PRUT202504826
|
Utility
|
New
|
Pending
|
|
|
:
Utility
:
Private Storm Sewer work for a renovation project at Skywater.
|
PREL202504635
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
05/06/2025
|
|
:
Electrical
:
Site work to include:
> Exterior lot lighting and signage
> Low voltage systems for gates and card access
> General power
|
PRROWO202503716
|
ROW Obstruction
|
N/A
|
Finaled
|
04/23/2025
|
|
:
Right-of-Way
:
Skywater Gates Project- We are adding 4 vehicle gates to Skywater's property at 2401 E 86th St, Bloomington, MN 55425. This requires some curb and apron tie ins at the cul de sac.
|
PREL202503186
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
04/01/2025
|
|
:
Electrical
:
2nd Quarter Maintenance.
|
PREL202501948
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/27/2025
|
|
:
Electrical
:
Provide Provisions for Summit 200 Prober
|
PRPK202501510
|
Parking Lot
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
04/23/2025
|
|
:
Parking Lot
:
We are adding vehicle gates and fencing at Skywater Technologies. This requires the parking lot to be torn up and altered.
|
PRBD202501509
|
Building
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Building
:
Skywater Gates- We are adding vehicle gates and fencing to the entrance of Skywater. This includes site work, utilities, gates/foundations, asphalt, and landscaping.
|
PRAL202501274
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
02/11/2025
|
|
:
Fire Alarm
:
Installation of new set of horn strobes, strobes and expansion module into the existing system.
|
PRFD202500975
|
Foundation
|
Other
|
Permit(s) Issued
|
02/11/2025
|
|
:
Foundation
:
Existing monument sign being transferred to new location
|
PREL202500708
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/23/2025
|
|
:
Electrical
:
Furnish and Install Pathway for Low Voltage Contractor. Sub Fab D
|
PRPS202500549
|
Sign, Permanent
|
Replacement Sign
|
Permit(s) Issued
|
|
|
:
Sign
:
Foundation permit: PRFD202500975
Electrical permit: PREL202504635
existing monument moving to new location
|
PREL202500160
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
01/07/2025
|
|
:
Electrical
:
Furnish And Install electrical Accommodations for F5X
|
PREL202500084
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/07/2025
|
|
:
Electrical
:
1St Quarter Maintenance
|
PRPL202416725
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
12/31/2024
|
|
:
Plumbing
:
Rebuild (4) RPZ.
|
PREL202416523
|
Electrical
|
Alteration/Repair/Replace
|
Permit(s) Issued
|
12/26/2024
|
|
:
Electrical
:
NRTL Inspection on Tool "CDU"
|
PRAL202414515
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
11/05/2024
|
|
:
Fire Alarm
:
Provide door holders in hallway between 2 labs on 2 sets of double doors. There are currently 3 sets of double doors in the hallway but they are removing the middle set. Provide smoke detection on both sides of doors and at new fire alarm power supply. Relay at power supply to release the doors and a monitor module for the trouble contact.
|
PREL202414513
|
Electrical
|
Other
|
Finaled
|
11/07/2024
|
|
:
Electrical
:
Furnish And Install Accommodations for Advantest A93K Tester
|
PREL202414378
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/31/2024
|
|
:
Electrical
:
Furnish and install (2) 208V 3ph 30A circuits for new chillers
|
PREL202413160
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/09/2024
|
|
:
Electrical
:
Furnish And Install Electrical For DH2.
|
PREL202412797
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/30/2024
|
|
:
Electrical
:
4th Quarter Maintenance
|
PRAL202412239
|
Fire Alarm
|
Other
|
Finaled
|
09/19/2024
|
|
:
Fire Alarm
:
Installing a ADRF Bi-Directional Amplifier Emergency Radio Coverage System for a remote BDA in the secured space and connect the remote panel via fiber to the base building panel. Interior Antenna’s will be in the (2) levels to provide in building radio coverage. The EMS radio will be in the off state until a fire alarm relay is tripped per direction from the Bloomington fire department.
|
PREL202411079
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/23/2024
|
|
:
Electrical
:
Furnish and Install Equipment And Feeders to Accommodate the electrical requirements needed for the Lam Versys 2 X 2
|
PREL202411078
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/23/2024
|
|
:
Electrical
:
Furnish and install accommodations for the Lam Kiyo
|
PREL202410731
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
08/20/2024
|
|
:
Electrical
:
Furnish and Install equipment and interconnects for Altus-S Tungsten
|
PRAL202410637
|
Fire Alarm
|
Other
|
Finaled
|
08/26/2024
|
|
:
Fire Alarm
:
Installing new fire protection system into protected space, including notification, smoke detection, manual pull stations, vesda monitoring, and sprinkler monitoring. System to be interconnected to main building panel via fiber connection for monitoring purposes.
|
PREL202409762
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/08/2024
|
|
:
Electrical
:
Furnish and Install Electrical Accommodations For Duluth AMAT Producer
|
PREL202409270
|
Electrical
|
Other
|
Expired
|
07/18/2024
|
|
:
Electrical
:
Furnish and Install new components where necessary to re-locate SPOX-401
|
PREL202409265
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/19/2024
|
|
:
Electrical
:
Furnish and Install Electrical accommodations for the Duluth Endura
|
PREL202408600
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/08/2024
|
|
:
Electrical
:
. Scope of Work A. Electrical
1. General Expenses
2. Furnish and Install 208V 3Ph 60A Power to UPS from FAB Facility
a. No transformer included. 208v distribution to be used. b. UPS Provided by Owner/Vendor.
3. Furnish and Install 208V 3Ph 40A Power from UPS to EPDU
4. Furnish and Install 208V 3Ph 16A Power from EPDU to PDU
5. Furnish and Install 208V 3Ph 16A Power from EPDU to Dry Pump #1
6. Furnish and Install 208V 3Ph 16A Power from EPDU to Dry Pump #2
7. Furnish and Install 120V 1Ph 16A Power from EPDU to Console
8. Furnish and Install 208V 3Ph 20A Power from FAB Facility to Chiller
9. Furnish and Install EMO Circuiting and Cabling
10. Furnish and Install Cable Tray
11. Furnish and Install Grounding and Bonding
12. Furnish NRTL Inspection/Certification
13. Furnish and Install (2) Floor Mounted Convenience Receptacles
|
PREL202408599
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/08/2024
|
|
:
Electrical
:
Scope of Work A. Electrical 1. General Expenses 2. Equipment 3. Small Tool Charge 4. Furnish and Install 90A 3Ph Power Feeder to 480v/208V Transformer 5. Furnish and Install 480V to 208V 75KVA Transformer 6. Furnish and Install 208V 200A 3Ph Power Feed to AC Power Box 7. Install Owner/Vendor Supplied Cabling 8. Furnish and Install Grounding and Bonding 9. Furnish and Install Cable Tray 10. Furnish and Install (2) Floor Mounted Convenience Receptacles 11. Furnish NRTL Certification
|
PREL202408333
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/27/2024
|
|
:
Electrical
:
Furnish and Install XFMR and 100 Amp Panel For COC Server Room.
|
PREL202408332
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/02/2024
|
|
:
Electrical
:
3 Quarter Maintenance
|
PREL202408076
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/24/2024
|
|
:
Electrical
:
Furnish and install Electrical For AMAT VERA
|
PREL202408074
|
Electrical
|
Other
|
Finaled
|
06/24/2024
|
|
:
Electrical
:
Electrical Installation For Tool E-Beam #3
|
PREL202408063
|
Electrical
|
Other
|
Finaled
|
06/24/2024
|
|
:
Electrical
:
Furnish And Install interconnects, Feeders, Components for Equipment for installation of Duluth Centura
|
PREL202407955
|
Electrical
|
Other
|
Finaled
|
06/21/2024
|
|
:
Electrical
:
Furnish and Install accommodations for the ASML TwinScan XT 400
|
PREL202407950
|
Electrical
|
Other
|
Finaled
|
06/21/2024
|
|
:
Electrical
:
Furnish and Install accommodations for new Multibeam 501
|
PREL202406974
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
05/31/2024
|
|
:
Electrical
:
Duluth Capstone Tool Install
|
PREL202406973
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
05/31/2024
|
|
:
Electrical
:
Bemidji CD SEM AMAT Verity 6i tool install
|
PREL202406972
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
05/31/2024
|
|
:
Electrical
:
Bemidji Tel ACT-8 tool install
|
PREL202406853
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
05/31/2024
|
|
:
Electrical
:
Install mirra tool
|
PREL202405855
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
05/08/2024
|
|
:
Electrical
:
tool install
|
PREL202405439
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
05/01/2024
|
|
:
Electrical
:
FIB 502 Tool install
|
PREL202403538
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/27/2024
|
|
:
Electrical
:
2ND Quarter Maintenance
|
PREL202401483
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/13/2024
|
|
:
Electrical
:
Install low voltage tech devices
|
PREL202401141
|
Electrical
|
Other
|
Finaled
|
02/01/2024
|
|
:
Electrical
:
Installing 400 Amp, 120/208 V Feeder to twin tub panelboards.
|
PREL202400014
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/04/2024
|
|
:
Electrical
:
1St Quarter Maintenance
|
PRFS202315116
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
01/29/2024
|
|
:
Fire Suppression System
:
Extension of an existing system for new ceilings.
|
PREL202314121
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/11/2023
|
|
:
Electrical
:
Base building for future tool fittings.
|
PREL202312740
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/19/2023
|
|
:
Electrical
:
Installing New 200 Amp 120/208 V 42 Circuit Panel.
|
PREL202312704
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
10/18/2023
|
|
:
Electrical
:
1. Provide 200A 208V power from switch gear located in room to Mirra Tool electrical rack. 200A disconnect and breaker included.
2. Provide and install 75KVA transformer.
3. 20A 120V feed from system controller to mesa cleaner, twist lock receptacle, 20A breaker.
4. 20A 208V feed from system controller to mesa cleaner, twist lock receptacle, 20A breaker
5. (2) 20A 120V feeds from system controller to ULPA filter, twist lock receptacles, 20A breakers.
6. 30A 120V feed from system controller to SMIF FABS, 30A disconnect, 30A breaker.
7. 20A 120V UPS fed quad box for PC, 20A breaker.
8. 20A 120 UPS fed quad box on back of tool, 20A breaker.
9. 20A feed for process vacuum, disconnect, 20A breaker.
10. 20A feed for scrubbed exhaust fan, disconnect, 20A breaker.
11. 20A feed for general exhaust fan, disconnect, 20A breaker.
12. 20A feed to PCW, twist lock receptacle, 20A breaker.
13. 20A feed to Mirra chem pump, twist lock receptacle, 20A breaker.
14. 20A feed to Mirra 1730 chem pump, twist lock receptacle, 20A breaker.
15. 20A feed to sanitary/HF waste pump, twist lock receptacle, 20A breaker.
16. 20A feed to storm/AWN pump, twist lock receptacle, 20A breaker.
17. ½’’ conduit from main system controller to tool EMO.
B. NRTL
C. Install (2) flush mount quad convenience receptacles.
|
PRBD202312181
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
11/17/2023
|
|
:
Building
:
Interior build-out of an existing shell space with a electronic chip manufacturing facility.
Shell permit under PRBD201914504
|
PRMH202312134
|
Mechanical/HVAC
|
Other
|
Finaled
|
10/18/2023
|
|
:
Mechanical
:
Buildout of new cleanroom space. Includes MUA Unit, boiler, pumps, fans, chillers and cooling towers.
|
PRPL202312132
|
Plumbing
|
Other
|
Finaled
|
10/18/2023
|
|
:
Plumbing
:
Plumbing work for clean room build out.
|
PREL202311643
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/27/2023
|
|
:
Electrical
:
4th Quarter Maintenance
|
PRBD202310285
|
Building
|
Other
|
Expired
|
09/27/2023
|
|
:
Building
:
Perimeter security fence.
|
PREL202306746
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/23/2023
|
|
:
Electrical
:
3rd Quarter Maintanance
|
PREL202304136
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
04/28/2023
|
|
:
Electrical
:
Tool install
|
PREL202302749
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/29/2023
|
|
:
Electrical
:
2nd Quarter Maintenance.
|
PREL202302535
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
03/21/2023
|
|
:
Electrical
:
1. Drill into live panel LP341A and install connector.
2. Install 50’ of 1”EMT pipe and 10’ of flex.
3. Pull 3 #4 and 1 #8 ground for 80amp breaker.
4. Install a 3phase 80amp breaker in live panel.
5. Connect all wiring and test voltage before turning on.
6. Live work will require 2 journeyman and proper PPE. (2241.0021)
|
PRPL202300331
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
01/13/2023
|
|
:
Plumbing
:
Complete rebuild of (1) 3/4" RPZ - replace first check, second check and relief valve
|
PREL202215510
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/27/2022
|
|
:
Electrical
:
Quarterly Maintenance
|
PREL202214293
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
11/14/2022
|
|
:
Electrical
:
9400 Additions: (2241.4683)
1. Install 70’ of 1-1/4” EMT from 208V panel for 100A 3-P breaker.
a. Energized work permit required
2. Install 50’ of 3/4” EMT from 208v panel for two 3phase breakers for trillium pumps
a. The lock load pump requires a 20a breaker
b. The process pump requires a 30a breaker
c. All pumps will have twist lock disconnect
3. Install 50’ pipe For 2 floor boxes around tool in fab for general purpose receptacles
4. The heat trace is roughly 300’.
a. Heat Trace provided by others
b. Time to install heat trace will be extensive due to amount of existing process piping.
5. Scrubber - 60’ EMT for 60a 208v breaker
a. Twist Lock Pin and Sleeve required for Quick Disconnect
|
PREL202212722
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
10/11/2022
|
|
:
Electrical
:
-3 phase 80 amp breaker in LP8330 (energized work) 1,963.00
-60' conduit, pull wire, megger the wire, Complete install 5,215.00
-Optional disconnect. Owner provided 3,056.00
-Move existing electrical pipe to make room for duct work 4,653.00
(2241.0005)
|
PREL202210865
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/29/2022
|
|
:
Electrical
:
4th Quarter Electrical
|
PREL202208820
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/25/2022
|
|
:
Electrical
:
Install UPS 403
|
PREL202208671
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/19/2022
|
|
:
Electrical
:
SKYWATER - 100A PANEL FOR IMPLANT: New 3 phase 208v 100amp sub panel for implant room with strut stand New Panel fed from LP 8010 in sub fab D tank room Core drill floor to install feeder Install 35’ of 1-1/4” EMT Need energized work permit to install feeder in LP 8010. Install 100 amp breaker in LP 8010 HVAC. (2241.4804)
|
PREL202207391
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/27/2022
|
|
:
Electrical
:
3rd Quarter Maintenance Permit
|
PREL202206764
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/14/2022
|
|
:
Electrical
:
Install 480 Volt, 75 KVA Transformer to Remote PD Cabinet (2241.4761)
|
PREL202203879
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/22/2022
|
|
:
Electrical
:
Twin Scan AHU: 60A AHU Reconnect; 40A Reheat Coil; Condensate Pump; In Line Humidistat; Space Temp Sensor (2241.4782)
|
PRFS202203329
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Ready for Issuance
|
|
|
:
Fire Suppression System
:
Add proper light hazard protection around new room.
|
PREL202203032
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/31/2022
|
|
:
Electrical
:
2nd Quarter Maintenance.
|
PRMH202201987
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
03/08/2022
|
|
:
Mechanical
:
Revising zone ductwork in Level 1 office area for existing 1,200 sf area as separate zone. Use existing VAVs - no equipment added.
|
PREL202201150
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/16/2022
|
|
:
Electrical
:
Replacing H1 Transformer and Load side switch
|
PREL202200977
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/18/2022
|
|
:
Electrical
:
Replacement of Transformer Y and And Main Switch. Also replacing Line side and load side conductors
|
PREL202200724
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/24/2022
|
|
:
Electrical
:
Tel Track: 3 qty 200 amp disconnects, and add 1 qty 400 amp transformer (2141.4892)
|
PREL202200658
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/17/2022
|
|
:
Electrical
:
install and Connect owners electrical equipment for N2 plant at SkyWater Technology.
|
PRTP202200618
|
Tank/Pipe Install/Removal
|
Alteration/Repair/Replace
|
Finaled
|
02/01/2022
|
|
:
Tank
:
Nitrogen Plant addition. Add Nitrogen process tanks and equipment to existing Nitrogen plant.
|
PREL202200254
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/12/2022
|
|
:
Electrical
:
1st Quarter Permit
|
PRBD202200178
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
01/18/2022
|
|
:
Building
:
Installing walls
|
PREL202115833
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/03/2021
|
|
:
Electrical
:
Installing a 100 AMP 480 Volt panel off UPS Panel 406 to feed Drives and Motor starters controlling sump pumps in S-104 waste water pit.
|
PREL202115832
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/07/2021
|
|
:
Electrical
:
Replacing outdoor lighting with new LED fixtures
|
PRFS202115706
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
12/09/2021
|
|
:
Fire Suppression System
:
Drop 1 sprinkler for ceiling in new mothers room
|
PREL202115329
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
11/18/2021
|
|
:
Electrical
:
4Th Quarter Maintenance
|
PRMH202114801
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
11/05/2021
|
|
:
Mechanical
:
Diffuser shuffle and ductwork reconfiguration
|
PREL202114289
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/27/2021
|
|
:
Electrical
:
Disconnect boilers and reconnect new boilers
|
PREL202114122
|
Electrical
|
Other
|
Finaled
|
10/25/2021
|
|
:
Electrical
:
1. Install 60’ of 2”EMT from panel HP 8330
2. Install non fused disconnect on line side of transformer
3. Install 75kva transformer
4. Install fused disconnect on load side
5. Install 35’ wire to bond transformer
6. Install 30’-2” EMT from disconnect to tool in fab - (2141.4851)
|
PREL202113593
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/27/2021
|
|
:
Electrical
:
Furnish and install new 13.8/480V 2000KVA Transformer with 3000 Amp switch to feed new UPS #406
|
PRMH202113545
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
10/26/2021
|
|
:
Mechanical
:
See prints. Disconnect and remove twenty (20) Lochinvar Power Fin boilers. Provide and install five (5) Advanced Thermal Hydronics KN 4,000 MBH boilers.
|
PREL202113165
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
10/04/2021
|
|
:
Electrical
:
install a twin scan requires 1 transformer and 2 tool connections off transformer (2141.4915)
|
PRFS202113031
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
10/15/2021
|
|
:
Fire Suppression System
:
Adding pendent sprinklers into a new ordinary hazard work room.
|
PRMH202112928
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
09/29/2021
|
|
:
Mechanical
:
Modify ductwork for new office space, provide and install new duct, diffusers, and re-heat coils to serve the area (2112.7667)
|
PREL202112804
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/27/2021
|
|
:
Electrical
:
Installing Lighting, power, and Data in Secure Workspace.
|
PRWE202112616
|
Well
|
Other
|
Finaled
|
09/22/2021
|
|
:
Well
:
Sealing a monitoring well.
|
PRBD202112443
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
09/28/2021
|
|
:
Building
:
Secure office buildout - within existing building - no expansion.
|
PREL202112384
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/28/2021
|
|
:
Electrical
:
1 temperature control (2160.0128)
|
PREL202112308
|
Electrical
|
Other
|
Finaled
|
09/17/2021
|
|
:
Electrical
:
Installing Lighting, phone/data, and Power in work space in fab D.
|
PREL202112082
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/16/2021
|
|
:
Electrical
:
New padmount, line and load mv conductors and terms
|
PREL202111358
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/27/2021
|
|
:
Electrical
:
Changing out a 1000 KVA Transformer that is leaking oil.
|
PREL202111229
|
Electrical
|
Other
|
Finaled
|
09/03/2021
|
|
:
Electrical
:
Install 225 KVA UPS to feed 480 Volt panelboard and 150 KVA transformer to feed 208 Volt panelboard. Both panels will supply power various tools in sub fab.
|
PREL202111130
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/25/2021
|
|
:
Electrical
:
Maintenance
|
PREL202111108
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
08/26/2021
|
|
:
Electrical
:
JOB 81785 PROJECT ICE CASTLE N2 PLANT PHASE 2
|
PRTP202110099
|
Tank/Pipe Install/Removal
|
Alteration/Repair/Replace
|
Expired
|
08/05/2021
|
|
:
Tank
:
Install (3) new 15k gallon Nitrogen tanks to replace (2) existing 15k gallon Nitrogen tanks.
|
PREL202109808
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/30/2021
|
|
:
Electrical
:
Install of equipment, piping and wiring for out of state contractor for the N2 plant.
|
PREL202109636
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
07/27/2021
|
|
:
Electrical
:
Two Temperature Controllers - BAS low voltage - Nitrogen Plant (2160.0101)
|
PRBD202109583
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
09/01/2021
|
|
:
Building
:
Build an office space in a large open area. Walls to be 3 5/8" metal studs, 5/8" rock both sides, non rated insulated for sound. Height on outside of room to be 9'-0" AFF Ceiling to be 7'-6" AFF
Ceiling to be acoutical ceiling tile
|
PRMH202109495
|
Mechanical/HVAC
|
Alteration/Repair/Replace
|
Finaled
|
08/04/2021
|
|
:
Mechanical
:
Replace existing air handling unit with new unit. Reroute gas piping to new location. Nitrogen plant, phase 2 (2112.7631)
|
PREL202108354
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/14/2021
|
|
:
Electrical
:
Install of Cable Tray and wiring into a 3000 amp service.
|
PREL202108351
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
07/14/2021
|
|
:
Electrical
:
Install and tie in of UPS 404
|
PREL202108097
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/28/2021
|
|
:
Electrical
:
Electrical work for a Primary Chilled Water Pump (2141.4786)
|
PREL202108093
|
Electrical
|
Other
|
Finaled
|
06/30/2021
|
|
:
Electrical
:
General Maintenance for 3rd quarter
|
PREL202106501
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
06/15/2021
|
|
:
Electrical
:
Conductor and termination upgrades (primary and secondary)
|
PREL202105412
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
05/11/2021
|
|
:
Electrical
:
General Maintenance
|
PRFD202104054
|
Foundation
|
Alteration/Repair/Replace
|
Finaled
|
06/02/2021
|
|
:
Foundation
:
Grading & foundation work for future tank & equipment installation that will be performed by others at a later day.
|
PRPL202104049
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
04/13/2021
|
|
:
Plumbing
:
Rebuild (3) RPZ.
|
PRCRF202104005
|
Roof, Commercial
|
Alteration/Repair/Replace
|
Expired
|
05/10/2021
|
|
:
Roofing
:
Complete tear off to deck. Putting back fully adhered EPDM
|
PREL202102109
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
03/03/2021
|
|
:
Electrical
:
Electrical Hook-Up for RTA Equipment. (2141.4728)
|
PREL202101954
|
Electrical
|
Alteration/Repair/Replace
|
Issued
|
03/01/2021
|
|
:
Electrical
:
Install pre-action detection, alarm and releasing system.
|
PRFS202101953
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Expired
|
03/04/2021
|
|
:
Fire Suppression System
:
Install preaction system to protect updated Server Room and Records Room
|
PREL202101880
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
03/02/2021
|
|
:
Electrical
:
Electrical Hook-Up for E-Beam Room Mechanical Equipment; Air Handling Unit, Humidifier, Electric Heat Coil (2141.4987)
|
PREL202101879
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
03/02/2021
|
|
:
Electrical
:
Electrical Hook-Up for chem dock. Conduit with (2) 20A Circuits run to hallway to refrigerators; install isopropyl alcohol refrigeration machine.
|
PRFS202101826
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
03/04/2021
|
|
:
Fire Suppression System
:
Demo existing wet pipe in future IT room. Install new galvanized pipe & sprinklers for a future double interlock pre-action system in it's place. Install a new control valve in stair ST1, where future pre-action valve will be located.
|
PRPL202100607
|
Plumbing
|
Alteration/Repair/Replace
|
Finaled
|
02/01/2021
|
|
:
Plumbing
:
Install (1) RPZ handling chemical cabinets and burn boxes.
|
PREL202100372
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
01/14/2021
|
|
:
Electrical
:
General Maintenance
|
PREL202015482
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
12/24/2020
|
|
:
Electrical
:
Electrical Hook-Up for AFM501 Equip (2041.4630)
Electrical Hook-Up for AFM501 Equipment
|
PREL202015481
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
12/24/2020
|
|
:
Electrical
:
Electrical Hook-Up for EBEAM501 Equipment (2041.4629)
Electrical Hook-Up for EBEAM5021 Equipment (per email from Horwitz)
|
PREL202015477
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
12/24/2020
|
|
:
Electrical
:
Electrical Hook-Up for FIB501 Equip (2041.4627)
|
PREL202015475
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
12/24/2020
|
|
:
Electrical
:
Electrical Hook-Up for EBEAM502 Equipment (2041.4628)
Electrical Hook-Up for EBEAM501 Equipment
|
PRFS202014449
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
11/24/2020
|
|
:
Fire Suppression System
:
Tie into existing dry system to feed new silane storage structure - 3 Heads
|
PRFD202014330
|
Foundation
|
Other
|
Finaled
|
01/08/2021
|
|
:
Foundation
:
Grading and foundation work for future tank installation that will performed by others at a later date.
|
PREL202013692
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
11/06/2020
|
|
:
Electrical
:
Raider FEOL, 80A feeder (2041.4578) wire feed to transformer
|
PREL202013616
|
Electrical
|
Alteration/Repair/Replace
|
Expired
|
11/02/2020
|
|
:
Electrical
:
Electrical Hook-up for VERITY 501 Equipment (2041.4579)
|
PREL202013381
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/30/2020
|
|
:
Electrical
:
Wire power to slurry and raider waste equipment as part of chem dock project
|
PREL202012955
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/20/2020
|
|
:
Electrical
:
JOB 81782-101 SILANE STORAGE AT PROJECT ICE CASTLE - CONCRETE SLAB SNOW MELT AND POWER FOR TANK JACKET HEATERS
|
PRBD202012644
|
Building
|
New
|
Expired
|
11/03/2020
|
|
:
Building
:
Exterior Silane Storage Structure
|
PREL202012382
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/15/2020
|
|
:
Electrical
:
Install of the SEZ/SCRUB machine for Skywater
|
PREL202012381
|
Electrical
|
Other
|
Finaled
|
10/15/2020
|
|
:
Electrical
:
Work already completed on the Evatec machine at Skywater
|
PREL202012308
|
Electrical
|
Other
|
Finaled
|
10/12/2020
|
|
:
Electrical
:
Manufacturing Tool Installation: AMAT Producer, in FAB D
|
PREL202011846
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/06/2020
|
|
:
Electrical
:
JOB 81782-101 SKYWATER WIRING OF CUSTOMER PROVIDED TOOLS
|
PREL202011773
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
10/27/2020
|
|
:
Electrical
:
Quarterly Service Maintenance
|
PREL202011772
|
Electrical
|
Other
|
Finaled
|
10/27/2020
|
|
:
Electrical
:
Quarterly Service Maintenance
|
PRFD202009904
|
Foundation
|
Other
|
Finaled
|
09/18/2020
|
|
:
Foundation
:
Foundation for monument Sign
|
PREL202009879
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
09/09/2020
|
|
:
Electrical
:
JOB 81782 PROJECT ICE CASTLE - SIGNS - ELECTRICAL FOR (1) 20A MONUMENT SIGN AND (1) 20A BUILDING SIGN - MARK CHUBA 612-240-5416
|
PRPS202009768
|
Sign, Permanent
|
New Sign
|
Finaled
|
09/18/2020
|
|
:
Sign
:
New building sign for SE corner of building. (existing signage to be removed).
|
PREL202009511
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/25/2020
|
|
:
Electrical
:
DaVinci Tool Hook up.
|
PREL202009509
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
08/25/2020
|
|
:
Electrical
:
Rapier Tool Hook up
|
PRUT202007978
|
Utility
|
New
|
Finaled
|
08/14/2020
|
|
:
Utility
:
5/8" Badger Fire meter SN 44217894 Reading 999999
|
PRFS202006638
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
08/04/2020
|
|
:
Fire Suppression System
:
Removing wet sprinklers from two rooms and replacing them with a foam system.
|
PRUT202006486
|
Utility
|
New
|
Finaled
|
06/24/2020
|
|
:
Utility
:
New meter 2" Sensus C@ domestic meter. SN# 87432098 Reading 00000100
|
PRAL202005805
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
06/23/2020
|
|
:
Fire Alarm
:
Building addition. Expanding existing fire alarm system into new addition.
|
PREL202002940
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
04/21/2020
|
|
:
Electrical
:
Temperature Control Wiring
|
PRROWU202002402
|
ROW Underground
|
N/A
|
Finaled
|
04/08/2020
|
|
:
Right-of-Way
:
Cable pulling and boring roughly 9,000ft of UG cable
|
PRBD202001615
|
Building
|
Alteration/Repair/Replace
|
Finaled
|
04/02/2020
|
|
:
Building
:
Interior Construction
|
PRFS202001382
|
Fire Suppression System
|
Other
|
Finaled
|
07/06/2020
|
|
:
Fire Suppression System
:
New Wet Sprinkler Sysytem - 2 systems - 650 Heads
New Dry Sprinkler System - 1 system - 9 Heads
New Standpipe System - 10 Hose Valves
|
PRFS202001310
|
Fire Suppression System
|
Alteration/Repair/Replace
|
Finaled
|
02/12/2020
|
|
:
Fire Suppression System
:
Replacing all of the pipe and sprinklers on the system side of the dry pipe valve for the out building on the North side of the property.
|
PREL202001241
|
Electrical
|
Alteration/Repair/Replace
|
Issued
|
02/11/2020
|
|
:
Electrical
:
Elevator Modernization for 1 car
|
PREL202001000
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/28/2020
|
|
:
Electrical
:
Quarterly Service Maintenance
|
PRROWU202000519
|
ROW Underground
|
N/A
|
Finaled
|
01/13/2021
|
|
:
Right-of-Way
:
20-E001 Boring in new 3 Phase UG for temp transformer
|
PRPL202000361
|
Plumbing
|
Other
|
Finaled
|
01/31/2020
|
|
:
Plumbing
:
Building Expansion at Skywater. Above ground portion.
Underground is Permit is PRPL201911638
|
PRMH202000360
|
Mechanical/HVAC
|
Other
|
Permit(s) Issued
|
01/31/2020
|
|
:
Mechanical
:
Building Expansion at Skywater
|
PRTP201915115
|
Tank/Pipe Install/Removal
|
Other
|
Closed
|
12/23/2019
|
|
:
Tank
:
set 500 gallon LP tank for temp heat on job site
|
PREL201914864
|
Electrical
|
Other
|
Finaled
|
12/12/2019
|
|
:
Electrical
:
JOB 81782 PROJECT ICE CASTLE - CLEAN ROOM ADDITION
NEW ELECTRICAL SERVICE - UPS SYSTEM - GENERATOR MEDIUM VOLTAGE SWITCHGEAR
|
PRBD201914504
|
Building
|
Addition
|
Finaled
|
01/13/2020
|
|
:
Building
:
New 2 story steel precast addition - core & shell only.
|
PREL201914458
|
Electrical
|
Other
|
Finaled
|
12/03/2019
|
|
:
Electrical
:
JOB 81782 SKYWATER TECHNOLOGY FOUNDRY 400A, 480V TEMP SERVICE AND (4) 100A, 208V FEEDS TO CONSTRUCTION TRAILERS
MARK CHUBA 612-240-5416
|
PRPL201911638
|
Plumbing
|
Other
|
Finaled
|
11/12/2019
|
|
:
Plumbing
:
New construction - For underground portion only.
|
PRUT201911087
|
Utility
|
Alteration/Repair/Replace
|
Finaled
|
11/19/2019
|
|
:
Utility
:
Re-route of existing water, sanitary and Storm Sewer associated with the building addition at 2401 E 86th St. Skywater Technology
|
PRFD201910928
|
Foundation
|
Other
|
Finaled
|
11/14/2019
|
|
:
Foundation
:
Footings & Foundation
|
PRGR201910921
|
Grading
|
Other
|
Expired
|
10/24/2019
|
|
:
Grading
:
Grading
|
PRDE201910912
|
Demolition
|
Other
|
Finaled
|
10/17/2019
|
|
:
Demolition
:
Building demo
|
PRWE201908159
|
Well
|
Other
|
Finaled
|
07/22/2019
|
|
:
Well
:
Geotechnical soil borings for AET Project 20-21467
|
PREL201905854
|
Electrical
|
Alteration/Repair/Replace
|
Closed
|
06/06/2019
|
|
:
Electrical
:
1 new wall sign 20 amp Circuit
|
PRPS201904703
|
Sign, Permanent
|
New Sign
|
Finaled
|
05/14/2019
|
|
:
Sign
:
New sign to be install
|
PREL201901561
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
02/25/2019
|
|
:
Electrical
:
1-20 Circuit Furnish Power to 1 X tool
|
PRFD201900758
|
Foundation
|
Alteration/Repair/Replace
|
Finaled
|
03/22/2019
|
|
:
Foundation
:
New monument sign
|
PRAL201900079
|
Fire Alarm
|
Alteration/Repair/Replace
|
Finaled
|
10/22/2019
|
|
:
Fire Alarm
:
Replacing all the existing horn strobes and power supplies to sync the strobes of the fire alarm throughout the building.
|
PRFS201815576
|
Fire Suppression System
|
Other
|
Finaled
|
01/02/2019
|
|
:
Fire Suppression System
:
Hook up, start up and function testing an existing system pre-installed on a tool.
|
PREL201815191
|
Electrical
|
Alteration/Repair/Replace
|
Finaled
|
12/19/2018
|
|
:
Electrical
:
Furnish power to the M330X - 3 Circuits
|
PRTP201814379
|
Tank/Pipe Install/Removal
|
Alteration/Repair/Replace
|
Finaled
|
12/14/2018
|
|
:
Tank
:
Work to be done at SkyWater Technology Foundry. Work is the replacement of an old propane/air mixer and vaporizer with a new unit. Unit will also be moved approximately 50 ft from the old location.
|
PREL201814174
|
Electrical
|
Alteration/Remodel
|
Finaled
|
11/16/2018
|
|
:
Electrical
:
Addition of 4 Notification Devices to an existing fire alarm system.
|
PRAL201814172
|
Fire Alarm
|
Other
|
Finaled
|
12/10/2018
|
|
:
Fire Alarm
:
Addition of 4 Notification Devices to an existing Fire alarm System going into a clean room
|
PRMH201813236
|
Mechanical/HVAC
|
Repair/Replace
|
Finaled
|
10/29/2018
|
|
:
Mechanical
:
This is a re-submittal by the licensed contractor Utility Energy Systems for work to be done at SkyWater Technology Foundry, work is the replacement of an old propane/air mixer and vaporizer with a new unit. Unit will also be moved by approximately 50 ft from the old location.
|
PRFS201812239
|
Fire Suppression System
|
Alteration/Remodel
|
Finaled
|
10/17/2018
|
|
:
Fire Suppression System
:
ADD/RELOCATE 27 SPRINKLER HEADS PER PLANS
|
PRMH201808979
|
Mechanical/HVAC
|
Alteration/Remodel
|
Closed
|
08/24/2018
|
|
:
Mechanical
:
New HVAC for clean room. Daikin, 818,827 BTU's, 10,000 CFM, Model #OAH024GDGM, Hydronic fuel.
|
PRBD201808522
|
Building
|
Alteration/Remodel
|
Finaled
|
08/24/2018
|
|
:
Building
:
Build a clean room inside an existing clean room. Excavate and place a concrete pad for an Make up air units(2) on exterior of building
|
PRPS201803013
|
Sign, Permanent
|
New Sign
|
Finaled
|
05/01/2018
|
|
:
Sign
:
New Monument Sign
|
PRPS201802448
|
Sign, Permanent
|
Replacement Sign
|
Finaled
|
03/29/2018
|
|
:
Sign
:
1. Fabricate and install an all aluminum frame & face pan sign .
2. Pan sign slips over existing wall sign
3 Anchor pan to under frame with TEK screw 1/4” x 1.25“ self tapping
4. Paint all surfaces with polyurethane enamel o white,
giving the sign a monolithic look.
5. Digital print of logo & name applied rst surface
|
PREHP201801279
|
Environmental Health Plan
|
New
|
Finaled
|
07/09/2018
|
|
:
Environmental Health Plan
:
Replacing vending area with micro mart.
|
PRPS201702361
|
Sign, Permanent
|
Replacement Sign
|
Finaled
|
11/29/2017
|
|
:
Sign
:
Replace two existing "Cypress" halo illuminated letters from pan sign and install two new aluminum panels inside existing blue frames reading "Skywater Technology Foundry".
|