
Fire Alarm
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
01/21/2026
|
|
:
Fire Alarm
:
24th Corridor remodel.
|
|
PRMH202600186
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
01/16/2026
|
|
:
Mechanical
:
Relocate diffusers, install new transfer fan
|
|
PRFS202516112
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
12/30/2025
|
|
:
Fire Suppression System
:
Install window sprinklers at new glass in level 24 elevator lobby. Add/relocate existing for new ceilings.
|
|
PRBD202515809
|
Building
|
Addition
|
Finaled
|
01/05/2026
|
|
:
Building
:
Interior Remodel on the 19th floor.
|
|
PREL202515729
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/11/2025
|
|
:
Electrical
:
Remodel corridor.
|
|
PRMH202515290
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
12/10/2025
|
|
:
Mechanical
:
Demo and install 6 new diffusers
|
|
PREL202515278
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
12/03/2025
|
|
:
Electrical
:
Retrofitting about 400 troffers and troffer kits, and 266 recessed cans to LED
|
|
PRPL202511773
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
09/23/2025
|
|
:
Plumbing
:
Remove sink and re-install new sink on existing rough-ins. Install tenants dishwasher.
|
|
PREL202510996
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
09/23/2025
|
|
:
Electrical
:
Remodel cafe
|
|
PRPL202510814
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
09/04/2025
|
|
:
Plumbing
:
Replace existing break room sink using existing rough-ins. Provide one water line for the refrigerator.
|
|
PRMH202510807
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
09/11/2025
|
|
:
Mechanical
:
Installing gas burning fireplace on existing platform. We will be venting the fireplace with an inline power vent. (Others will be doing the framing and gasline.)
|
|
PREL202510629
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/16/2025
|
|
:
Electrical
:
PO 39680 DISCONNECT WIRING FOR REMOVAL & DISPOSAL BY OTHERS, RECYCLE FLUORESCENT LAMPS, FURNISH & INSTALL 3 FIXTURES, 1 GREEN EDGE LIT EXIT LIGHT, 1 SINGLE POLE SWITCH, 7 PHONE/DATA OPENINGS, 9 RECEPTACLES, REPLACE REMAINING DEVICES & PLATES W/WHITE (lv JACKS/PLATES BY OTHERS).
|
|
PRBD202510609
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
09/26/2025
|
|
:
Building
:
Interior remodel of existing suite for new tenant.
|
|
PRAL202510181
|
Fire Alarm
|
Other
|
Finaled
|
09/10/2025
|
|
:
Fire Alarm
:
Install notification device for Suite 1920 tenant remodel (LVC #2501155)
|
|
PREL202510179
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/19/2025
|
|
:
Electrical
:
Add fire alarm notification device for Suite 1920 tenant remodel (LVC # 2501155)
|
|
PREL202509914
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/19/2025
|
|
:
Electrical
:
Small office remodel add 4 outlets rework 7 existing lights.
|
|
PRFS202509871
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Expired
|
08/13/2025
|
|
:
Fire Suppression System
:
ADD/RELOCATE 5 SPRINKLERS AS NEEDED FOR NEW OFFICES.
|
|
PRBD202509808
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
08/27/2025
|
|
:
Building
:
Remodel of existing space for new tenant.
|
|
PRPL202509779
|
Plumbing
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
08/15/2025
|
|
:
Plumbing
:
Rough-in, provide and install
*lav
*general contractors dish washer
*water line for cofee and refrigerator
*6 ga water heater
*water cooler (salvaged)
|
|
PRAL202509612
|
Fire Alarm
|
Other
|
Finaled
|
09/08/2025
|
|
:
Fire Alarm
:
Install fire alarm notification devices for 1st floor remodel (LVC # 2501072).
|
|
PREL202509611
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/07/2025
|
|
:
Electrical
:
Install fire alarm notification devices for 1st floor remodel (LVC # 2501072)
|
|
PRAL202509610
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
09/08/2025
|
|
:
Fire Alarm
:
Add fire alarm notification devices to Suite 1850 build out (LVC # 2501074)
|
|
PREL202509608
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/07/2025
|
|
:
Electrical
:
Add fire alarm notification devices for Suite 1850 build out (LVC # 2501074)
|
|
PRFS202509526
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
08/20/2025
|
|
:
Fire Suppression System
:
Add and relocate fire sprinklers to code for new office build out.
|
|
PRFS202509492
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
08/15/2025
|
|
:
Fire Suppression System
:
Add, Plug, and Relocate sprinkler heads to accommodate tenant improvements in the existing cafe.
|
|
PRBD202509311
|
Building
|
Alteration/Repair/Replace
|
Expired
|
08/01/2025
|
|
:
Building
:
Demolition per plan only
|
|
PRMH202509300
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
08/11/2025
|
|
:
Mechanical
:
HVAC PER PLANS
|
|
PRMH202509022
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
08/11/2025
|
|
:
Mechanical
:
Modify duct for new layout, new sound boots, diffusers, and relocate 1 hp.
|
|
PREL202508817
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/01/2025
|
|
:
Electrical
:
PO 39615 DISCONNECT WIRING FOR REMOVAL & DISPOSAL BY OTHERS, FURNISH & INSTALL 96 FIXTURES, 15 WALL MOUNT DIMMING OCCUPANCY SENSORS, 2 SINGLE POLE SWITCHES, 4 THREE/FOUR WAY SWITCHES, 22 PHONE/DATA OPENINGS, 50 MISCELLANEOUS RECEPTACLES, 45 FEET CONNETRAC FLOOR RACEWAY, WIRE 1 DISHWASHER, 1-4.5 KW ELECTRIC WATER HEATER,3 SLUSH FLOOR FURNITURE BASE FEEDS.
|
|
PRPL202508646
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
07/31/2025
|
|
:
Plumbing
:
Plumbing remodel of existing cafe.
|
|
PRFS202508619
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
08/04/2025
|
|
:
Fire Suppression System
:
Add and relocate 6 sprinkler heads for new walls.
|
|
PRBD202508494
|
Building
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
08/04/2025
|
|
:
Building
:
Tenant Improvement Alteration
|
|
PREL202508250
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/14/2025
|
|
:
Electrical
:
PO 93882 DEMO, RECIRCUIT LIGHTS, ADD 5' OF UC LIGHTING, RECEPTACLES & DATA OPENINGS.
|
|
PREHP202507714
|
Environmental Health Plan
|
Alteration/Repair/Replace
|
Finaled
|
08/01/2025
|
|
:
Environmental Health Plan
:
Renovating an existing cafe
|
|
PRBD202507146
|
Building
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
11/19/2025
|
|
:
Building
:
THE INTERIOR BUILD-OUT OF THE COMMON CORRIDOR ON THE 24TH LEVEL
|
|
PRBD202506804
|
Building
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
08/21/2025
|
|
:
Building
:
INTERIOR REMODEL OF AN EXISTING CAFETERIA FOR A NEW
BUILDING AMENITY CAFE AND LOUNGE AND WELLNESS AREA.
SCOPE OF WORK IS LOCATED ON THE GROUND FLOOR OF AN
EXISTING HIGH RISE OFFICE BUILDING. REMODEL TO INCLUDE
EXTERIOR BUILDING IMPROVEMENTS
|
|
PRPL202505988
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
06/02/2025
|
|
:
Plumbing
:
Break sink
(Note: 7900 Xerxes but that is for the small Wells Fargo Drive Through ONLY> correcting address to 3400 American Blvd W., Suite 2000)
|
|
PRBD202505881
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
07/02/2025
|
|
:
Building
:
Interior remodel suite 320
|
|
PRMH202503733
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
04/14/2025
|
|
:
Mechanical
:
Add diffusers as per plan.
|
|
PRAL202502785
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
03/27/2025
|
|
:
Fire Alarm
:
Installation of speaker strobes and smoke for elevator recall after remodel.
All devices were existing with previous layout, replacing for new layout.
All wiring to panel existing.
|
|
PREL202501963
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/27/2025
|
|
:
Electrical
:
Remodel
|
|
PRBD202501351
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
03/05/2025
|
|
:
Building
:
Existing Tenant Remodel Expansion
|
|
PREL202500478
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
01/22/2025
|
|
:
Electrical
:
Low voltage- Landing 12 Thermostats.
|
|
PRAL202416377
|
Fire Alarm
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Fire Alarm
:
One for one replacement of existing speaker/strobes and smoke detector with new. Existing building fire alarm panel to remain.
|
|
PREL202416175
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/16/2024
|
|
:
Electrical
:
Tenant remodel
|
|
PRFS202415682
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Expired
|
12/04/2024
|
|
:
Fire Suppression System
:
Add/relocate (112) sprinkler heads for full 6th floor tenant improvement.
|
|
PRMH202415328
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
11/22/2024
|
|
:
Mechanical
:
Rework existing HVAC for new floor plan.
|
|
PREL202411865
|
Electrical
|
Alteration/Repair/Replace
|
Closed
|
09/11/2024
|
|
:
Electrical
:
PO 39046 DISCONNECT WIRING FOR REMOVAL & DISPOSAL BY OTHERS, RECYCLE FLUORESCENT LAMPS, FURNISH & INSTALL 15 2X4 LAY IN LED DIRECT/INDIRECT FIXTURES, 2 SINGLE POLE SWITCHES, 3 MISC RECEPTACLES, 8 LED TRIMS IN EXISTING CAN LIGHTS, WIRE & INSTALL 2 OWNER SUPPLIED PENDANT FIXTURES, REMOVE & RE-INSTALL 1 EXIT LIGHT FOR NEW CEILING TILES.
|
|
PRBD202411851
|
Building
|
Alteration/Repair/Replace
|
Expired
|
10/29/2024
|
|
:
Building
:
Level 06 Interior Remodel
|
|
PRBD202410199
|
Building
|
Alteration/Repair/Replace
|
Expired
|
09/05/2024
|
|
:
Building
:
Parking Garage Concrete Repairs
|
|
PRAL202409688
|
Fire Alarm
|
Other
|
Expired
|
08/12/2024
|
|
:
Fire Alarm
:
fire alarm for 13th floor remodel (LVC job # 2400951)
|
|
PREL202409687
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
07/29/2024
|
|
:
Electrical
:
Fire alarm for 13th floor remodel.(LVC job # 2400951)
|
|
PREL202409523
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/23/2024
|
|
:
Electrical
:
Partrial remodel of 16th and 22nd floor. Relocating furniture, power and lighting in new offices. Relocate lighting in existing offices and open office.
|
|
PRMH202408618
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
07/16/2024
|
|
:
Mechanical
:
HVAC Remodeling. Piping is by others.
|
|
PRFS202408617
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
07/08/2024
|
|
:
Fire Suppression System
:
Relocate 8 existing concealed heads for new ceiling finish in corridor and tenant space.
Relocate Main in cove in front of elevator lobby.
|
|
PRBD202408121
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
07/08/2024
|
|
:
Building
:
Interior remodel of existing space for new tenant.
|
|
PRPL202407436
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
06/10/2024
|
|
:
Plumbing
:
Replace RPZ.
|
|
PRBD202406096
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
05/24/2024
|
|
:
Building
:
Interior remodel of existing vacant space for new tenant.
|
|
PRAL202405899
|
Fire Alarm
|
Other
|
Finaled
|
07/10/2024
|
|
:
Fire Alarm
:
Tenant remodel (LVC job 2400394)
|
|
PREL202405898
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
05/07/2024
|
|
:
Electrical
:
Fire alarm for tenant remodel on 23rd floor (LVC job 2400394).
|
|
PRAL202405897
|
Fire Alarm
|
Other
|
Finaled
|
06/11/2024
|
|
:
Fire Alarm
:
Fire alarm system for remodel of 23rd floor (LVC job 2400417)
|
|
PREL202404520
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
05/10/2024
|
|
:
Electrical
:
Disconnect and reconnect
Two rooftop drycoolers
Two Computer Room AC units
|
|
PRFS202403505
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Expired
|
04/18/2024
|
|
:
Fire Suppression System
:
Relocate (33) pendent sprinklers for new ceilings and walls.
Relocate (31) upright sprinklers due to the elimination of ceilings.
|
|
PREL202403297
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/22/2024
|
|
:
Electrical
:
PO 38731DISCONNECT WIRING FOR REMOVAL & DISPOSAL BY OTHERS, RECYCLE FLUORESCENT LAMPS, RELOCATE 1 SUB PANEL & RE-FEED CIRCUITRY AS REQUIRED, FURNISH & INSTALL 186 FIXTURES, 8 EXIT LIGHTS, 25 OCCUPANCY SENSORS, 18 LED DIMMERS, 1 LIGHTING CONTROL PANEL, 4 LOW VOLTAGE PUSH BUTTONS, 117 RECEPTACLES, 63 FT OF PLUG MOLD, 3 CARD READER OPENINGS, 30 PHONE/DATA OPENINGS, WIRE 1 DISHWASHER, 2 -1.8 KW ELECTRIC WATER HEATERS.
|
|
PREL202403296
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/20/2024
|
|
:
Electrical
:
PO 38730 DISCONNECT WIRING FOR REMOVAL & DISPOSAL BY OTHERS, FURNISH & INSTALL 17 FIXTURES, 8GEEN EDGE LIT EXIT LIGHTS, 2 THREE WAY SWITCHES, FOR VACANCY, 1 PROGRAMMABLE TIMER SWITCH FOR CORRIDOR LIGHTS, WIRE UP 18 2X4 LIGHTS IN VACANCY FOR SPACE SHOWING, RETROFIT 4 RESTROOM RECESSED CANS W/LED TRIMS & VALANCE FIXTURES WITH LED'S.
|
|
PRPL202403213
|
Plumbing
|
Alteration/Repair/Replace
|
Expired
|
03/19/2024
|
|
:
Plumbing
:
Install plumbing for (1) wellness room sink (2) break sinks
|
|
PRBD202402364
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
03/25/2024
|
|
:
Building
:
Interior Remodel Corridor Level 23
City Center Real Estate - 3400 AMERICAN BLVD W Level 23 - Interior Corridor Remodel
|
|
PRBD202401832
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
03/25/2024
|
|
:
Building
:
Interior Remodel
|
|
PRROWU202401450
|
ROW Underground
|
N/A
|
Warranty
|
02/13/2024
|
|
:
Right-of-Way
:
MNDOT I 494 ROAD JOB. PLACE FIBER OPTIC CABLE IN INNERDUCT ACROSS I 494.
|
|
PREL202304075
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
05/24/2023
|
|
:
Electrical
:
New Lighting - Relocate Switching.
Added general receptacles.
|
|
PRBD202303201
|
Building
|
Other
|
Finaled
|
05/05/2023
|
|
:
Building
:
Tenant Improvements
|
|
PRMH202301762
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
03/06/2023
|
|
:
Mechanical
:
Install new duct work with diffusers in exposed ceilings, relocate diffusers, install (4) new 2x2 diffusers, eggcrate, air balance
|
|
PREL202301482
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
02/17/2023
|
|
:
Electrical
:
Modify existing fire alarm
|
|
PRMH202301297
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
02/13/2023
|
|
:
Mechanical
:
Furnish and install (1) heat pump and relocate existing diffusers. **Electrical permit required for A/C**
|
|
PREL202300991
|
Electrical
|
Other
|
Expired
|
02/02/2023
|
|
:
Electrical
:
THERMOSTAT WIRING IN SUITE 1500
|
|
PREL202300254
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/11/2023
|
|
:
Electrical
:
Build out of suite 1500 per plans.
|
|
PRBD202214300
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
11/28/2022
|
|
:
Building
:
THIS PROJECT INCLUDES THE INTERIOR BUILD-OUT OF AN OFFICE
SUITE ON THE 15TH LEVEL OF A 24 STORY BUILDING. EXISTING
BUSINESS OCCUPANCY USE TO REMAIN. NEW INTERIOR PARTITIONS,
FINISHES AND FIXTURES. NEW BREAK AREA WITH PLUMBING (SINK
AND DISHWASHER) TO BE ADDED.
|
|
PRAL202207609
|
Fire Alarm
|
Other
|
Finaled
|
07/12/2022
|
|
:
Fire Alarm
:
Modify fire alarm system on suite 170 (LVC Job # 2200628)
|
|
PRBD202204810
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
05/24/2022
|
|
:
Building
:
Tenant Improvement
|
|
PRMH202204146
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
04/20/2022
|
|
:
Mechanical
:
Install new duct in exposed ceiling, replace 2x2, new eggcrate
|
|
PREL202203332
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/04/2022
|
|
:
Electrical
:
Suite 1950 Fire Alarm Upgrades (LVC Job # 2200323)
|
|
PREL202203330
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/04/2022
|
|
:
Electrical
:
Suite 925 Fire Alarm Upgrades (LVC Job # 2200323)
|
|
PREL202202560
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
03/16/2022
|
|
:
Electrical
:
PO 37606 SUITE 1950 -
DISCONNECT WIRING FOR REMOVAL & DISPOSAL BY OTHERS, RECYCLE FLUORESCENT LAMPS, WIRE GRINDER WHIP, FIXTURES, WATER HEATER, FURNISH & INSTALL FIXTURES, EXIT/EMERGENCY SIGNS/LIGHTS, OCCUPANCY SENSORS, DIMMERS, SWITCHES, PHONE/DATA OPENINGS, RECEPTACLES, & FURNITURE FLOOR FEEDS.
|
|
PREL202202533
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
04/06/2022
|
|
:
Electrical
:
PO 37606 DISCONNECT WIRING FOR REMOVAL & DISPOSAL BY OTHERS, RECYCLE FLUORESCENT LAMPS, WIRE 2 GRINDER WHIPS, 1 TYPE F7 FIXTURE, 2 - 1.8 KW ELECTRIC WATER HEATERS, FURNISH & INSTALL 72 FIXTURES, 4 EXIT/EMERGENCY SIGNS/LIGHTS, 10 OCCUPANCY SENSORS, 6 DIMMERS, 6 SWITCHES, 14 PHONE/DATA OPENINGS. 50 RECEPTACLES (2 av3 POKE THRU W/PHONE OPENINGS), 7 CONNTRAC FLOOR FURNITURE FEEDS.
|
|
PREL202202272
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/08/2022
|
|
:
Electrical
:
Low voltage wiring.
|
|
PRAL202202271
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
03/16/2022
|
|
:
Fire Alarm
:
Relocate (3) A/V's, add (2) A/V's to Fire Alarm System.
|
|
PRBD202202129
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
03/15/2022
|
|
:
Building
:
Tenant Improvement
|
|
PREL202201982
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
03/01/2022
|
|
:
Electrical
:
PO 37582 FURNISH & INSTALL 17 TYPE A1 FIXTURES, 7 TYPE C1 FIXTURES, 6 TYPE P2 FIXTURES, 1 TYPE P3 FIXTURE, 1 EXIT/EMERGENCY SIGN/LIGHT, 6 OCCUPANCY SENSORS (2 WALL MOUNT & 4 CEILING MOUNT), 19 RECEPTACLES, 2 TV OPENINGS, 2 PHONE/DATA OPENINGS, WIRE 1 DISHWASHER, 1 FURNITURE BASE FEED, 8 FLUSH FLOOR FURNITURE BASE FEEDS, 1 - 6 GALLON ELECTRIC WATER HEATER, DISCONNECT WIRING FOR CONSTRUCTION.
|
|
PRBD202201936
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
03/04/2022
|
|
:
Building
:
Tenant Improvement - Suite 925
|
|
PRBD202200694
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
02/28/2022
|
|
:
Building
:
Renovation project, including space/wall reconfiguration and tenant build-out.
|
|
PRMH202200619
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
01/20/2022
|
|
:
Mechanical
:
Relocate diffusers as per plan.
|
|
PREL202116425
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/17/2021
|
|
:
Electrical
:
Fire alarm wiring for Total Dynamic Solution 20th & 21st Floor remodels at Wells Fargo Plaza 12210
|
|
PRAL202116423
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
01/14/2022
|
|
:
Fire Alarm
:
Adding & relocating speaker/strobes and strobes as needed for the Total Dynamic Solution 20th & 21st Floor remodel as Wells Fargo Plaza 12210
|
|
PRBD202116172
|
Building
|
Alteration/Repair/Replace
|
Expired
|
02/23/2022
|
|
:
Building
:
Lobby updating
|
|
PREL202116052
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/08/2021
|
|
:
Electrical
:
PO 37477 FURNISH & INSTALL 109 FIXTURES, 6 EXIT/EMERGENCY SIGNS/LIGHTS, 15 OCCUPANCY SENSORS, 2 SWITCHES, 39 RECEPTACLES, 4 TV OPENINGS, 12 PHONE/DATA OPENINGS, WIRE 5 FURNITURE BASE FEEDS, 3 FLUSH FLOOR FURNITURE BASE FEEDS, 1 - 6 GALLON ELECTRIC WATER HEATER, DISCONNECT WIRING FOR CONSTRUCTION.
|
|
PRBD202115565
|
Building
|
Alteration/Repair/Replace
|
Expired
|
01/10/2022
|
|
:
Building
:
Renovation, including space/wall reconfiguration, wall work at suite entries (doors/openings), and tenant build-out.
|
|
PREL202110634
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/18/2021
|
|
:
Electrical
:
Tenant remodel
|
|
PRBD202107457
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
07/22/2021
|
|
:
Building
:
Tenant interior remodel of flooring, lighting, break rooms, and a number of offices.
|
|
PRPL202003560
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
04/27/2020
|
|
:
Plumbing
:
Rough-in and install 24 sinks and 1 80 gallon 24KW water heater.
|
|
PRBD202003450
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
04/30/2020
|
|
:
Building
:
Interior tenant build-out
|
|
PRMH202000019
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
01/06/2020
|
|
:
Mechanical
:
Install 1-ton Movincool in new Server Room with exposed ceiling.
Paradigm
|
|
PRBD201914019
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
12/02/2019
|
|
:
Building
:
Tenant Improvement- I.T. room
|
|
PRMH201904885
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Expired
|
06/04/2019
|
|
:
Mechanical
:
• Demo existing Heat Pumps and install (16) building provided Heat Pumps
• Provide and install new distribution ductwork
• Provide and install new fresh air spiral where needed
• Re-use existing ductwork where possible
• Provide install exposed spiral ductwork with registers in exposed ceilings
• Demo Heat Pump water piping to accommodate new layout
• Provide and install new lay-in diffusers
• Re-use and relocate all existing slots diffusers as needed
• Provide and install eggcrate return air grills where needed
|
|
PREL201903859
|
Electrical
|
Other
|
Finaled
|
05/09/2019
|
|
:
Electrical
:
Install 131 lights, install 52 sensors, 85 receptacles, wire 11 sets of furniture
|
|
PRBD201903507
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
05/09/2019
|
|
:
Building
:
Work to bring third floor suites to spec status.
|
|
PRMH201903496
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
04/24/2019
|
|
:
Mechanical
:
INSTALL 3 RETURN AIR SOUND TRANSFERS
|
|
PREL201902664
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/28/2019
|
|
:
Electrical
:
Updating Fire Alarm System for TI 1900123
|
|
PRFS201901995
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
03/13/2019
|
|
:
Fire Suppression System
:
Add 4 new concealed pendent sprinkler heads and relocate 8 existing concealed pendent sprinkler heads.
|
|
PREL201901993
|
Electrical
|
Other
|
Finaled
|
03/08/2019
|
|
:
Electrical
:
Remodel - 77 lights, 15 sensors, 20 receptacles, 3 sets of furniture
|
|
PRMH201901945
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
03/14/2019
|
|
:
Mechanical
:
• Separate and cap duct going to adjacent space
• Relocate existing diffusers and rework ductwork to accommodate new layout
• Provide and install (5) new 2x2 lay-in diffusers
• Provide and install (1) new linear diffuser
• New install eggcrate return air grills where needed
• Provide and install transfer through new demising wall
• Provide and install 250 cfm fan in Server Room
|
|
PRBD201901852
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
03/26/2019
|
|
:
Building
:
Tenant Improvement
|
|
PRBD201901583
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
03/04/2019
|
|
:
Building
:
Tenant Improvements for New Tenant
|
|
PREL201813627
|
Electrical
|
Repair/Replace
|
Expired
|
10/31/2018
|
|
:
Electrical
:
Replace 2500A pressure switch (Was addressed as 7900 Xerxes)
|
|
PRPL201811439
|
Plumbing
|
Repair/Replace
|
Finaled
|
09/26/2018
|
|
:
Plumbing
:
In Breakroom: install one sink, one 6 gallon electric water heater,(electric permit required), and one standpipe.
|
|
PRFS201811367
|
Fire Suppression System
|
Alteration/Remodel
|
Finaled
|
09/26/2018
|
|
:
Fire Suppression System
:
Relocate 5 heads for new wall on 3rd floor.
|
|
PRST201811227
|
Structural
|
New
|
Finaled
|
10/01/2018
|
|
:
Building
:
Furnish and install (1) LED face illuminated remote mount letter set on West elevation of building.
|
|
PREL201811188
|
Electrical
|
Repair/Replace
|
Finaled
|
09/21/2018
|
|
:
Electrical
:
PO 35741 Relocate 32 fixtures, furnish & install 8 fixtures, 2 exit/emergency signs/lights, 2 switches, 10 occupancy sensors, 38 receptacles, 14 phone/data openings, disconnect/rewire 2 heat pumps, wire 1 1800 watt electric water heater & other miscellaneous wiring as needed. Disconnect wiring for removal & disposal by others.
|
|
PRPL201810953
|
Plumbing
|
Repair/Replace
|
Expired
|
09/18/2018
|
|
:
Plumbing
:
Replace breakroom sink, extend water line for ice/coffee maker. Floors 5 & 17.
|
|
PRMH201810952
|
Mechanical/HVAC
|
Alteration/Remodel
|
Closed
|
09/18/2018
|
|
:
Mechanical
:
Add linear diffusers per plans with temp controls and air balance. Floors 5 & 17.
|
|
PREL201810556
|
Electrical
|
Repair/Replace
|
Expired
|
09/10/2018
|
|
:
Electrical
:
Pull low voltage HVAC wire. Alarm.com on 16th floor.
|
|
PRBD201809884
|
Building
|
Alteration/Remodel
|
Finaled
|
09/17/2018
|
|
:
Building
:
Tenant Improvements/Building Improvements
|
|
PRAL201809768
|
Fire Alarm
|
Other
|
Expired
|
09/04/2018
|
|
:
Fire Alarm
:
Wells Fargo Plaza 16th floor. Install fire alarm devices as per drawing. A-134482
|
|
PREL201809738
|
Electrical
|
Repair/Replace
|
Expired
|
08/24/2018
|
|
:
Electrical
:
Wells Fargo Plaza 16th floor. Electrical for install of fire alarm devices as per drawing. (A-13482)
|
|
PRFS201809324
|
Fire Suppression System
|
Alteration/Remodel
|
Expired
|
08/17/2018
|
|
:
Fire Suppression System
:
Relocate 6 sprinklers for minor tenant improvement - match existing.
Unityworks suite 600
|
|
PRMH201808924
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
08/21/2018
|
|
:
Mechanical
:
Hang new heat pump install new ductwork, install new water piping for HP's, install new transfers.
Building is providing heat pumps.
|
|
PRPL201808822
|
Plumbing
|
Alteration/Remodel
|
Finaled
|
08/09/2018
|
|
:
Plumbing
:
Plumbing for (2) bathrooms, (2) sinks, mop sink, and electric water cooler in new tenant space.
|
|
PRFS201808818
|
Fire Suppression System
|
New
|
Finaled
|
08/20/2018
|
|
:
Fire Suppression System
:
Add and relocate 85 fire sprinkler to code for new tenant buildout. Portal application with plans submitted separately by mail for Alarm.com
|
|
PRMH201808776
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
09/06/2018
|
|
:
Mechanical
:
Add (2) heat pumps and modify ductwork for new architectural layout
|
|
PRPL201808554
|
Plumbing
|
Alteration/Remodel
|
Finaled
|
08/07/2018
|
|
:
Plumbing
:
Furnish and install (1) new breakroom sink. Tie into existing plumbing (waste,vent,water). 3rd floor
|
|
PREL201807698
|
Electrical
|
Alteration/Remodel
|
Finaled
|
07/20/2018
|
|
:
Electrical
:
Reconfigure lighting layout. Add power for 7 new work stations. 3rd floor NW corner of AT & T suite.
|
|
PRBD201807278
|
Building
|
Alteration/Remodel
|
Expired
|
08/08/2018
|
|
:
Building
:
Interior remodeling of existing office space with new office space and associated support space. 3rd floor remodeling, approx. 6,818 SF
|
|
PREL201806288
|
Electrical
|
Repair/Replace
|
Finaled
|
06/22/2018
|
|
:
Electrical
:
7 new lights, 2 dimmers, 11 receptacles in convenience store on 1st floor.
|
|
PRBD201805615
|
Building
|
Alteration/Remodel
|
Expired
|
07/24/2018
|
|
:
Building
:
Remodel of entire 16th Floor, not including core.
|
|
PREL201805184
|
Electrical
|
Repair/Replace
|
Finaled
|
06/01/2018
|
|
:
Electrical
:
PO 35536 Disconnect existing furniture feeds. Wire 20 furniture base feeds, convert (2) 3 way switches to single pole switches. Furnish and install 8 receptacles, 25 phone/data openings & miscellaneous wiring as needed.
|
|
PRBD201804416
|
Building
|
Alteration/Remodel
|
Expired
|
06/20/2018
|
|
:
Building
:
Tenant improvement gift shop
|
|
PRAL201804199
|
Fire Alarm
|
Alteration/Remodel
|
Finaled
|
05/10/2018
|
|
:
Fire Alarm
:
Installation of new fire alarm devices as per drawings. 14th floor CORRIDOR. Job A-13385
|
|
PRAL201804197
|
Fire Alarm
|
Repair/Replace
|
Finaled
|
05/10/2018
|
|
:
Fire Alarm
:
Installation of new fire alarm devices as per drawings 14th FLOOR. Job A-13384
|
|
PREL201804196
|
Electrical
|
Repair/Replace
|
Permit(s) Issued
|
05/09/2018
|
|
:
Electrical
:
Installation of new fire alarm devices as per drawings, 14th floor corridor. Job A-13385
|
|
PREL201804195
|
Electrical
|
Repair/Replace
|
Permit(s) Issued
|
05/09/2018
|
|
:
Electrical
:
Installation of new fire alarm device as per drawings 14th floor. job A-13384
|
|
PRMH201804144
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
05/08/2018
|
|
:
Mechanical
:
Furnish and install new exposed spiral duct in open ceiling areas. Relocate 1 heat pump to storage room ceiling.
|
|
PRFS201804066
|
Fire Suppression System
|
Other
|
Expired
|
05/10/2018
|
|
:
Fire Suppression System
:
Demo 6 existing heads, add 8 upright heads
|
|
PRFS201803807
|
Fire Suppression System
|
Other
|
Finaled
|
05/03/2018
|
|
:
Fire Suppression System
:
Move 6 existing heads, add 24 heads and demo 3 heads. Estify.
|
|
PRMH201803725
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
04/27/2018
|
|
:
Mechanical
:
Demo existing ductwork and replace with exposed duct. Move/replace and add heat pumps.
Eggcrate return grills, transfers. Estify at Wells Fargo Plaza
|
|
PREL201803541
|
Electrical
|
Alteration/Remodel
|
Finaled
|
04/24/2018
|
|
:
Electrical
:
22 lights - 3 20 amp circuits at Wells Fargo Plaza, 14th floor.
|
|
PRPL201803522
|
Plumbing
|
Alteration/Remodel
|
Expired
|
04/23/2018
|
|
:
Plumbing
:
Install one sink, one 6 gallon electric water heater, one standpipe, one valve for refrigerator water line, one water line for coffee, one dishwasher
|
|
PRPL201803521
|
Plumbing
|
Alteration/Remodel
|
Finaled
|
04/23/2018
|
|
:
Plumbing
:
Install one new drinking fountain, ADA, Bi-level in the corridor on the 14th floor
|
|
PRAL201803203
|
Fire Alarm
|
Other
|
Permit(s) Issued
|
04/13/2018
|
|
:
Fire Alarm
:
Replace 1 old speaker strobe and 1 old strobe-only with new. A-13355
|
|
PRAL201803202
|
Fire Alarm
|
Other
|
Permit(s) Issued
|
04/24/2018
|
|
:
Fire Alarm
:
Vacancy suite. Attached existing devices to deck on 4th floor and suite 170. A-13346
|
|
PRBD201803195
|
Building
|
Alteration/Remodel
|
Finaled
|
04/26/2018
|
|
:
Building
:
Tenant remodel of 14th Floor Corridor
|
|
PRBD201802824
|
Building
|
Alteration/Remodel
|
Finaled
|
04/30/2018
|
|
:
Building
:
Complete tenant buildout - space is currently shelled. Estify - Suite 1400
|
|
PRBD201802120
|
Building
|
Alteration/Remodel
|
Permit(s) Issued
|
04/03/2018
|
|
:
Building
:
Construct walls for the new 4th floor corridor.
|
|
PRPL201801526
|
Plumbing
|
Repair/Replace
|
Permit(s) Issued
|
02/27/2018
|
|
:
Plumbing
:
Supply and install new drinking fountain with ADA push bars at ADA height. Installed in corridor/lobby and floor 15.
|
|
PRAL201801370
|
Fire Alarm
|
Other
|
Finaled
|
02/21/2018
|
|
:
Fire Alarm
:
Adding devices for elevator lobby and corridor on 15th fl.
|
|
PRAL201801368
|
Fire Alarm
|
Other
|
Finaled
|
02/20/2018
|
|
:
Fire Alarm
:
Drop existing devices into new ceiling. A-13255
|
|
PREL201801367
|
Electrical
|
Repair/Replace
|
Permit(s) Issued
|
02/21/2018
|
|
:
Electrical
:
Adding devices for elevator lobby and corridor on 15th fl.
|
|
PREL201801239
|
Electrical
|
Alteration/Remodel
|
Finaled
|
02/14/2018
|
|
:
Electrical
:
Install (20) lights, (3) 20a circuits on the 15th fl. elevator lobby.
|
|
PRAL201801225
|
Fire Alarm
|
Repair/Replace
|
Finaled
|
02/14/2018
|
|
:
Fire Alarm
:
Relocate devices and new devices as per plans. 15th floor tenant improvement.
|
|
PREL201801224
|
Electrical
|
Repair/Replace
|
Finaled
|
02/14/2018
|
|
:
Electrical
:
A-13275 Relocate devices and new as per plans. 15th floor tenant improvement.
|
|
PRFS201800821
|
Fire Suppression System
|
Alteration/Remodel
|
Finaled
|
02/01/2018
|
|
:
Fire Suppression System
:
Add (11) new concealed pendents.
|
|
PRMH201800819
|
Mechanical/HVAC
|
Alteration/Remodel
|
Finaled
|
01/29/2018
|
|
:
Mechanical
:
Furnish and install new diffusers on existing ductwork. Relocate one heat pump. Furnish and install spiral in open ceiling. Test and rebalance.
|
|
PRFS201800815
|
Fire Suppression System
|
Alteration/Remodel
|
Finaled
|
02/06/2018
|
|
:
Fire Suppression System
:
Add (22) new concealed heads and (1) upright head for remodel.
|
|
PRMH201800793
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
01/29/2018
|
|
:
Mechanical
:
Furnish and install new 2x2 diffusers on existing ductwork in new corridor ACT
|
|
PRPL201800554
|
Plumbing
|
Alteration/Remodel
|
Finaled
|
01/22/2018
|
|
:
Plumbing
:
Breakroom: Install one sink, one instantaneous water heater, one water line for coffee, hook up dishwasher.
|
|
PRBD201800522
|
Building
|
Alteration/Remodel
|
Finaled
|
01/24/2018
|
|
:
Building
:
New finishes in the common elevator lobby and common corridor - install gypsum board ceiling in lobby. 15th floor of Wells Fargo Plaza.
|
|
PREL201800516
|
Electrical
|
Alteration/Remodel
|
Finaled
|
01/22/2018
|
|
:
Electrical
:
(37) lights, (7) sensors, (32) receptacles, (5) floor receptacles at Certes, suite 1400.
|
|
PRFS201800287
|
Fire Suppression System
|
Other
|
Finaled
|
01/12/2018
|
|
:
Fire Suppression System
:
Add and relocate (15) sprinklers.
|
|
PRFS201800171
|
Fire Suppression System
|
Other
|
Permit(s) Issued
|
01/09/2018
|
|
:
Fire Suppression System
:
Add/relocate (4) sprinkler heads for coverage in (4) corner offices on the 23rd fl.
|
|
PRMH201712270
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
01/02/2018
|
|
:
Mechanical
:
Rehab diffusers as needed.
|
|
PRBD201711945
|
Building
|
Alteration/Remodel
|
Finaled
|
01/08/2018
|
|
:
Building
:
Tenant buildout. New offices, new ceilings, new finishes.
|
|
PREL201711602
|
Electrical
|
Repair/Replace
|
Finaled
|
12/07/2017
|
|
:
Electrical
:
Relocated 2 heatpumps and 7 stats in 3rd floor
|
|
PREL201711161
|
Electrical
|
Repair/Replace
|
Permit(s) Issued
|
11/27/2017
|
|
:
Electrical
:
LED retrofit Wells Fargo Plaza sign.
|
|
PRBD201711146
|
Building
|
Alteration/Remodel
|
Finaled
|
12/19/2017
|
|
:
Building
:
Tenant remodel
|
|
PRBD201710830
|
Building
|
Alteration/Remodel
|
Permit(s) Issued
|
12/28/2017
|
|
:
Building
:
Tenant improvement. Demo existing walls and construct new walls and new finishes. (Anxiety Treatment Resource- 11th floor)
|
|
PRMH201710417
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
11/17/2017
|
|
:
Mechanical
:
Revise ductwork, add (2) heat pumps. Both pumps are the same model.
|
|
PREL201710411
|
Electrical
|
Alteration/Remodel
|
Finaled
|
11/02/2017
|
|
:
Electrical
:
Install 11 A/V devices as per plans for tenant remodel. 3rd floor of low-rise. A-13166
|
|
PRAL201710410
|
Fire Alarm
|
Alteration/Remodel
|
Finaled
|
11/02/2017
|
|
:
Fire Alarm
:
Install 11 A/V devices as per plans for tenant remodel. 3rdfloor of low-rise. A-13166
|
|
PREL201709564
|
Electrical
|
Repair/Replace
|
Finaled
|
10/09/2017
|
|
:
Electrical
:
Relocate devices and replace with new per plans on 20th floor.
|
|
PRFS201709555
|
Fire Suppression System
|
Other
|
Finaled
|
10/10/2017
|
|
:
Fire Suppression System
:
Add 2 concealed pendant sprinkler heads and relocate 1 existing head
|
|
PRAL201709455
|
Fire Alarm
|
Alteration/Remodel
|
Finaled
|
10/06/2017
|
|
:
Fire Alarm
:
Relocate devices and replace with new, per plans. 20th floor. A-13134
|
|
PRBD201709399
|
Building
|
Alteration/Remodel
|
Finaled
|
10/30/2017
|
|
:
Building
:
Demo carpet protection, temp wall and door, install owner supplied furniture, new structural steel for folding partitions, blocking, shelving, drywall, ceiling tile, hollow metal frames, wood doors and hardware, glazing, painting, signage.
|
|
PRPS201709220
|
Sign, Permanent
|
Replacement Sign
|
Finaled
|
11/27/2017
|
|
:
Sign
:
Replace existing ground/monument sign
|
|
PRMH201708865
|
Mechanical/HVAC
|
Alteration/Remodel
|
Finaled
|
09/25/2017
|
|
:
Mechanical
:
Relocate diffusers as needed. Suite 2030, Randstad in Wells Fargo Tower.
|
|
PRPL201708631
|
Plumbing
|
Alteration/Remodel
|
Finaled
|
09/13/2017
|
|
:
Plumbing
:
Remove one sink, install one sink in break room with a water heater and 2 lines for tenant's appliances. Install dishwasher.
|
|
PREL201708495
|
Electrical
|
Alteration/Remodel
|
Finaled
|
09/12/2017
|
|
:
Electrical
:
Remodel
|
|
PRFS201708475
|
Fire Suppression System
|
Alteration/Remodel
|
Finaled
|
09/18/2017
|
|
:
Fire Suppression System
:
Demo/move/add 34 heads.
|
|
PREL201708318
|
Electrical
|
Alteration/Remodel
|
Finaled
|
09/12/2017
|
|
:
Electrical
:
PO 35116: Furnish and install (1) 120' run of LED exterior-rated string lighting with cable support, (1) 180' run of LED exterior-rated string lighting with cable support, (1) exterior-rated J-box and terminations for string lights, (1) exterior-rated time clock, and exterior-rated surface-mounted conduit and circuitry from existing receptacle to the timer and J-box.
|
|
PRAL201708289
|
Fire Alarm
|
Repair/Replace
|
Finaled
|
09/15/2017
|
|
:
Fire Alarm
:
Relocate existing speaker/strobes and adding (1) strobe to Total Dynamics, Suite 2100.
|
|
PREL201708286
|
Electrical
|
Alteration/Remodel
|
Finaled
|
09/15/2017
|
|
:
Electrical
:
Fire alarm wiring for Total Dynamics, Suite 2100
|
|
PRMH201708247
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
09/07/2017
|
|
:
Mechanical
:
Relocate (2) diffusers.
|
|
PREHP201708207
|
Environmental Health Plan
|
New
|
Finaled
|
09/22/2017
|
|
:
Environmental Health Plan
:
Replacing vending area with Avanti MN Micro-market adding 3 coolers, 1 health timer and lock mechanisms, snack racks plus self check out kiosk with 30 plus days of backup and security monitored camera.
|
|
PREL201707780
|
Electrical
|
Repair/Replace
|
Permit(s) Issued
|
08/28/2017
|
|
:
Electrical
:
Replace 3000 amp main switch--not changing 50% in lighting.
|
|
PRBD201707765
|
Building
|
Alteration/Remodel
|
Finaled
|
09/27/2017
|
|
:
Building
:
Tenant improvement work to expand existing space including 1 Hr rated corridor wall and new fire door.
|
|
PRTC201705993
|
Tent/Canopy
|
Other
|
Finaled
|
07/11/2017
|
|
:
Tent/Canopy
:
AT&T BBQ
|
|
PRMH201704112
|
Mechanical/HVAC
|
Alteration/Remodel
|
Closed
|
05/23/2017
|
|
:
Mechanical
:
Amended permit on 05/30/17 to include a second gas fireplace (outdoor fire table). kisaacson 05/30/2017 9:07 AM
Install Gas fireplace.
|
|
PRPL201702053
|
Plumbing
|
Repair/Replace
|
Permit(s) Issued
|
04/03/2017
|
|
:
Plumbing
:
Supply 1 new roof drain. Re-pipe lines to serve overhang. Provide gas line from boiler room on lower level to fire pit.
|
|
PRMH201701846
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
03/27/2017
|
|
:
Mechanical
:
Replace customer supplied heat pump 2-6, move and reduct heat pump 2-7
|
|
PRMH201701845
|
Mechanical/HVAC
|
Alteration/Remodel
|
Finaled
|
03/27/2017
|
|
:
Mechanical
:
1. Furnish electrical heater for new vestibule. 2. Relocate and replace one exhaust fan courtyard. 3. Install gas piping to new fireplace.
|
|
PREL201701338
|
Electrical
|
Repair/Replace
|
Finaled
|
03/14/2017
|
|
:
Electrical
:
Remodel - switches, fixtures, receptacles, water heater connection, under cabinet lighting
|
|
PRPL201701183
|
Plumbing
|
Repair/Replace
|
Finaled
|
03/07/2017
|
|
:
Plumbing
:
Install break room sink with floor drain and water heater.
|
|
PRBD201700489
|
Building
|
Alteration/Remodel
|
Finaled
|
03/30/2017
|
|
:
Building
:
Interior remodel - first floor and common area.
|
|
PRBD201700380
|
Building
|
Alteration/Remodel
|
Finaled
|
11/06/2017
|
|
:
Building
:
Interior renovation of office interior.
|